Bids Are invited for Repair And Overhauling Service - Replacement Of Grm Mounts Onboard In Ship; Any Other Suitable Brand; No; Buyer Premises - Degutting Of Pipe Lines, Ducting, Etc In Way Of Low Speed Coupling (Port) , Degutting Of Pipe Lines, Ducti
Tender Overview
Project Description
Bids Are invited for Repair And Overhauling Service - Replacement Of Grm Mounts Onboard In Ship; Any Other Suitable Brand; No; Buyer Premises - Degutting Of Pipe Lines, Ducting, Etc In Way Of Low Speed Coupling (Port) , Degutting Of Pipe Lines, Ducting, Etc In Way Of Low Speed Coupling (Stbd) , Pre-Alignment Check Between Gearbox Output Flange And Intermediate Shaft (Port) , Pre-Alignment Check Between Gearbox Output Flange And Intermediate Shaft (Stbd) , Degutting And Removal Of Pipe Lines, Chequered Flooring. Etc In Way Of Sv Mounts (Port) , Degutting And Removal Of Pipe Lines, Chequered Flooring. Etc In Way Of Sv Mounts (Stbd) , Grouping Of Mounts, Calculation Of Mounts Placements On The Basis Of Creep Loading Checks , Removal Of Replacement Of Existing Mounts With Grouped Mounts (Port) , Removal Of Replacement Of Existing Mounts With Grouped Mounts (Stbd) , Re-Gutting Of Pipe Lines, Chequered Flooring, Etc In Way Of Sv Mounts (Port) , Re-Gutting Of Pipe Lines, Chequered Flooring, Etc In Way Of Sv Mounts (Stbd) , Post-Alignment Checks Between Gearbox Output Flange And Intermediate Shaft (Port) , Post-Alignment Checks Between Gearbox Output Flange And Intermediate Shaft (Stbd) , Any Fasteners, Gaskets Required For The Regutting Of System Pipeline Will Be In Firm Scope , Re-Gutting Of Pipe Lines, Ducting, Etc In Way Low Speed Coupling (Port) , Re-Gutting Of Pipe Lines, Ducting, Etc In Way Low Speed Coupling (Stbd) , Cleaning Of Area Around And Below Grm And Coupling (Port & Stbd)
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Degutting of pipe lines, ducting, etc in way of low speed coupling (Port) | Degutting of pipe lines, ducting, etc in way of low speed coupling (Port) |
| 2 | Degutting of pipe lines, ducting, etc in way of low speed coupling (Stbd) | Degutting of pipe lines, ducting, etc in way of low speed coupling (Stbd) |
| 3 | Pre-Alignment check between Gearbox output flange and intermediate shaft (Port) | Pre-Alignment check between Gearbox output flange and intermediate shaft (Port) |
| 4 | Pre-Alignment check between Gearbox output flange and intermediate shaft (Stbd) | Pre-Alignment check between Gearbox output flange and intermediate shaft (Stbd) |
| 5 | Degutting and removal of Pipe lines, chequered flooring. etc in way of SV Mounts (Port) | Degutting and removal of Pipe lines, chequered flooring. etc in way of SV Mounts (Port) |
| 6 | Degutting and removal of pipe lines, chequered flooring. etc in way of SV Mounts (Stbd) | Degutting and removal of pipe lines, chequered flooring. etc in way of SV Mounts (Stbd) |
| 7 | Grouping of mounts, calculation of mounts placements on the basis of creep loading checks | Grouping of mounts, calculation of mounts placements on the basis of creep loading checks |
| 8 | Removal of replacement of existing mounts with grouped mounts (Port) | Removal of replacement of existing mounts with grouped mounts (Port) |
| 9 | Removal of replacement of existing mounts with grouped mounts (Stbd) | Removal of replacement of existing mounts with grouped mounts (Stbd) |
| 10 | Re-gutting of pipe lines, chequered flooring, etc in way of SV Mounts (Port) | Re-gutting of pipe lines, chequered flooring, etc in way of SV Mounts (Port) |
| 11 | Re-gutting of pipe lines, chequered flooring, etc in way of SV Mounts (Stbd) | Re-gutting of pipe lines, chequered flooring, etc in way of SV Mounts (Stbd) |
| 12 | Post-Alignment checks between Gearbox output flange and intermediate Shaft (Port) | Post-Alignment checks between Gearbox output flange and intermediate Shaft (Port) |
| 13 | Post-Alignment checks between Gearbox output flange and intermediate Shaft (Stbd) | Post-Alignment checks between Gearbox output flange and intermediate Shaft (Stbd) |
| 14 | Any fasteners, gaskets required for the regutting of system pipeline will be in firm scope | Any fasteners, gaskets required for the regutting of system pipeline will be in firm scope |
| 15 | Re-gutting of pipe lines, ducting, etc in way low speed coupling (Port) | Re-gutting of pipe lines, ducting, etc in way low speed coupling (Port) |
| 16 | Re-gutting of pipe lines, ducting, etc in way low speed coupling (Stbd) | Re-gutting of pipe lines, ducting, etc in way low speed coupling (Stbd) |
| 17 | Cleaning of area around and below GRM and coupling (Port & Stbd) | Cleaning of area around and below GRM and coupling (Port & Stbd) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 10 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 10 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender