Tender For A. Strengthening And Black Topping To Gangapur To Umbadga Road Km. 0/00 To 1/500 Vr-167 Tq. Latur Under 3054-3139 2025-26 B. Strengthening And Black Topping To Sh -242 To Gangapur Road Km. 0/00 To 3/00 Vr -116 Tq. Latur Under Dpdc 3054-313
Tender Overview
Project Description
Tender for A. Strengthening And Black Topping To Gangapur To Umbadga Road Km. 0/00 To 1/500 Vr-167 Tq. Latur Under 3054-3139 2025-26 B. Strengthening And Black Topping To Sh -242 To Gangapur Road Km. 0/00 To 3/00 Vr -116 Tq. Latur Under Dpdc 3054-3139 Year 2025-26
BOQ
| Sl. No. | Item Description |
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. MORTH 201A) S.T.B.T. TO GANGAPUR TO UMBADGA ROAD KM. 0/00 TO 1/500 VR-167 |
| 2 | B) S.T.B.T. TO SH -242 TO GANGAPUR ROAD KM. 0/00 TO 3/00 VR -116 |
| 3 | Dismantling of existing B.T. Surface (flexible Pavement) to a depth of 50 mm. manually including loading of dismantled material to transport vehicle at site excluding lead charges MORTH 202A) S.T.B.T. TO GANGAPUR TO UMBADGA ROAD KM. 0/00 TO 1/500 VR-167 |
| 4 | Excavation for foundation in earth, soils of all types, sand, gravel, soft murum including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete. a) Upto 1.50m lift Normal Rate BR.3 Page No. 102A) S.T.B.T. TO GANGAPUR TO UMBADGA ROAD KM. 0/00 TO 1/500 VR-167 |
| 5 | Providing soling using 80 mm size trap metal in 15 cm. layer including filling voids with Crushed sand/grit, ramming, watering etc. complete.A) S.T.B.T. TO GANGAPUR TO UMBADGA ROAD KM. 0/00 TO 1/500 VR-167 |
| 6 | Providing and laying in situ / ready mix cement concrete of M-10 proportion with trap/ granite/ quartzite/ gneiss metal in foundation including necessary form work, compacting and curing etc. complete. (with reversible drum type mixer with SCADA with fine agreegates of required specifications (Natural sand / VSI sand finely washed etc ) CD.-3 Page.No. 160A) S.T.B.T. TO GANGAPUR TO UMBADGA ROAD KM. 0/00 TO 1/500 VR-167 |
| 7 | Providing and laying cement concrete pipe of IS 458:2003 NP-3 class of 900mm diameter in proper line, level and slope etc. complete. CD.7 Page.No. 162A) S.T.B.T. TO GANGAPUR TO UMBADGA ROAD KM. 0/00 TO 1/500 VR-167 |
| 8 | B) S.T.B.T. TO SH -242 TO GANGAPUR ROAD KM. 0/00 TO 3/00 VR -116 |
| 9 | Providing cast in situ / ready mix M10 grade cement concrete for head walls of CD work / retaining walls etc. including necessary form work, compaction, finishing and curing etc. complete. (with reversible drum type mixer/ concrete batch mix plant (pan mixer) with SCADA with fine agreegates of required specifications (Natural sand / VSI sand finely washed etc ), cement 4.05 bags/cumt) CD 8 Page 163A) S.T.B.T. TO GANGAPUR TO UMBADGA ROAD KM. 0/00 TO 1/500 VR-167 |
| 10 | Providing selected hard murum filling including laying in layers of 15 to 20cmwith watering and compacting etc. complete. CD.14 Page.No. 167A) S.T.B.T. TO GANGAPUR TO UMBADGA ROAD KM. 0/00 TO 1/500 VR-167 |
| 11 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete. MORTH 408A) S.T.B.T. TO GANGAPUR TO UMBADGA ROAD KM. 0/00 TO 1/500 VR-167 |
| 12 | B) S.T.B.T. TO SH -242 TO GANGAPUR ROAD KM. 0/00 TO 3/00 VR -116 |
| 13 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)80 mm Metal, By breaking Boulders (Hand broken). A) S.T.B.T. TO GANGAPUR TO UMBADGA ROAD KM. 0/00 TO 1/500 VR-167 |
| 14 | B) S.T.B.T. TO SH -242 TO GANGAPUR ROAD KM. 0/00 TO 3/00 VR -116 |
| 15 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)40 mm Metal, By breaking Boulders (Hand broken).A) S.T.B.T. TO GANGAPUR TO UMBADGA ROAD KM. 0/00 TO 1/500 VR-167 |
| 16 | B) S.T.B.T. TO SH -242 TO GANGAPUR ROAD KM. 0/00 TO 3/00 VR -116 |
| 17 | Supplying soft murum at the road site, including conveying and stacking complete. MORTH 408A) S.T.B.T. TO GANGAPUR TO UMBADGA ROAD KM. 0/00 TO 1/500 VR-167 |
| 18 | B) S.T.B.T. TO SH -242 TO GANGAPUR ROAD KM. 0/00 TO 3/00 VR -116 |
| 19 | Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge .A) S.T.B.T. TO GANGAPUR TO UMBADGA ROAD KM. 0/00 TO 1/500 VR-167 |
| 20 | B) S.T.B.T. TO SH -242 TO GANGAPUR ROAD KM. 0/00 TO 3/00 VR -116 |
| 21 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete. MORTH 408A) S.T.B.T. TO GANGAPUR TO UMBADGA ROAD KM. 0/00 TO 1/500 VR-167 |
| 22 | B) S.T.B.T. TO SH -242 TO GANGAPUR ROAD KM. 0/00 TO 3/00 VR -116 |
| 23 | Compacting the hard murum side widths including laying in layers on each side with power roller including artificial watering etc. complete. MORTH 408A) S.T.B.T. TO GANGAPUR TO UMBADGA ROAD KM. 0/00 TO 1/500 VR-167 |
| 24 | B) S.T.B.T. TO SH -242 TO GANGAPUR ROAD KM. 0/00 TO 3/00 VR -116 |
| 25 | Compacting the sub grade/gravel/oversize metal (200 mm loose) layers for all width with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. A) S.T.B.T. TO GANGAPUR TO UMBADGA ROAD KM. 0/00 TO 1/500 VR-167 |
| 26 | B) S.T.B.T. TO SH -242 TO GANGAPUR ROAD KM. 0/00 TO 3/00 VR -116 |
| 27 | Compacting the sub grade / gravel / size metal (100 mm loose) layers for all widths with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. A) S.T.B.T. TO GANGAPUR TO UMBADGA ROAD KM. 0/00 TO 1/500 VR-167 |
| 28 | B) S.T.B.T. TO SH -242 TO GANGAPUR ROAD KM. 0/00 TO 3/00 VR -116 |
| 29 | Providing and constructing 75 mm. thick Modified Penetration Macadam (MPM) road surface including all materials, preparing the existing road surface, spreading 40 mm. stone metal layers 30% crusher broken metal + 70% Hand broken (by breaking rubble obtained by blasting) heating and spraying the bitumen of specified grade @ 2 Kg/sqm, spreading 12 mm.size chips compacting with three wheel static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc. complete. Including picking of existing WBM surface. (VG-30 bulk bitumen rates are considered to arrive at rates)A) S.T.B.T. TO GANGAPUR TO UMBADGA ROAD KM. 0/00 TO 1/500 VR-167 |
| 30 | B) S.T.B.T. TO SH -242 TO GANGAPUR ROAD KM. 0/00 TO 3/00 VR -116 |
| 31 | Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen with sprayer on Dry / Hungry B.T. surface 3 kg/10 sqm. (VG-30 bulk bitumen rates are considered to arrive at rates) MORTH 503A) S.T.B.T. TO GANGAPUR TO UMBADGA ROAD KM. 0/00 TO 1/500 VR-167 |
| 32 | B) S.T.B.T. TO SH -242 TO GANGAPUR ROAD KM. 0/00 TO 3/00 VR -116 |
| 33 | Open Graded Premix Surfacing- Providing and Laying OGC 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates premixed with bituminous binder transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction but excluding prime / tack and Seal coat. For Bitumen of specified grade--USING drum mix type hot mix plant with SCADA, Paver and Vibratory roller ( Over MPM Surface) (VG-30 bulk bitumen rates are considered to arrive at rates) MORTH 511A) S.T.B.T. TO GANGAPUR TO UMBADGA ROAD KM. 0/00 TO 1/500 VR-167 |
| 34 | B) S.T.B.T. TO SH -242 TO GANGAPUR ROAD KM. 0/00 TO 3/00 VR -116 |
| 35 | Providing bituminous Type A liquid seal coat on bituminous surface including supplying all materials and bitumen of specified grade preparing existing road surface, heating and applying bitumen @ 0.98 KgSqm. by mechanical means, spreading chips and rolling, by static roller having weight 8 to 10 MT. etc. complete. (VG-30 bulk bitumen rates are considered to arrive at rates). MORTH 513A) S.T.B.T. TO GANGAPUR TO UMBADGA ROAD KM. 0/00 TO 1/500 VR-167 |
| 36 | B) S.T.B.T. TO SH -242 TO GANGAPUR ROAD KM. 0/00 TO 3/00 VR -116 |
| 37 | Fixing in position Road Junction/ Informatory Sign Board in ground with C.C.1:4:8 block of 60cm x 60cm x 75cm size including all leads complete. MORTH 801A) S.T.B.T. TO GANGAPUR TO UMBADGA ROAD KM. 0/00 TO 1/500 VR-167 |
| 38 | B) S.T.B.T. TO SH -242 TO GANGAPUR ROAD KM. 0/00 TO 3/00 VR -116 |
| 39 | ROYALTY CHARGES FOR OTHER MINERALSA) S.T.B.T. TO GANGAPUR TO UMBADGA ROAD KM. 0/00 TO 1/500 VR-167 |
| 40 | B) S.T.B.T. TO SH -242 TO GANGAPUR ROAD KM. 0/00 TO 3/00 VR -116 |
| 41 | Laboratory testing charges are not considered in the Rate Abstracts. Where ever required separate item shall be taken in the estimate for material testing charges, on the basis of testing frequency and charges fixed by Vigilance & Quality Control Circle, for the current year and shall form part of tender. testing of material by Quality control and certified quality must be use by contractor. BASIC test of Aggregate- Water Absorption, Specific Gravity, Imapct Value, Crushing ValueA) S.T.B.T. TO GANGAPUR TO UMBADGA ROAD KM. 0/00 TO 1/500 VR-167 |
| 42 | B) S.T.B.T. TO SH -242 TO GANGAPUR ROAD KM. 0/00 TO 3/00 VR -116 |
| 43 | BITUMEN - Penetration, Softening Point, Flash & Fire Point, Specific GravityA) S.T.B.T. TO GANGAPUR TO UMBADGA ROAD KM. 0/00 TO 1/500 VR-167 |
| 44 | B) S.T.B.T. TO SH -242 TO GANGAPUR ROAD KM. 0/00 TO 3/00 VR -116 |
| 45 | PART II- ADD 18% GST A) S.T.B.T. TO GANGAPUR TO UMBADGA ROAD KM. 0/00 TO 1/500 VR-167 |
| 46 | B) S.T.B.T. TO SH -242 TO GANGAPUR ROAD KM. 0/00 TO 3/00 VR -116 |
| 47 | 1% FOR LABOUR INSURANCEA) S.T.B.T. TO GANGAPUR TO UMBADGA ROAD KM. 0/00 TO 1/500 VR-167 |
| 48 | 0.50% FOR LABOUR INSURANCEB) S.T.B.T. TO SH -242 TO GANGAPUR ROAD KM. 0/00 TO 3/00 VR -116 Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents