Tender For Terrace Covering With Crca Sheet Of Atomic Energy School No.1,3,6 And Atomic Energy Junior College (Aejc) Buildings, At Anushaktinagar, Mumbai

Issued by Government Departments · Mumbai Suburban, Maharashtra
Tender Value
5.28 Crore
Estimated cost
Bid Submission
05 Aug 2026
13 days left
EMD
10.57 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Mumbai Suburban → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Terrace Covering With Crca Sheet Of Atomic Energy School No.1,3,6 And Atomic Energy Junior College (Aejc) Buildings, At Anushaktinagar, Mumbai

BOQ

Name of Work:- Terrace Covering With CRCA Sheet Of Atomic Energy School No.1,3,6 and Atomic Energy Junior College (AEJC) Buildings, at Anushaktinagar, Mumbai
Sl. No. Item Description
1Tender Inviting Authority: Name of Work: Terrace Covering With CRCA Sheet Of Atomic Energy School No.1,3,6 and Atomic Energy Junior College (AEJC) Buildings, at Anushaktinagar, Mumbai NIT No: DCSEM/CQD/QSB/AES-AEJC/26-27/NIT/28 dt.10.07.2026
2The site is situated at Anushaktinagar, Mumbai
3The tenderers are advised to visit the site of work & its surroundings, with prior permission of Engineer-in-charge/authorised representative, to acquaint themselves about the location of work, accessibility to the site, level of sub-soil water, drainage facility for dewatering and any other matter relating to availability and carriage of construction materials, nature of work etc., and satisfy themself and then quote the rates accordingly. A Tenderer shall be deemed to have full knowledge of the site whether he inspects it or not and NO extra charges consequent on any misunderstanding or otherwise shall be allowed.
4Tenderers shall visit the site of work, at their own cost. The request email for site visit shall be sent well in advance (preferably three working days before) for preparation of visitor pass, fixing suitable & mutually agreed date & time for site visit. The email ID for site visit is mentioned in tender documents.
5Contractor is fully responsible for making payment of Minimum wages & Bonus to labourers, EPF & ESI to statutory Authorities timely and submission of challans and documentary proof to EIC for release of payment of Running Account / Final Bill. Otherwise, bill will not be forwarded by EIC to Accounts for payment. EIC should ensure that all necessary documents are submitted by Agency for release of payment. No Running Account / Final Bill shall be paid for the work till the applicable labour license, registration and challans with EPFO, ESIC and BOCW (Building and Other Construction Workers) Welfare Board, whatever applicable, are submitted by the Contractor to the Engineer-in-Charge.)
6Contractor shall take a Contractor’s All Risk (CAR) Insurance Policy in respect of entire scope of work and a Janata insurance policy to cover the compensation claims arising out of Workmen's Compensation Act-1923. The Insurance policy shall be taken for entire period of contract and copy of the same shall be submitted to the Engineer-in-Charge before commencement of the work. The insurance policy shall be taken before commencement of the work and shall be renewed during the construction period till actual completion of work. The charges for issue & renewal of insurance policy shall be borne by Contractor. In event of failure of the Contractor to obtain Insurance Policy, Running Account Payments of the Contractor shall not be released till such time the same is obtained by the Contractor & submitted to the Engineer-in-Charge. In case, Insurance Policy has validity period not matching with contract period (either due to policy start date later than actual date of start of work or policy end date earlier than actual date of completion), then penalty for gap in period shall be levied at one and half times the rate of Insurance Policy premium including GST, to be computed on per day basis. All the workers engaged on the work shall required to be insured as per Government norms at the cost of contractor.
7The Contractor shall submit with every Running Account / Final Bill, a certificate of employment/deployment of the Technical representative(s) as per Clause 36 (i) in Schedule 'F' of \\" Salient Governing Features of the Tender\\", after certifying by Engineer-in-Charge. In the event of not fulfilling the above provisions of Clause 36(i), recovery shall be made from the contractor as per Schedule 'F'.
8Arrangement of Electricity : as per Schedule -BElectricity for construction work will be supplied by department @ free of cost.
9Arrangement of Water : as per Schedule -BWater will be supplied by department and water charges will be recovered @1% of gross value of work done.
10The drawings issued for Tender purpose are preliminary and indicative only. The Working drawings as applicable shall be issued in phased manner at the time of execution. Nothing extra shall be entertained towards revision in drawings. Drawing shall not be taken outside campus/site/premises without Gate Pass issued by EIC.
11All the items of sub-structure include the cost of dewatering and shoring, wherever necessary, during the progress of work, till its completion without any extra cost to the Department.
12The Schedule of Quantities include contingent works for other services (PHE, Electrical, Mechanical etc.) which shall be paid under relevant Civil items. Accordingly, the Contractor shall carry out all related works such as making cut outs, nitches, pipe sleeves, foundation pockets for embedded plate, bolts, parts etc. in concrete/ brick works as and when required by Engineer-in-charge without any extra cost to the Department.
13PPC/ Blended cement of recommended brand shall only be used for all masonry and finishing works unless noted otherwise. Only Fully treated dry, well graded sand conforming to IS 383 shall be used.
14Only Ready Mix Mortar of approved make shall be used. The ready mix mortar shall be manufactured by preferred manufacturers, using cement-sand in required proportion.
15The size and thickness of natural stones/ tiles mentioned for flooring dado, skirting etc. are approximate and subject to the availability in market during execution. If the required size and thickness is not available, the next higher size and thickness of tiles/ stones shall be used without any extra cost to the Department. The contractor may quote the rates accordingly.
16Quoted rate shall hold good for plain/ curved/ any other geometric shapes & sizes of all structural/ RCC members including formworks, masonry, flooring, doors & windows, plastering, painting etc. at all leads, levels, lifts and floors including scaffolding, bracing, multilevel staging etc., unless noted otherwise. Nothing extra shall be entertained towards wastages of materials, additional labours/ tools & plants etc. to achieve the required shapes & sizes etc.
17The Contractor shall follow the DAE safety rules strictly. All safety & security regulations shall be followed strictly as per specifications & conditions of contract.
18The following Security regulations shall be followed strictly while movement of labourers/ workers/ contractor's personnel including transportation of the materials etc. i) The Workers, Engineers and Supervisors will be provided vigil passes (for entry into Premises) on submission of application forms in prescribed formats supported by documentary proof like Aadhar card, Voter ID card and Ration Card / Driving Licence / PAN card etc. Police Verification Certificate (PVC) is mandatory for Engineers and Supervisors (wherever desired by department). You are requested to obtain immediately Police Verification Certificate (PVC) of your regular staff deployed at site(s) in respect of works and submit the same along with necessary application to allow them to enter in premises to carry out the assigned work. ii) The Contractor shall obtain special permission for working on extended hours of working days including Saturday, Sunday and holidays etc. iii) Workers shall be escorted from the main gate of campus/premises upto the site by designated supervisors of the contractor and they are not allowed to roam around inside the premises. iv) Transport vehicles of the contractor are allowed to enter the premises for transportation of construction materials. Drivers must have valid driving license of Heavy Vehicle. v) The following Security regulations shall also be followed strictly while movement of labourers/ workers/ contractor's personnel etc. (a) The Contractor shall issue I-Cards to his workers deployed on regular basis. (b) The Supervisor of the contractor having photo pass can bring daily wage workers/ casual workers inside campus for work. He should prepare list of such workers in duplicate. The original copy shall be handed over to the representative of the Engineer-In-Charge at the gate and endorsement obtained on duplicate copy on daily basis. (c) The Contractor's personnel including daily wage workers shall be in uniform with proper identification for ease in identification of such persons at unauthorised places. (d) The daily wage workers/ casual workers employed by the contractor must wear florescence vis-a-vis wear without fail during their presence inside Campus/premises. The contractor shall provide a sleeveless Jacket to the workers in pattern, colour showing name of contractor with address and telephone number as approved by the Engineer-in-charge. All the workers must wear the same while on duty. (e) The Contractor's personnel shall follow all safety rules & security procedure that are in vogue and applicable during execution of work. Contractor shall verify the character and antecedents of the labourers employed, through local address proof issued by competent authorities such as Aadhar card, Voter ID card and ration card / driving license /electricity bills /telephone bill /gas connection document etc. The nationality of contract labourers also needs due verification.
19Vehicular movement shall abide by the regulations imposed by the concerned authorities. The contractor shall abide by the security rules & regulations of the Department. The approach roads should be kept clean & free from obstruction for smooth functioning of existing traffic and damages caused, if any, to be made good without any extra cost to the department. Contractor may make provision for entry of vehicles by providing alternate road/ route for entry & exit during the construction work, if required, at his own cost without extra cost to the department.
20While transporting materials from site and disposal of surplus materials, the spilled over materials/ earth/ debris etc. on the road should be got cleaned by the contractor after the day's work is over.
21Royalty for excavation, transportation, filling of earthwork etc. including obtaining permission from Statutory authority, if any, shall be borne by the contractor.
22Regarding disposal of Construction waste from site of work, the agency has to abide by the guidelines of Construction and Demolition (C&D) waste management plan as approved by BMC/Local Municipal Authority and any other regulations issued by Statutory authorities in the matter from time to time and Department is not responsible in any way in this regard. i) Contractor shall strictly follow the Statutory rules and regulations of the Construction and Demolition Debris Management Plan for project site. ii) Surplus Excavated materials and construction debris shall be disposed from construction site at approved disposal ground of BMC/Local Municipal Authority including cost of necessary Statutory charges, as applicable. iii) Contractor shall submit acknowledgement of challan for each trip for unloading of Construction and Demolition waste material as per the standard format. iv) Contractor shall be responsible and liable for penalty, if any, as prescribed by the Local Authority in case of non-fulfilment of the procedure laid down in the Construction and Demolition Debris Management Plan. v) Contractor shall submit irrevocable Bank Guarantee for the amount as insisted by BMC/Local Municipal Authority for the purpose of ensuing compliance of the Waste Management Plan/Debris Management Plan approved by the Local Municipal Corporation from time to time, till the grant /issuance of the Occupation Certificate and charges for same will be borne by Contractor. NOC from C&D Waste Management Department of BMC/Local Municipal Authority shall be submitted by the agency.
23Agency should pay necessary charges to BMC/Local Municipal Authority to get done periodical pest control / anti-larva treatment / Insecticide treatment at Construction site. After the completion of work, necessary NOC shall be obtained from BMC /Local Municipal Authority and shall be submitted to Department. The charges for same will be borne by Contractor.
24The Agency shall take care of existing services and other department properties while carrying out job. All dismantling, demolishing and excavation work shall be done with most careful manner and with prior written approval of the Engineer-in-charge, without damaging the existing structures, services, finishes, etc. Agency shall take all precautions to cover all furniture, fixtures, glass and window panes to prevent damage. Damage, if any shall be repaired/replaced by agency at his own cost.
25Protection of work: The Contractor shall be responsible for the protection of the work during progress. He shall also provide and maintain any other temporary substitute and material for this purpose. He shall take all the necessary precautions to prevent damage to all the works till its handing over.
26Wherever old material/works are replaced with new one, quoted rate includes removing/dismantling the existing one and depositing the serviceable material at departmental store and disposing off debris outside the campus/ premises/ colony.
27Since the work has to be carried out inside/ near occupied residential/office building, the work shall be executed with least disturbance to occupants of buildings.
28Approved Samples of Materials: The Contractor shall submit samples of all materials to be incorporated in the work, without any extra cost to Department, at least 30 days before he places bulk order for the materials and shall obtain approval of samples in writing from the Engineer-In-charge.
29Shop drawings for Aluminium work, Structural steel, Stainless steel, Structural glazing, ACP cladding, etc. shall be submitted by Contractor for the approval of Engineer-in-Charge, at least 30 days in advance prior to taking of work.
30No labour shall be permitted to stay inside campus/premises/site.
31Suitable area near site of work shall be allocated to the contractor for storing construction materials, for site office etc. Optimum care shall be taken by the contractor to avoid disturbing the traffic and road around the building etc. The contractor shall have to maintain proper co-ordination with the fellow agencies working simultaneously in the vicinity of subject work in order to avoid delays in any of the works going on in and around the premises.
32Guidelines for Air Pollution mitigation(i) The charges for the Air Pollution mitigation measures shall be borne by the contractor without any extra cost to the department.(ii) Contractor shall follow the directions for Dust and Pollution Control measures in construction as notified by MoEF&CC / MoHUA / CPWD / BMC or any other statutory authority.(iii) All precautionary measures for control of Air Pollution due to Building Construction Activity shall be taken as per Local Statutory/ Municipal Authority Air Pollution Mitigation Plan. (iv) Mandatory Form for Building Construction activity to control Air Pollution along with supporting documents and site photographs shall be submitted to concerened authority or uploaded on online portal.(v) Projects attracting Environmental Clearance shall carry out Third Party Ambient Air Monitoring every fortnightly from NABL / MoEF&CC laboratory. (vi) Construction projects shall mandatorily install sensor-based air quality monitor for measuring PM concentration (PM2.5 and PM10), relative humidity, temperature and display real time AQI data through LED display board (width 1220mm x height 915mm, screen resolution 320 x 192 pixel) at the construction site. Further, installation must be completed within 15 days of issue of Work order or commencement of work. The Contractor shall submit a certificate for completion of installation of air quality monitor and LED display board, after certifying by Engineer-In-charge, along with 1st RA bill for releasing the payment.(vii) The air quality data must be accessible at the site and made available for inspection by Local Municipal Authority/ Competent Authority.(viii) Construction layouts having area more than 01 (one) acre or Height more than 70m, shall have continuous dust or wind breaking tin / metal sheet erected of minimum height 35 feet around periphery of the construction project site and for construction site, less than 01 (one) acre, the tin / metal sheet height shall be 25 feet minimum.(ix) Tarpaulin / Green cloth / Jute sheet to be mandatorily used to cover the floor where any construction activity is in progress and two floors below it and also on scaffolding covering an entire area under demolition structure. Further, regular cleaning of Tarpaulin / Jute sheet to be undertaken. (x) Water sprinkling shall be continuously carried out so that the debris shall remain in wet condition.(xii) All vehicles carrying construction materials/waste/debris shall have valid PUC certificates and the same shall be produced as when asked for by competent authorities.(xiii) Construction workers should mandatorily use PPE (Personal Protective Equipment) i.e. Mask, Goggles etc.
33The quoted rate shall be inclusive of providing and erecting temporary barricading of height as per above 'Guidelines for Air Pollution mitigation' (but minimum 10 feet height) using structural steel (MS Pipes or angle iron frame work etc.), covered with tin / GI sheets of approved colour & shade, Struts, MS Clamps, Bracing etc. and shall have wicket gate & material gate and including writing and painting of direction & instructions, providing glow lamps, reflective signs, marking, flags, caution tape etc. Prior written approval of Engineer-in-Charge of the sketch/ drawing showing details of barricading shall be obtained by the contractor. The barricading shall be provided and retained in position at site continuously during the execution of the entire work till its completion. Rate include its maintenance for damages, painting, all incidentals, labour, materials, equipments and works required to execute the job such as earth work, concrete, welding etc. After completion of work, Contractor shall remove and take away the barricading at his own cost with the prior approval of Engineer-In-Charge. The entire work shall be executed as per direction of Engineer-In-Charge. No work shall be allowed unless the barricading is completed to the satisfaction of the Engineer-in-Charge. The Contractor shall submit a certificate for completion of barricading along with 1st RA bill after certifying by Engineer-in-Charge for releasing the payment.
34The contractor shall display proper information/cautionary signage boards at site for the safety of the workers and public in general in the surrounding areas.
35Contractor has to provide sign board at site with detailed name of project, name of client, name with contact number of contractor and minimum wages category wise at entrance of project/site without any extra cost to the department.
36Guidelines for Scaffolding works - Quoted rates shall include all scaffolding works without any extra cost to the department.(i) Design of scaffolding for carrying out work shall be as per relevant IS Codes & specification. The contractor has to observe all safety procedure while working on heights as per IS: 3696 (Part-I) (Safety Code for Scaffolds). (ii) All working platform must be of minimum 600 mm wide, made of M.S pipe and must have guard rails as per specification. Further, Overhead protection should be provided on the scaffolds to protect workers on lower platform against falling objects from higher level.(iii) Necessary ladder shall be provided at required locations to enable Departmental Staff for supervision of works.(iv) Labours working on the scaffolding should be with safety belts, helmets, goggles and other safety gears.(v) Horizontal Safety Net : Nylon net with a mesh size of 25mm shall be provided at 4.0 meter height from the ground level around the buildings upto a distance of minimum 3.0 meter from the edge of the building on all sides to catch any falling objects.(vi) Vertical Safety Net: Green cloth net shall be provided to the full height of scaffolding / building and securely tied to protect falling material coming out during the progress of work.
37Maintaining L1 position During execution of the contract, if tender structure changes due to variation in quantities (i.e Work order quantities, Substituted items quantities including quantities within deviation limit specified in Clause 12 of Schedule ‘F’ in “Salient Governing Features of the Tender”), Contractor has to give suitable discount to remain in L1 position.
38The quoted rates shall be inclusive of wastage of labour & material, installation, testing, commissioning, transportation, loading, unloading, lifting etc. and also includes provision of all necessary manpower, tools, machinery, equipment, hoists etc. for carrying out the work in effective manner as per specifications and as directed by Engineer-In-Charge.
39The quoted rates shall be inclusive of all Taxes, GST, Cess, Levy, duty etc.
40Refer Prebid clarifications, minutes of meeting & corrigendum for revisions, if any, for updates.
41All tools & plant required for the work shall be supplied by the contractor as per site requirement
42No debris shall be left over during the repair works under each item on any day. An area for 'Debris bins' will be identified on the request of contractor for collection of debris generated on day to day basis. The Debris from debris bin shall be cleared every month. The contractor must maintain adequate number of wheel borrows all the time for shifting the debris to Debris bin. If the debris lies around the building for more than 7 days, penalty @ Rs. 100/- per day shall be levied.
43The agency has to abide by the \\"Construction & Demolition\\" work management plan as approved by MCGM & any other regulations issued by the statutory authorities in the matter from time to time & agency has to deposit Bank Gurantee/ deposit as required.
44ABSTRACT SHEET
45PART I : CIVIL WORKS
46PART I : CIVIL WORKS
47Dismantling / demolishing work by manual /Chiselling/ mechnical means, carefully without damaging & disturbing adjacent structures, at all levels, locations & floors including labour, machine, loading, unloading, transportation, stacking of serviceable material at directed place & disposal of debris & unserviceable material as per direction, scaffolding etc complete all as per specifications and as directed by Engineer-in-Charge.
48a) Brick/ Stone masonary /PCC/ RCC / waterproofing work.
49Providing and fixing stainless steel Anchor fastner as specified below of Hilti make ( HILTI HAS-U-5.8 M12 X 160 Length or its approved equivalent including drilling holes 14 mm dia to required depth upto 105 mm, cleaning the same and grouting he holes with HILTI HIT HY 200 R V3 or equivalan approved chemical, fixing the fastner in proper position at alll levels including spreading 25 mm thick finished grout layer over RCC surface etc. completed all as per drawings, specifications and as per direction of the Engineer-In-Charge.
50Anchoring 12 mm dia anchher fastner-Hilti HAS-U-5.8 M12 X 160 Length
51Providing & fixing Carbon steel, zinc-plated ,externally threaded as specified below of Hilti make Stud anchor HST4 M12x165 MM or its equivalent including drilling holes to required depth, cleaning the same and fixing of fastner in proper position at all levels etc. complete all as per drawing/ sketch, specifications and as per direction of the Engineer- in- Charge.
5212 mm dia mechanical Stud anchor HST4 M12x165 MM
53Providing, erecting, fixing in position, striking / removing and cleaning steel / timber shuttering & centering for form work including single / multiple staging at all floors, level & locations for all geometrical shapes in plain, curved surfaces of structural / R C C elements and including rails, bracings, props, brackets, cutting holes for pipes etc., providing & applying approved form oil on all surfaces of form work coming in contact with concrete including close hacking of all exposed concrete work after removal of form work, all materials, labour etc. complete as per specifications, drawings & as directed by the Engineer-in-Charge. (Area of form work in contact with concrete shall only be measured for payment & stop boards for construction joints etc. will not be measured for payment).
54For all type of structural / RCC elements including all geometrical shapes and single / multiple staging at all floors and location a) Above Plinth Level (In Super Structure)
55Providing and laying in position, at all levels & loactions, for structural members of all geometrical shape & design as per drawing, Reinforced Cement Concrete (RCC) of grade as specified below, conforming to latest revisions of IS:456-2000 and IS:13920, using 20 mm maximum size aggregates and approved quality sand including admixtures of approved brand and quality (plasticisers / super plasticisers), weigh batching, mechanical mixing, transporting, placing, vibrating, consolidation, finishing, curing etc.complete all as per specifications & as directed by EIC.
56Cement concrete of 1:1.5:3 at all levels (1 cement, 1.5 crushed sand, 3 graded stone aggregate of nominal size 20 mm)
57Providing water proof plastering work of thickness as mentioned below, in using cement sand mortar (1:4) or using ready mix cement mortar having cement : sand (1:4) at all floors, levels & locations, in single coat finished smooth with a floating coat of neat cement including approved water proofing compound added @ 2% by weight of cement or as per manufacturer's specifications in correct line, level, plane, plumb and including scaffolding, curing etc complete all as per specifications and as directed by EIC. (inside trench/nalla/pit / storm water drains etc.)
58Using ready mix cement mortar having Cement : Sand (1:4)20 mm thick
59Repairs to damaged RCC structural members at all locations/ floors using polymer modified cementatious mortar, for strengthening the existing RCC structural members using acrylic based polymer confirming to thefollowing technical specifications and comprising the following operations: Polymer required for the work shall be procured by the Agency from approved Manufacturers Like M/s Astra , M/s Anuvi, M/s Apcotex or otherapproved equivalent manufacturer confirming to technical requirements as mentioned below.Appearance: Milky whitePh- value : 9-10Specific gravity : 1.055+/-0.005Solid contents(%w/w)-: 44+/-1Viscocity at 25 degree C temperature (in sec): 15-20Testing of the material as per relevant codes at NABL approved third partyLab. is to be done by the Agency for every batch/lot of supply.Bond coat should be applied @ 0.37 ltr./layer/sqmMinimum FM of silica sand should be 2.10
60Building up with polymer modified cementatious mortar for RCC structural members etc. in layers not exceeding 20 mm in a day (proportion – cement 50 Kg. : Silica sand 125 Kg. : polymer liquid 10 ltrs.) with necessary bond coat (polymer : Cement = 1:1 by volume) for tack coat and also for subsequent layers using polymer including curing, covering the flooring /window with tarpaulins or equivalent covering material to avoid deposition of polymer mortar and cleaning of floor / windows thoroughly on completion of repair work etc. complete all as per specifications and as directed by the Engineer-in-charge. Polymer used for this work in KG shall be measured for payment
61Sand faced plastering work using cement sand mortar (1:4) or using ready mix cement mortar having cement : sand (1:4) and finished thickness as specified below at all floors, levels & locations, in single/ double coat (as specified) over concrete/ masonry surface including surfaces preparation in correct line, level, plane, plumb and including scaffolding, curing etc complete all as per specifications and as directed by EIC.
6220 mm thick in two coats for brick/ concrete surfaces (external / internal) (back coat and finishing coat of 10 mm. thick each) with water proofing agent @ 2% by weight of cement or as per manufacturers specifications. (Using ready mix cement mortar having Cement : Sand (1:4)
63Cement plastering work using cement sand mortar and finished thickness as specified below without neat cement punning, at all floors, levels & locations, in single/ double coat (as specified) over concrete/ masonry surface including surfaces preparation, even & smooth surface in correct line, level, plane, plumb and including scaffolding, curing etc complete all as per specifications and as directed by EIC.
64Using ready mix cement mortar having Cement : Sand (1:4)15 mm thick
65Providing and fixing 0.5 mm (minimum) thickness GI CRCA sheet pre coated with high durable polyetser painted, at all floors, levels & locations, manufactured by approved manufactuter, the base metal shall be CRCA steel as per IS:513, having minimum yield strength of 240 MPa and minimum UTS of 280 MPa galvanized to 120 gsm zinc coating mass (total both sides) as per IS : 277, conforming to AS:35366 class 3 of Rustshield/ Corroshield, having approved colour, shade and profile, fixing the sheet using SS self tapping screws of minimum 4 mm thick and suitable length @ 400 mm C/C (both ways as per availability of member) with drill machine including heavy quality bituminious / EPDM / neoprene washer, over structural steel members frame work over terrace including providing & fixing necessary ridges, gabels, valleys, gutters sections and including wastage, overlapps as per manufacturer's specifications, cutting, labour, scaffolding, machines, lifting, fixing etc complete all as per specifications, drawings and as directed by EIC. The total thickness of sheet, inclusive of all chemical treatment, primer and finished coats shall not be less than 0.50 mm. Mode of measurement: Actual area of roof coverings including ridges, eaves, gutter etc. after fixing shall be measured for payment. Corrugation, overlaps shall not be measured for payment.
66Structural steel work at all floors, levels and locations in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc. for cladding work, grills, guard bars for windows, frames, Fence, pit/ trench covers, cover bracket for slanting chajja, trap door, railing, balcony hand railing, hoisting hooks, smoke vents etc. using angles, channels, I-Section, tees, flats, bars, chequered plates, plain plates, hollow section, bright bars etc. of required sizes including supplying, cutting, fabricating, welding, erecting, making holes/ chases wherever required and fixing / embedding in position in concrete/ brickwork/blockwork/ marble/ granite stone with necessary hold fasts/ stainless steel screws & rawl plugs by drilling etc. and finishing the concrete/ brick work/ blockwork after fixing/ embedding including painting two coats of anti corrosive bitumastic paint on all unexposed surfaces and two coats of synthetic enamel paint of approved make and colour on all exposed surfaces over a coat of approved zinc chromate primer etc. complete as per specifications, drawings and as directed by the Engineer in charge.Note:- All structural steel work shall be as per latest version IS:800 & IS:806. All Rectangular and Square Hollow Sections (RHS & SHS) shall be conforming to latest version of IS:4923. All rolled sections shall be of Grade E-250 and conforming to latest verison of IS:2062. Welding shall be as per IS:816 & IS:6227.
67Using structural steel sections of specified grade (YSt 240 / 310)
68Supplying, fixing & erecting M.S. Double steel tubular scaffolding using 'H' frames with cup lock type with horizontal and vertical rows @ suitable spacing as per I.S. specification, scaffolding made with 40 mm dia heavy class MS seamless pipe, suitably overlapped at junctions and cross braced wherever required securely tied, supporting the scaffolding with building members, including dismantling & taking back the scaffolding, providing necessary safety belt, helmet & safety equipments to labours for works and including providing & fixing necessary required MS tube challies, MS clamps, MS staircsae system in scaffolding, working platform etc etc complete all as per specifications and as directed by the Engineer-in-Charge. Note:-1. Suitable double nylon net with a mesh size of 25mm shall be provided at 4 M. height from the ground level around the buildings upto adistance of minimum 3 M. from the edge of the building in all sides to catch any falling objects causing accidents.2. Screen of suitable material shall be provided to the full height of scaffolding and securely tied to protect falling bodies coming out during the work is in progress.3. Contractor has to provide nylon mesh and screen to avoid falling bodies at his own cost and no extra payment shall be made for same.4. The scaffolding system shall be stiffened with bracings, runners, connection with building etc. Making arrangments for inspection of work at required location with essential safety features.5. The elevational area of the scaffolding shall be measured for payment purposes. The payment shall be made once irrespective of duration of scaffolding.6. The scaffolding shall be using good quality and sturdy 'H' frames with horizontal and vertical MS pipes of minimum 40 mm nb @ suitable spacing as per latest relevant I.S. specification which should be suitably overlapped at junctions and cross braced wherever required and securely tied, supporting/anchoring the scaffolding with building members as permitted, at every alteranate floor level along the height of the building, tieing the free ends of frames at terrace level, providing bearing plates and making foundation blocks at the bottom of each legs of H frames for proper bearing and support.
69Pressure grouting through RCC columns, beams and slabs of G+3 upper floor building from terrace and external wall face including double bamboo scaffolding wherever required etc by drilling holes in RCC to required depth upto 165 mm depth without causing any damages to reinforcement, inserting 12mm' dia PVC grout pipe in hole securing the sides of the hole with cement mortar 1:2, pressure grouting with a mix of Acrylic Polymer Cement Grout with 10% of Polymer per 50 kg cement bag and continuing the pressure grouting till the flow of Polymer cement slurry stops, removing the PVC pipe, sealing the hole with Polymer modified mortar etc. ensure curing by applying curing compound etc. Complete all as per specification and directed by EIC. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56403650
AUTHORITY Government Departments
TENDER VALUE 5.28 Crore
LAST DATE 05-08-2026
Authority
Authority Name Directorate Of Construction, Services And Estate Management
Work Description Tender for Terrace Covering With Crca Sheet Of Atomic Energy School No.1,3,6 And Atomic Energy Junior College (Aejc) Buildings, At Anushaktinagar, Mumbai
Basic Detail
Tender No DCSEM/CQD/QSB/AES AEJC/26-27/NIT/28 dt.10.07.2026
Bidding Type Tender
Location
City Mumbai Suburban
State Maharashtra
Key Dates
Publish Date 10 Jul 2026
Submission Date 05 Aug 2026
Open Date 07 Aug 2026
Finance
Tender Value 5.28 Crore
Tender Fee Ref. Documents
EMD 10.57 Lakhs
Exemption Not Available
Document List
48bd18b7-86e7-4018-99e4-7113303e6606.html
Annexurs.pdf
BOQ_963520.xls
Technical_Bid_NIT_28.pdf
Technical_data_sheet.xls
Tendernotice_1 (5).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 10, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 05, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 13 days
Aug 07, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 15 days

Tender Documents

Download All (ZIP) ↓
html

48bd18b7-86e7-4018-99e4-7113303e6606.html

pdf

Annexurs.pdf

xls

BOQ_963520.xls

pdf

Technical_Bid_NIT_28.pdf

xls

Technical_data_sheet.xls

pdf

Tendernotice_1 (5).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders