Bids Are invited for Annual Maintenance Service-Air Conditioner - Split Ac : Bi-Monthly Servicing (Eight Bi-Monthly Services In A Contract Period Of Two Years That Is In A 24 Months). As Per Scope Of Work Part-D Section Ii Point No. 1.0 (Services 8 X
Tender Overview
Project Description
Bids Are invited for Annual Maintenance Service-Air Conditioner - Split Ac : Bi-Monthly Servicing (Eight Bi-Monthly Services In A Contract Period Of Two Years That Is In A 24 Months). As Per Scope Of Work Part-D Section Ii Point No. 1.0 (Services 8 X 152 Quantity) , Split Ac: Brought Down Servicing Of Split Type Room Air Conditioner Once In A Year That Is Two Times In A Two Year. As Per Scope Of Work Part-D Section Ii Point No. 2.0 (Services 2 X 152 Quantity) , Vertical Ac: Bi-Monthly Servicing (Eight Bi-Monthly Services In A Contract Period Of Two Years That Is In A 24 Months). As Per Scope Of Work Part-D Section Ii Point No. 2.0 ( Services 8 X 12 Quantity) , Vertical Ac: Brought Down Servicing Once In A Year That Is Two Times In A Two Year.As Per Scope Of Work Part-D Section Ii Point No. 2.0 (Services 2 X 12 Quantity) , Replacement Defective Ac Compressor With Approved Make (For Inverter/Non-Inverter Ac), Including Installation, Gas Charging, And Testing—Complete. , Copper Tubing For Split Ac: Supply And Instllation Of Good Quality Copper Tubing Of Minimum 24 Gauge(As Per Site Requirment) Thick Along With Sleeve Type Insulation Wrapped With Monsoon Tape For Split A/Cs Of Capacity Upto 2 Tr As Per Part- E Technical Specification Clause 1. Each Running Meter Copper Tube Will Consist Of One Meter Each Of Suction And Discharge Line Together. , Electrical Cable For Split Ac, As Per Part-E Technical Specification Clause 2 , Condensate Drain Pipe For Split Ac As Per Part-E Clause 3 , Pvc Trunking For Split Ac As Per Part-E Technical Specification Clause 4 (Size 50Mmx100mm And As Per Requirement) , Ready Made Heavy Duty Ms Stand/ Structure For Split & Vertical Ac, As Per Part-E Technical Specification Clause 5 , Core Cutting And Necessary Civil Work To Be Done, If Required, For Pipe Passage During New Ac Installation.As Per Part-E Technical Specification Clause 6 , Shifting And Installation Of The Air Conditioner To New Locations Within Various Departmental Buildings. Point No. 8 Of The Scope Of Work
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Split AC : Bi-Monthly servicing (Eight Bi-monthly Services in a contract period of Two Years that is in a 24 months). As per Scope of work PART-D Section II Point No. 1.0 (Services 8 X 152 Quantity) | Split AC : Bi-Monthly servicing (Eight Bi-monthly Services in a contract period of Two Years that is in a 24 months). As per Scope of work PART-D Section II Point No. 1.0 (Services 8 X 152 Quantity) |
| 2 | Split AC: Brought down servicing of split type room air conditioner once in a year that is two times in a two year. As per Scope of work PART-D Section II Point No. 2.0 (Services 2 X 152 Quantity) | Split AC: Brought down servicing of split type room air conditioner once in a year that is two times in a two year. As per Scope of work PART-D Section II Point No. 2.0 (Services 2 X 152 Quantity) |
| 3 | Vertical AC: Bi-Monthly servicing (Eight Bi-monthly Services in a contract period of Two Years that is in a 24 months). As per Scope of work PART-D Section II Point No. 2.0 ( Services 8 X 12 Quantity) | Vertical AC: Bi-Monthly servicing (Eight Bi-monthly Services in a contract period of Two Years that is in a 24 months). As per Scope of work PART-D Section II Point No. 2.0 ( Services 8 X 12 Quantity) |
| 4 | Vertical AC: Brought down servicing once in a year that is two times in a two year.As per Scope of work PART-D Section II Point No. 2.0 (Services 2 X 12 Quantity) | Vertical AC: Brought down servicing once in a year that is two times in a two year.As per Scope of work PART-D Section II Point No. 2.0 (Services 2 X 12 Quantity) |
| 5 | Replacement defective AC compressor with approved make (for inverter/non-inverter AC), including installation, gas charging, and testing—complete. | Replacement defective AC compressor with approved make (for inverter/non-inverter AC), including installation, gas charging, and testing—complete. |
| 6 | Copper tubing for split AC: Supply and instllation of good quality copper tubing of minimum 24 gauge(as per site requirment) thick along with sleeve type insulation wrapped with monsoon tape for split A/Cs of capacity upto 2 TR As per PART- E Technical specification CLAUSE 1. each running meter copper tube will consist of one meter each of suction and discharge line together. | Copper tubing for split AC: Supply and instllation of good quality copper tubing of minimum 24 gauge(as per site requirment) thick along with sleeve type insulation wrapped with monsoon tape for split A/Cs of capacity upto 2 TR As per PART- E Technical specification CLAUSE 1. each running meter copper tube will consist of one meter each of suction and discharge line together. |
| 7 | Electrical Cable For Split AC, as per PART-E Technical specification CLAUSE 2 | Electrical Cable For Split AC, as per PART-E Technical specification CLAUSE 2 |
| 8 | Condensate Drain Pipe For split AC as per PART-E CLAUSE 3 | Condensate Drain Pipe For split AC as per PART-E CLAUSE 3 |
| 9 | PVC Trunking For Split AC as per PART-E Technical specification CLAUSE 4 (Size 50mmX100mm and as per requirement) | PVC Trunking For Split AC as per PART-E Technical specification CLAUSE 4 (Size 50mmX100mm and as per requirement) |
| 10 | Ready Made Heavy duty MS Stand/ structure for Split & Vertical AC, as per PART-E Technical specification CLAUSE 5 | Ready Made Heavy duty MS Stand/ structure for Split & Vertical AC, as per PART-E Technical specification CLAUSE 5 |
| 11 | Core cutting and necessary Civil work to be done, if required, for pipe passage during new AC installation.As per PART-E Technical specification CLAUSE 6 | Core cutting and necessary Civil work to be done, if required, for pipe passage during new AC installation.As per PART-E Technical specification CLAUSE 6 |
| 12 | Shifting and installation of the air conditioner to new locations within various departmental buildings. Point No. 8 of the Scope of Work | Shifting and installation of the air conditioner to new locations within various departmental buildings. Point No. 8 of the Scope of Work |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender