Tender For Kothali 7 Villages Rural Water Supply Scheme Tq. Motala Running Maintaining The Scheme
Tender Overview
Project Description
Tender For Kothali 7 Villages Rural Water Supply Scheme Tq. Motala Running Maintaining The Scheme- 1 Establishment For Maintaining The Scheme 2 Commissioning Of Kothali & 7 Vill. R.R.W.S. Cheme For Twelve Months Including Providing & Employing Staff Including Pump Operators,Filter Operators,Site Supervisor,Valvemen For Distribution Of Water To Esr Covered Under The Scheme Including The Maintenance Of Jackwell,Wtp,Sump,Filters,Overhead Tank,R/W Rising Main Excluding Rectification Of Leakages Etc.(Rate As Per Annexure -1) As Directed By Engeineer In Charge By Engaging Required Minimum Staff As Suggested In Annexture B With Activities To Be Done As Various Components Of Whole Scheme Etc., Complete. As Per Annexure B Cost Of Job Work For 12 Months Rs.3230250/- Hence .3230250/12 Months=269188/-Per Month 3 Rectification Of Leakages In Pipelines Of Various Dia. & Type,Repairing Of Pumping Machinary,Servicing Panel Board Including Replacing M.C.B.,Cables,Lugs,Cutouts With Electrician Charges,Repairing Sluice Valves Included Under The Scheme.(As Per Detailed In Subwork No.2) Rs.523088 Hence 523088/12=43591 Per Month 4 Providing & Suppling Bleaching Powder Grade-1 Isi Mark Etc.Complete.As Per Chemical Demand,2619 Kg/12=218.25 Kg/Month 5 Providing & Suppling Alum As Per Isi Specification Etc.Complete. As Per Chemical Demand, 7.482 Mt./12= 0.624 Mt./Month Please Enable Macros To View Boq Information
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 19-Jul-2026 | Date | Date | 22-Jul-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Establishment for Maintaining the scheme |
| 2 | Commissioning of Kothali & 7 Vill. R.R.W.S. cheme for twelve months including Providing & employing staff including pump operators,filter operators,site supervisor,valvemen for distribution of water to ESR covered under the scheme including the maintenance of jackwell,WTP,sump,filters,overhead tank,R/W rising main excluding rectification of leakages etc.(Rate as per Annexure -1) as directed by Engeineer in charge by engaging required minimum staff as suggested in Annexture B with activities to be done as various components of whole scheme etc., Complete. As Per Annexure B Cost of Job Work For 12 months Rs.3230250/- Hence .3230250/12 months=269188/-per month |
| 3 | Rectification of leakages in pipelines of various dia. & type,Repairing of Pumping machinary,Servicing Panel Board including replacing M.C.B.,Cables,Lugs,Cutouts with electrician charges,Repairing sluice Valves included under the scheme.(As per detailed in subwork no.2) Rs.523088 Hence 523088/12=43591 per month |
| 4 | Providing & suppling Bleaching Powder grade-1 ISI Mark Etc.complete.As per Chemical Demand,2619 kg/12=218.25 kg/month |
| 5 | Providing & suppling Alum As Per ISI specification Etc.complete. As per Chemical Demand, 7.482 MT./12= 0.624 MT./month Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 1 dayBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 1 dayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender