Tender For Re-Construction Of Vr Bridge At Rd 24400 Of Kulasi Link Drain.
Tender Value
9.72 Lakhs
Estimated cost
Bid Submission
18 Jul 2026
6 days left
EMD
19440
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Jhajjar → Haryana
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Re-Construction Of Vr Bridge At Rd 24400 Of Kulasi Link Drain.
BOQ
| Sl. No. | Item Description |
| 1 | credit of brick and brick bats |
| 2 | Credit of old steel |
| 3 | HSR Item [11.5.2]12 mm cement plaster of mix : 2. 1:3 (1 cement: 3 fine sand) |
| 4 | HSR Item [15.6.1]Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications MORTandH clause 1300 1. Cement Mortar 1:3 (1 cement : 3 sand) |
| 5 | HSR Item [2.HO001] HO001. Royalty for good earth |
| 6 | HSR Item [27.49]Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm and MORT&H specification 800. |
| 7 | HSR Item [27.51.3]Filler joint 3. Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement up to 20 mm, covered with sealant complete as per drawing and MoRT&H specifications. |
| 8 | HSR Item [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil |
| 9 | HSR Item [4.32]Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. |
| 10 | HSR Item [4.33]Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 1 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. |
| 11 | HSR Item [5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) |
| 12 | HSR Item [5.25]Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. |
| 13 | HSR Item [5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar |
| 14 | HSR Item [6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) |
| 15 | HSR Item [6.24.1]Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. 1. All works up to plinth level |
| 16 | HSR Item [6.30.1]Centering and shuttering including strutting, propping etc. and removal of form for 1. Foundations, footings, bases of columns, etc. for mass concrete |
| 17 | HSR Item [6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform |
| 18 | HSR Item [6.33.3]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted bars Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 10, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedJul 18, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysJul 20, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 8 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender