Home Affairs Statutory Bodies & Commissions/Committees Closing in 9 days TDR #56394101

Tender For Construction Of Boundary Wall With Concertina Coil At Top Of Wall At Madanpur And Kishangarh C For 50Th Bn Itbp C Us Of 50Th Bn Itbp Ramgarh Distt Panchkula (Haryana).

Issued by Statutory Bodies & Commissions/Committees · Panchkula, Haryana
Tender Value
5.52 Crore
Estimated cost
Bid Submission
30 Jul 2026
9 days left
EMD
11.05 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Panchkula → Haryana
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Construction Of Boundary Wall With Concertina Coil At Top Of Wall At Madanpur And Kishangarh C For 50Th Bn Itbp C Us Of 50Th Bn Itbp Ramgarh Distt Panchkula (Haryana).

BOQ

Name of Work:- Construction of Boundary wall with concertina Coil at Top of wall at Madanpur and Kishangarh c for 50th BN ITBP C us of 50th Bn ITBP ramgarh Distt Panchkula (Haryana).
Sl. No. Item Description
1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead upto 50 m and for all lift, as directed by Engineer-in- Charge. All kind of Soil
2Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil.
3Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift.
4Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
5Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
6Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
7Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
8Centering and shuttering including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete.
9Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers.
10Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts.
11Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Upto Plinth Level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
12Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above Plinth Level : Thermo-Mechanically Treated bars of grade Fe-500D or more.
13Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand)
14Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 infoundation & Plinth in : Cement mortar 1:6 (1 cement : 6 coarse sand)
15Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand)
1612 mm cement plaster of mix : 1:4 (1 cement: 4 Coarse sand)
176 mm cement plaster of mix : 1:3 (1 cement : 3 fine sand)
18Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm)
19Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : In cement mortar
20Credit of Useful Bricks
21Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used.With G.I. barbed wire
22Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete.
23Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture
24Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron ‘Y’ shaped placed 2.4m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape(R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately)
25Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of ± 2%) Zinc coated, Mesh wire diameter 3.0 mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2mm, supplied @ 3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per direction of Engineer-in-charge.
26Carrying out consultancy services including Digital survey of both the camps , Soil Invetigation, structural design, preparation of drawings and vetting of design from IIT or NIT as per direction of Engr-in-Charge. Also submit minmum 05 sets of approved Design and Drawings of the work at Intial stage and three sets of all design , drawings and other papers after completion of work. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56394101
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE 5.52 Crore
LAST DATE 30-07-2026
Authority
Authority Name Indo Tibetan Border Police Force
Work Description Tender for Construction Of Boundary Wall With Concertina Coil At Top Of Wall At Madanpur And Kishangarh C For 50Th Bn Itbp C Us Of 50Th Bn Itbp Ramgarh Distt Panchkula (Haryana).
Basic Detail
Tender No ITBP/SHQ SML/ENGR / 50th Bn/B Wall Tender /228/2026-27- 4582-4611 Dtd 08-07-26
Bidding Type Tender
Location
City Panchkula
State Haryana
Key Dates
Publish Date 10 Jul 2026
Submission Date 30 Jul 2026
Open Date 31 Jul 2026
Finance
Tender Value 5.52 Crore
Tender Fee Ref. Documents
EMD 11.05 Lakhs
Exemption Not Available
Document List
a831dd43-16d6-4ccc-9084-252d4ed89c98.html
BOQ_963277.xls
Tendernotice_1.pdf
Tendernotice_2 (1).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 10, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 30, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 9 days
Jul 31, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 10 days

Tender Documents

Download All (ZIP) ↓
html

a831dd43-16d6-4ccc-9084-252d4ed89c98.html

xls

BOQ_963277.xls

pdf

Tendernotice_1.pdf

pdf

Tendernotice_2 (1).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders