Tender For Repair/Maintenance Of Central Type Ac Plants And Package Type Ac Plant At Nad Area Under Ge Gomantak
Tender Value
40 Lakhs
Estimated cost
Bid Submission
30 Jul 2026
20 days left
EMD
80000
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
goa → Goa
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Repair/Maintenance Of Central Type Ac Plants And Package Type Ac Plant At Nad Area Under Ge Gomantak
BOQ
| Sl. No. | Item Description |
| 1 | Material and labour for cleaning of shell and tube water cooled condensers of the A/C plants of following capacities after dismantling the water lines and headers and cleaning with suitable wire brush and washing soda to remove the dirt and water scaling and refixing the water lines and headers including provision of new gaskets, in every 02 months etc complete all as directed by Engr-in-Charge. |
| 2 | (a) 2 x 15 TR capacity Mag No 06 |
| 3 | (b) 3 x 15 TR capacity MIG-29 Wksp |
| 4 | (b) 3 x 15 TR capacity Mag No 07 |
| 5 | (d) 3 x 25 TR capacity AC Mag No 03 |
| 6 | (e) 3 x 37 TR capacity APRE-2 |
| 7 | (f) 2 x 50 TR capacity AC Mag No 01 & 02 |
| 8 | (g) 2 x 11 TR capacity package AC Plant NoN explosive store NAD |
| 9 | Supply and fix in repairs ball / roller bearing for pumps and motors of following capacity including taking down old bearing and re installation at site including testing on completion. |
| 10 | (a) Up to 10 HP capacity |
| 11 | (b) 25 HP capacity |
| 12 | Supply and charging Refrigerant compressor oil Servo manufactured by Indian Oil Corporation or Equivalent approved make including flushing/cleaning of oil chamber etc complete all as directed by Engr-in-Charge. |
| 13 | Nitrogen testing for the following capacity of compressors including condensing unit and gas piping complete as per the manufacturer instructions and entire satisfaction of the Engineer in Charge.Note :- Nitrogen pressure should be held without any drop in pressure inside the unit continue for 24 hours. |
| 14 | Supply and filling Nitrogen Gas Cylinder of 7.5 cubic meter complete all as specified and directed by Engr-in-Charge. |
| 15 | Supply and filling Refrigerant gas R-407 of 61 Kg complete all as specified and directed by Engr-in-Charge. Note: The refrigerant gas was supplied only Goa state authority dealer. |
| 16 | Supply and filling Refrigerant gas R-22/Mafron -22 for AC plant compressor of 61 Kg complete all as specified and directed by Engr-in-Charge.Note: The refrigerant gas was supplied only Goa state authority dealer. |
| 17 | Material and labour for servicing Monoblock pumps including dismantling and opening the pump, replacement of defective impeller, bearing , stuffing box, back plates, gland packing mechanical seal and rusted nut, bolts etc assembling properly, greasing all movable parts, fixing in position, testing and commissioning all as directed for the following HP pumps. |
| 18 | (a) 3 HP to 5 HP Pump |
| 19 | (b) 7.5 HP to 10 HP Pump |
| 20 | Supply and fixing in replacement of power assembly expansion valve for following AC Plants as per existing make and model complete all as specified and directed by Engr-in-Charge. |
| 21 | (a) Upto 30 TR AC Plant |
| 22 | (b) 50 TR to 74 TR AC Plant |
| 23 | Supply and fixing in replacement of Motor & Voltage Protection Device (MVPD) for AC plant as per existing make and model complete all as specified and directed by Engr-in-Charge. |
| 24 | Supply and fix replacement of microprocessor/PCB for compressor of capacity from 18 TR to 60 TR as per existing make/model. |
| 25 | Supply and fix of V-belt for AHU as per existing size of following AC Plants complete all as specified and directed. |
| 26 | (a) 15 TR AC Plant |
| 27 | (a) 30 TR AC Plant |
| 28 | (b) 50 TR to 74 TR AC Plant |
| 29 | Realignment of compressor and motor of any capacity on existing foundation. |
| 30 | Supply and fixing of CI butterfly valves included with matching flanges, gaskets, hardware duly insulated with preformed pipe section fabricated to shape and bonded with adhesive removable cover is required valves in 26 SWG aluminium sheet, cover should be divided in to portions quick release toggles shall be used for assembly of covers. |
| 31 | (a) 50 mm bore. |
| 32 | (b) 65 mm bore. |
| 33 | (c) 80 mm bore. |
| 34 | Supply and fix High pressure control switch as per existing make and type including taking down old switch. |
| 35 | Supply and fix oil pressure control switch as per existing make and type including taking down old switch. |
| 36 | Supply and fix low pressure control switch as per existing make and type including taking down old switch. |
| 37 | Supply and fix LP/HP cut out as per existing make and model including taking down old cutout for AC Plant upto 30 TR capacity. |
| 38 | All as per item No 18 but for AC Plant 50 TR to 74 TR capacity. |
| 39 | Supply and fixing power contractor assembly for upto 10 HP motor/pump complete as per existing type and make including taking down old contactor |
| 40 | All as per item No 20 but for 25 HP motor |
| 41 | Supply and fixing replacement of Thermal Overload relay range 9 - 12.5 amps as per existing make suitable for upto 10 HP motor/pump complete. |
| 42 | All as per item No 22 but 30-36 amps. |
| 43 | Supply and fixing electronic timer for star delta function having time range 1 - 20 sec, input voltage 380-440V AC or as per existing make and model including taking down of old one. |
| 44 | All as per item No 24 but 3 - 60 sec |
| 45 | Supply and fixing indicator lamp assembly set complete LED type suitable for the existing system supply voltage 230V / 440 V AC including taking down old lamp assembly. |
| 46 | Supply and fixing push button assembly complete LED type suitable for the existing system supply voltage 230V / 440 V AC including taking down push button assembly. |
| 47 | Supply and fixing replacement of Water pressure guage of condensing water line complete. |
| 48 | Supply and fixing replacement of Microprocessor controller unit of any capacity AC plant. |
| 49 | Dismantling the unserviceable electric motor any type or of any capacity and transporting to reputed workshop, taking out old and burnt winding wire and rewinding with super enameled copper winding wire of existing gauge and size with insulating materials, varnishing and baking etc, re-fixing the same at site and re-alignment, testing and commissioning complete all as directed by Engr-in-Charge |
| 50 | a).Up to 5 HP motor |
| 51 | b) 7.5 to 10 HP motor |
| 52 | Taking out old and fix new PVC fins of size 600 mm x 300 mm x 150 mm for cooling tower of any capacity AC plant and replacing with new one including setting complete. |
| 53 | Supply and fixing in replacement of AHU filter having Pre filter efficiency of 90% and filtration level of 10 microns made out of GI channel frame overall size 61 cm x 61 cm x 5 cm including nylon micro filter and wire mesh covered front and back all as per sample given. |
| 54 | Preparation of old painted surfaces by removing dust, rust etc and, applying two coats of synthetic enamel paint with spray gun of approved make and colour for cooling tower, condensing pipe line condenser water pumps including all pipe line valves etc. size any Capacity of Plant. |
| 55 | Supply and fix in replacement of CT fan (with hub and fan blade) of motor capacity of upto 7.5 Hp, F Class, IP55 rated flange mounted weather proof and fan dia 900mm made up of cast aluminium alloy for cooling tower all as specified and directed by Engr-in-Charge |
| 56 | Supply and fixing replacement of chilled water sensor for AC Plants of any capacity |
| 57 | Supply and fix in replacement of solenoid valve assembly complete for compressor of capacity upto 30 TR. |
| 58 | Supply and fix in replacement of solenoid valve assembly complete for compressor of capacity from 50 TR upto 74 TR. |
| 59 | Supply and fix in replacement of Thermostatic expansion valve assembly complete of capacity upto 30 TR. |
| 60 | Supply and fix in replacement of Thermostatic expansion valve complete of capacity from 30 TR. To 50 TR |
| 61 | Supply and fix in replacement of cooling tower nozzles 1/4'' size of existing model |
| 62 | Supply and fix in replacement of block bearing for air handling unit as per existing make and model. |
| 63 | Supply and fix in replacement of pressure relief valve as per existing make and model. |
| 64 | Supply and fix in replacement of Shut off valve of model 5F 40. |
| 65 | Supply and fix in replacement of Rubber coupling of Compressor voltas. |
| 66 | Material and labour in replacement of Circular Type FRP Flow Cooling Tower outer body as per existing size , all MS structures of tower, vertical with uniform water distribution and optimal heat transfer, suitable for 30 TR AC plant capacity, casing of sufficient structural strength to withstand vibrations pads and wind velocity upto 60 m/s, FRP basin, rigid honeycomb type PVC fill of suitable thickness, SS sprinklers and non-clogging sprinkler pipes, FRP drift eliminator, repair of motor ‘F’ class IP-55 Flange mounted weather proof, 900mm dia fan made up of cast aluminium alloy and all fins including of necessary foundation work and fixed with existing pipe line with any extra cost complete all as specified and directed |
| 67 | Material and labour in replacement of Circular Type FRP Flow Cooling Tower outer body as per existing size , all MS structures of tower, vertical with uniform water distribution and optimal heat transfer, suitable for 50 TR AC plant capacity, casing of sufficient structural strength to withstand vibrations pads and wind velocity upto 60 m/s, FRP basin, rigid honeycomb type PVC fill of suitable thickness, SS sprinklers and non-clogging sprinkler pipes, FRP drift eliminator, repair of motor ‘F’ class IP-55 Flange mounted weather proof, 1200mm dia fan made up of cast aluminium alloy and all fins including of necessary foundation work and fixed with existing pipe line with any extra cost complete all as specified and directed |
| 68 | Dismantling the compressor and taking out the shaft from the compressing unit and taking to the reputed workshop for necessary lathe/ machining work to match the bearing size, cleaning inside the compressing unit and necessary overhauling including replacement of defective parts complete as directed installation of compressor and connect with motor, alignment and carrying out of testing to the entire satisfaction of Engr-in-charge for 15 TR AC plant compressor.Note : The rate quoted should be including defective spares required to be replaced. |
| 69 | Supply only spare for 15 TR capacity compressor |
| 70 | (a) Main bearing for both ends |
| 71 | (b) Connecting rod bearing |
| 72 | (c) C R bush |
| 73 | (d) Pistons |
| 74 | (e) Pistons pin |
| 75 | (f) Piston ring set |
| 76 | (g) Piston circlips |
| 77 | (h) C R Nuts & bolts |
| 78 | (j) S V Reeds |
| 79 | (k) D V Reeds |
| 80 | (l) S V Springs |
| 81 | (m) D V Spring |
| 82 | (n) Suction filter dryer. |
| 83 | (o) Oil pump |
| 84 | (p) Linear o ring |
| 85 | (q) Gasket set |
| 86 | (r) Thrust washer |
| 87 | (s) Aluminium Gasket set |
| 88 | (t) Oil pressure regulating valve |
| 89 | (u) Suction and discharge valve O ring seat |
| 90 | Dismantling of old unserviceable compressor from condensing or chiller unit, and Supply, installation, testing & commissioning in replacement of scroll compressor of capacity 12.5 TR, 3 Phase, 415 V, self-lubricating complete including new refrigerant gas, HP and LP sensors with control wiring, connecting and rewiring with microprocessor based control panels and all as specified and as directed. Make : Danfoss Model No. SZ185S4RC or equivalent as approved by GE. |
| 91 | Material and labour for assembly and erection on repair of GI sheet with TDF flange rectangular/square duct made out of L shaped hollow profile, duly factory boxed, including all accessories such as corner, cleat, carriage bolt, gasket and appropriate sealant on longitudinal joints etc complete of size 22 gauge including taking down old items complete all as specified and as directed by Engr-in-charge. |
| 92 | Material and labour for providing acoustic lining in repair to the ducting by using FG crown 200x25mm thick rigid board density 32kg/m3 covered with RP tissue & 28G aluminium perforated sheet & using GI nuts, bolts & washer for the entire duct complete all as specified and as directed by Engr-in-charge. |
| 93 | Material and labour for thermal insulation of duct using adhesive & FG crown-150 factory laminated covered with aluminium foil of 50mm thickness complete all as specified and as directed by Engr-in-charge. |
| 94 | Servicing of AC plant hot water bank including internal wiring, replace of any minor parts and repair of control panel of heater all as specified and as directed by Engr-in-charge. |
| 95 | Supply and fix in replacement of heater 2 KW capacity including making electrical connections with main supply complete all as specified and as directed. |
| 96 | Charges for attending break down of AC plant of 15 TR to 74 TR capacity by only auth OEM rep / team for fault finding including attending repairs as and when required such as No start condition of AC plant and repairing, starting the AC plant till smooth running and setting up the alignment/required parameters of all major parts such as fan belt, compressor, gas charge, cooling tower, power contactor, starter, MCCBs, Micro processor based control panel, pumps etc as required in ground/as ordered by EIC all as specified and as directed. |
| 97 | Supply and fixing humidistat including all accessories as per existing complete all as specified and directed. |
| 98 | Supply and fix of V-belt of size A32 including taking down old belt all as specified and as directed. |
| 99 | Supply and fix in replacement of power contactor assembly complete 63 Amps, 50 KA, 415 V all as specified and as directed |
| 100 | Supply and fix in replacement of power contactor assembly complete MNX -25 including taking down old contactor all as specified and as directed |
| 101 | Supply and fix in replacement of power contactor assembly complete MNX -12 with one NO and NC including taking down old contactor all as specified and as directed |
| 102 | Supply and fix in replacement of power contactor assembly complete MNX -32 including taking down old contactor all as specified and as directed |
| 103 | Disconnecting wiring carefully and removing defective auxiliary power contactor assembly complete and replacing by new one of size 12.5 to 20 Amps type 3 NA with 1 NO+NC all as specified and as directed. |
| 104 | Supply and fix in replacement of Overload relay range upto 7.5 Amps suitable for MNX contactor all as specified and as directed |
| 105 | Supply and fixing electronic timer ST 100(3 to 10 sec) 240 V or as per existing Make including taking down of old one all as specified and as directed |
| 106 | Supply and fixing in replacement of MCB TP 40 to 63 Amps 10 KA all as specified and as directed |
| 107 | Supply and replacement of MCCB 3 pole 415 Amps 125 Amps breaking capacity 25 KA all as specified and as directed |
| 108 | Supply and fixing in replacement of MCB SP 06 to 32 Amps 10 KA all as specified and as directed |
| 109 | Supply and fixing in repair fabricated micro filter upto 90 micron made out of GI channel frame overall size 61cm X 61cmX5CM including nylon micron filter and wire mesh covered front and back all as specified all as per sample given including taking down old micro filter all as specified and as directed |
| 110 | Supply and fix n replacement of pressure gauge for neon gases 0 to 25 kg all as specified and as directed. |
| 111 | Supply and fix in replacement of pressure gauge for neon gases 0 to 16 kg all as specified and as directed. |
| 112 | Supply and fix in replacement of microprocessor for compressor of capacity upto 50TR all as specified and as directed |
| 113 | Supply and fix in repairs Thermostatic Expansion Valve assembly complete for R-22 gas all as specified and as directed Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 09, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedJul 30, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 20 daysAug 01, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 22 daysTender Documents
Download All (ZIP) ↓
Disclaimer