Power Government Departments Closing in 5 days TDR #56392591

Tender for Tender for Work Of Issuing Connections As Per Application Under Full Deposit Scheme (Nivesh Mitra/Jhatpat Portal) In The Jurisdiction Of Electricity Distribution Division, Muradnagar.

Issued by Government Departments · Ghaziabad, Uttar Pradesh
Tender Value
50 Lakhs
Estimated cost
Bid Submission
16 Jul 2026
5 days left
EMD
50000
Bank guarantee accepted
Document Fee
3540
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Ghaziabad → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Work Of Issuing Connections As Per Application Under Full Deposit Scheme (Nivesh Mitra/Jhatpat Portal) In The Jurisdiction Of Electricity Distribution Division, Muradnagar.

BOQ

Name of Work:- fo|qr forj.k [k.M eqjknuxj ds dk;Z{ks= esa iw.kZ tek ;kstukUrxZr ¼fuosk fe=@>ViV iksVZy½ ij vkosnukuqlkj la;kstu fuxZr djus dk dk;ZA
Sl. No. Item Description
1fo|qr forj.k [k.M&eksnhuxj ds vUrxZr 11 dsoh ykbZu fuekZ.k ,oa foHkfDrdj.k rFkk 33 dsoh ykbZu ds lqn`<+hdj.k dk dk;ZA
2Carriage Of Followings From Esc.Modinagar/Muradnagar/Ghaziabad/Shahiabad To Pit Site On Kachcha Pacaa Road Including Loading And Unloading Chagres At Both Ends, Rcquricd For Proper Completion Of Work, Distance About To 60 Kms.
3Steel Tubular Pole 13 Mtr. Long
4Steel Tubular Pole 11 Mtr. Long
5Steel Tubular Pole 09 Mtr. Long
6Pcc Pole 11 Mtr. Long
7Pcc Pole 09 Mtr. Long
8Pcc Pole 8.5 Mtr Long.
9Loading/Unloading & Carriage Of Transformer. From Esc. Modinagar/Muradnagar/Ghaziabad To Pit Site On Kachcha Pacaa Road Including Loading And Unloading Chagres At Both Ends, Rcquricd For Proper Completion Of Work, Distance About To 60 Kms.
1010 Kva Transformer.
1116 Kva Transformer.
1225 Kva Transformer.
1363 Kva Transformer.
14100 Kva Transformer.
15250 Kva Transformer.
16Carriage Of All Line Material From Store Center Modinagar/Muradnagar/Ghaziabad/Shahiabad To Je Store Sub Station As Acsr Weasel Conductor, Abc Conductor Gi Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator Etc.
17Carriage Of 33kv/11kv Ct/Pt Unit From Electricity Store Center, Modinagar/Muradnagar/Ghaziabad To Site Of Work With Loading And Unloading At Both Ends On Kachha Packka Road, As Per Direction Of Site Incharge (0-50 Km).
18Carriage Of 33kv/11kv Metering Cubical Set Complete, From Electricity Store Center, Bsr To Site Of Work With Loading And Unloading At Both Ends On Kachha Packka Road, As Per Direction Of Site Incharge (0-50 Km).
19Carriage Of 11 Kv Vcb Complete, From Electricity Store Center, Bsr To Site Of Work With Loading And Unloading At Both Ends On Kachha Packka Road, As Per Direction Of Site Incharge (0-50 Km).
20Carriage Of Xlpe Cable From Store Center To Je Sub Station/Any Other Place Including Loading And Unloading At Both End.
2111 KV XLPE CABLE 3X70, 3x120, 3x185 SQ MM
2233 KV XLPE CABLE 3X185, 3x240, 3x300 SQ MM
23Erection Of Single Pole Support Including Complete 1 It Fittings As Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work.
24Steel Tubular Pole 13 Mtr. Long
25Steel Tubular Pole 11 Mtr. Long
26Steel Tubular Pole 09 Mtr. Long
27Pcc Pole 11 Mtr. Long
28Pcc Pole 09 Mtr. Long
29Pcc Pole 8.5 Mtr Long.
30Erection Of Double Pole/Section Double Pole Support Including Complete 1 It Fittings As Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work.
31Steel Tubular Pole 13 Mtr. Long
32Steel Tubular Pole 11 Mtr. Long
33Steel Tubular Pole 09 Mtr. Long
34Pcc Pole 11 Mtr. Long
35Pcc Pole 09 Mtr. Long
36Pcc Pole 8.5 Mtr Long.
37Grouting Of Single Support Shall Be Grouted With Cement, Sand And Birck Ballast/Stone Ballast In Ratio 1:4:8 30x3030 Cms, Including The Cost Of Cement, Sand, Birck Ballast/Stone Ballast, Etc. As Per Actual Size Requirement, As Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work.
38Steel Tubular Pole 13 Mtr. Long
39Steel Tubular Pole 11 Mtr. Long
40Steel Tubular Pole 09 Mtr. Long
41Pcc Pole 11 Mtr. Long
42Pcc Pole 09 Mtr. Long
43Pcc Pole 8.5 Mtr Long.
44Grouting Of Double Pole/Section Double Pole Support Shall Be Grouted With Cement, Sand And Birck Ballast/Stone Ballast In Ratio 1:4:8 =30x3030 Cms. Including The Cost Of Cement, Sand, Birck Ballast/Stone Ballast, Etc. As Per Actual Size Requirement, As Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work.
45Steel Tubular Pole 13 Mtr. Long
46Steel Tubular Pole 11 Mtr. Long
47Steel Tubular Pole 09 Mtr. Long
48Pcc Pole 11 Mtr. Long
49Pcc Pole 09 Mtr. Long
50Pcc Pole 8.5 Mtr Long.
51Carriage Of All Line Material From J.E Store Sub Station To Pit Site Acsr Weasel Conductor, Abc Conductor Gi Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator Etc.
52Fabrication And Cutting/Drilling/Welding Of Ms Angle Iron T-Off Channel Etc. For Making Guarding Angle Of Various Size Including The Work Of Fixing The Bracket On Pcc/St Pole For Construction Of The Line.
53Laying Of 11 Kv Xlpe Cable 3*70/3*120/3*185 Square Mm & Outer Size Newly Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T&P, Carrier Etc. Requried For Proper Completion Of Work.
54Laying Of 33 Kv Xlpe Cable 3x185/3x240/3x300 Square Mm & Outer Size Newly Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T&P, Carrier Etc. Requried For Proper Completion Of Work.
55Laying Of 33/11 Kv Xlpe Cable 3x185/300 With Cost Of Digging, Bricks And Sand Completed In All Accessories.
56Laying, Sagging. Stringing And Binding And Jumpering Of Lt Xlpe Cable Size 3.5 X150/240/400 Square Mm & Outher Size Newly Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T&P, Carrier Etc. Requried For Proper Completion Of Work.
57Laying, Sagging. Stringing And Binding And Jumpering Of Acsr Weasal, Rabbit, Dog Newly Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T&P, Carrier Etc. Requried For Proper Completion Of Work.
58Acsr Weasal Conductor
59Acsr Rabbit Conductor
60Acsr Dog Conductor
61Abc Cable 1*16 Square Mm
62Abc Cable 3*50 Square Mm
63Abc Cable 3*95 Square Mm
64Abc Cable 3*120 Square Mm
65Fixing Of 11 Kv Stay Rod With Stay Wire In Proper Way With Nozelling
66Grouting Of 11 Kv Stay Rods
67Plinth Of Pole/Kiking Of Pole Up Nuturel Ground Level With Material Sand, Brick Etc. Provide By The Contractor Requried For Proper Completion Of Work.
68Fixing Of 33 Kv Stay Rod With Stay Wire In Proper Way With Nozelling
69Grouting Of 33 Kv Stay Rods
70Fixing Of 11 Kv Pin Insulator
71Fixing Of 33 Kv Pin Insulator
72Fixing Of Single Phase Distribution Box
73Fixing Of Three Phase Distribution Box
74Fixing 11 Kv Disc Insulator
75Fixing Of 11 Kv Disc Fitting
76Fixing 33 Kv Disc Insulator
77Fixing Of 33 Kv Disc Fitting
78Fixing Of Number Plate With Clamp, Nut And Bolt.
79Fixing Of Danger Board With Clamp, Nut And Bolt.
80Fixing Of T-Off Channel
81Fixing Of 11 Kv Cross Arm V-Type.
82Fixing Of 33 Kv Cross Arm V-Type.
83Fixing Of Top/Drop Channel
84Fixing Of Sub Station Angle.
85Erection & Fixing Of 11kv. Fuse Set On Stp/Pcc Pole, By Providing All Required Fixing Materials As Per Respo/Norms And As Per Direction Of Site Incharge. (Only Fuse Set Will Be Provided By The Department.
86Erection & Fixing Of 11kv. Tpmo Set On Stp/Pcc Pole, By Providing All Required Fixing Materials As Per Respo/Norms And As Per Direction Of Site Incharge. (Only Tpmo Set Will Be Provided By The Department).
87Fixing Of Barbet Wire.
88Painting Of Pole With Aluminium Paint.
89Painting Of Pole With Red Oxide Paint.
90Fixing Of Aluminium Binding Wire 06 Swg
91Fixing Of G.I. Pile 6\\" Dia.
92Fixing Of Aluminium Joindint Sleeves.
93Fixing Of I-Bolt.
94Fixing Of 6 Swg G.I. Wire.
95Fixing Of U-Clamp.
96Fixing Of Pearcing Connector.
97Making/Filling Of 11 Kv Cable Jointing Kit/Straight Through Of Various Size Xlpe Cable
98Making/Filling Of 33 Kv Cable Jointing Kit/Straight Through Of Various Size Xlpe Cable
99Earthing Of Supports With Ms Earth Rod Of (20x2500)Mm Long Including Excavation Of Pit And Driving M.S. Rod 3.0 M Apart From Support And 0.5m Below The Ground Level And Connection Below The Earth Electrodes With The Help Of G.I. Wire & Earthing Lugs As Per Respo Drawing/Norms By Providing Proper Size Nuts & Bolts, As Per Direction Of Site Incharge.
100Laying, Hosting And Commissiong Of 33 or 11 Kv Xlpe Cable Of 3x240/3x300 Sq.Mm. In Double Ckt. Cable Through Hdpe Pipe By Manual Trenchless Method With Three Sides Of Bricks And One Side Of Sand Complete Work In All Respect.
101Laying, Hosting And Commissiong Of 33 Kv 3x300sqmm Xlpe Cable Double Ckt. Cable In Hdpe Pipe Through Hdd Trenchless Method By Machine With Complete Work In All Respect.
102Digging Of Pits Of Size 4 Mtr X 4 Mtr X 1.5 Mtr For Cable Loop And Making Risers At Double Pole And Re-Filling Of Pits In Proper Manner With Required Material At Kacha/Pakka And Hot Mix Road. (All Work And Material In The Scope Of Contractor)
103Laying Of 33kv Of 3x240/3x300 Sq.Mm Xlpe Cable In The Air On Cable Riser Double Pole, Existing Trench Cable Trench, G.I.Pipe And Making Connection Complete At Both Ends.
104Laying And Interconnecting Of Above Hdpe Pipe Pe-80, Pn-6, Dn-140mm, 6\\" Dia By Hdd Trenchless Method For Hosting Of 33 Kv 3x300sq.Mm And 11 Kv Xlpe Cable Of Various Size With Complete Work In All Respect.
105Laying and hosting Of 140/160mm O/D Pn-4pe-80 Pn-4 Grade Uv Stabilized Hdpe Pipe As Per Is Of 6meter, For Laying Of Underground Cable As Per Respo/Norms, Including Cost Of Above Hdpe Pipe, As Per Direction Of Site Incharge. (Rate Will Be Charge As Per Actual Length Of Work)
106Safely Installing The 33 Kv Ct/Pt Unit With The Help Of Crane/Manual Labour At Sub-Station Double Pole/Plinth, As Per Direction Of Site Incharge.
107Safely Installing of vcb With The Help Of Crane/Manual Labour At Sub-Station Double Pole/Plinth, As Per Direction Of Site Incharge.
108Safely Installing The 33 Kv Meter Cubicle Unit With The Help Of Crane/Manual Labour At Sub-Station Double Pole/Plinth, As Per Direction Of Site Incharge.
109Safely Installing The 33 Kv Meter Pilfer Unit With The Help Of Crane/Manual Labour At Sub-Station Double Pole/Plinth, As Per Direction Of Site Incharge.
110Construction Of Transformer. Plinth Suitable For 250/400 Kva Transformer. (Size Of 2 X 2 X 1.5 Mt.) As Per Drawing, Cc Work In Foundation In Ratio 1:3:6 (Cement, Sand & Brick Ballast). Ist Class Brick Work In Side Walls Cc Ratio Of 1:4 (Cement & Fine Sand). 12mm Thick Plaster In Ratio 1:4 (Cement & Fine Sand). The Rcc Work On Top Of Plinth In Ratio 1:2:4 After Duly Filling Of Brick Ballast Inside The Plinth & Ramming The Same, Including Cost Of All Material & Labour, As Per Direction Of Site Incharge.
111Construction Of Plinth of VCB.
112Construction Of Safety Fencing (Ms) Size 3x3x2 Mtr. For Transformer 11/0.4 Kv Sub Station, With Supply Of Material Required For Ms Fencing (50x50x3 Mm) M.S. Wire Mesh Construction Utilizing Vertical Post Duly Grouted/Fitted In Ground/On Floor. Horizontal Angle/T-Iron To Be Fitted On Vertical Posts. Pickets (If Required) Fitted To Rail And Gate To Facilitate Entry And Exit. The Vertical Posts/Horizontal Post Shall Be Made Of M.S. Angle 75x75x6mm. Such Post Shall Be Kept Preferably At Distance Of 800-1000 Mm. And Shall Be Grounded With Cc Ratio 1:4:8. The Length Of Vertical Post Shall Be Sufficient To Take Care Of Fencing As Requirement At Site, And As Per Direction Of Site Incharge.
113Providing, Carrying Of Tailless Unit, Circuit Having 3 Phase For 500 Amp Load. Each Job Includes 2 Tail Less Units.
114Erection & Installation Charges For Tail Less Unit. Each Job Includes 2 Tail Less Unit.
115Providing, Carrying Of Mccb Ith Box & Busbar.
116Providing, Carrying Of Mccb Ith Box & Busbar.
117Providing And Installation Of Maintenance Free Multifaceted Proactive And Corrosion Free Chemical Earthing Electrod Size 80mm X 3000 Mm Complete With 50kg Backfill Compound With All Required Accessories For Body/Neutral Earthing Of Transformers, Including Cost Of M.S. Earth Strip For Connection The Earth Strip Will Be Welded To The Earthing And Neutral Support, As Per Respo/Norms And As Per Direction Of Site Incharge.
118Digging Of Earth And Refling With Road Restoration Pacca Road Charge As Per Respo/Drawing Norms. As Per Direction Of Site Incharge.
119Digging Of Earth And Refilling With Road Restoration Kaccha/Footpath Charge As Per Respo/Drawing Norms. As Per Direction Of Site Incharge.
120Dismantling/Removal Of Old Line To One Side For Double Circuit.
121Mounting & Installation Of Transformer. From D/P
12210 Kva Transformer.
12316 Kva Transformer.
12425 Kva Transformer.
12563 Kva Transformer.
126100 Kva Transformer.
127250 Kva Transformer.
128Supply Of Below De-Centralised/Market Material For Completing The Works As Per Respo.(Contractor Will Provide The Material At His Own Cost.)
12911 Kv Cross Arm Holding Clamp.
13033 Kv Cross Arm Holding Clamp.
13111 Kv Cable Jointing Kit/Straight Through Of Size 3X70/3X120X3X185 Square Mm.
13233 Kv Cable Jointing Kit/Straight Through Of Size 3X240/3X300 Square Mm.
133Jumpheing Work Of Lt/Ht Line For Proper Energization Of Line.
134Providing Of 33 Kv Cable Jointing Kit 3*300 Square Mm Straight Throuth/ Outdoor.
135Providing Of Single Phase Distribution Box
136Providing Of Three Phase Distribution Box
137Providing Of Number Plate With Clamp, Nut And Bolt.
138Providing Of Danger Board With Clamp, Nut And Bolt.
139Providing Of Barbet Wire.
140Providing Of Aluminium Paint.
141Providing Of Red Oxide Paint.
142Providing Of Aluminium Binding Wire 06 Swg
143Providing Of G.I. Pile 6\\" Dia.
144Providing Of 140mm Od Pn-6-Pe-80, 6\\" Dia Grade Uv Stabilized Hdpe Pipe.(Pvvnl Gtp Approved)
145Providing Of Aluminium Joindint Sleeves.
146Providing Of I-Bolt.
147Providing Of 6 Swg G.I. Wire.
148Providing Of U-Clamp.
149Providing Of Pearcing Connector.
150Double Pole Clamp
151F Clamp
152F-Bracket For 11 Kv Line
153F-Bracket For 33 Kv Line
154Lt Clamp
155Tf Clamp 4 Nos. Set
156Pg Clamp
157Jhook
158Earth Clamp
159Stay Clamp
160Dead & Clamps
161Stay Insulator For 11 Kv
162Suspension Clamps
163Lt Insulator
164Providing & Fixing Of Nut & Bolt With Washer As Per Site Requirement.
165Dismantling, safe lowering, loading, transportation from site to departmental store (Esc. Modinagar/Muradnagar/Ghaziabad/Shahibabad), unloading and safe stacking of the following transformer capacities, complete in all respects.
16610 Kva Transformer.
16716 Kva Transformer.
16825 Kva Transformer.
16963 Kva Transformer.
170100 Kva Transformer. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56392591
AUTHORITY Government Departments
TENDER VALUE 50 Lakhs
LAST DATE 16-07-2026
Authority
Authority Name Paschimanchal Vidyut Vitran Nigam Limited
Work Description Tender for Work Of Issuing Connections As Per Application Under Full Deposit Scheme (Nivesh Mitra/Jhatpat Portal) In The Jurisdiction Of Electricity Distribution Division, Muradnagar.
Basic Detail
Tender No T-20/2026-27/EDC/GZB
Bidding Type Tender
Location
City Ghaziabad
State Uttar Pradesh
Key Dates
Publish Date 09 Jul 2026
Submission Date 16 Jul 2026
Open Date 16 Jul 2026
Finance
Tender Value 50 Lakhs
Tender Fee 3540
EMD 50000
Exemption Not Available
Document List
20TenderDocument.pdf
91db8a6e-1b24-4beb-8768-82be4c203bae.html
BOQ_2189393.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 09, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 16, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 5 days
Jul 16, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 5 days

Tender Documents

Download All (ZIP) ↓
pdf

20TenderDocument.pdf

html

91db8a6e-1b24-4beb-8768-82be4c203bae.html

xls

BOQ_2189393.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders