Defence Government Departments Closing in 16 days TDR #56385445

Bids Are invited for Repair And Overhauling Service - Replacement Of Chiller Units Pressure Testing Vacuum Testing Stw Of Three Ac Plants In Ship; Any Other Suitable Brand; No; Buyer Premises - Compressors & Motor – Retrieval Of Freon & Lo From The C

Issued by Government Departments · Visakhapatnam, Andhra Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
28 Jul 2026
16 days left
EMD
39000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Visakhapatnam → Andhra Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Bids Are invited for Repair And Overhauling Service - Replacement Of Chiller Units Pressure Testing Vacuum Testing Stw Of Three Ac Plants In Ship; Any Other Suitable Brand; No; Buyer Premises - Compressors & Motor – Retrieval Of Freon & Lo From The Compressor & System, Degutting Of Freon Pipelines, Degutting Of Compressor, Motor From The Bed. , Condenser – Degutting Of Condenser From The Bed And Secure Them Onboard. , Condenser – Degutting Of Freon System Pipelines, Isolating Valves And Sea Water System Pipelines Connecting The Condenser. , Chiller Unit (Old) – Degutting Of Freon System And Chilled Water System Pipelines Connecting The Chiller Units. , Chiller Unit (Old) – Degutting Of Chiller Unit From The Bed And Shifting From Onboard Ship To Jetty Through Technical Cut. , Chiller Unit (Old) – Transporting The Chiller Units From Jetty To Shop Floor. , Chiller Unit (New) (I) Opening End Covers, Flushing The Tubes With Nitrogen.(Ii) Pressure Testing Of Evaporator On Both Gas And Chilled Water Side To Check Tube Integrity, Defects If Any Observed, To Be Rectified & End Covers To Be Boxed Up. (Ii) Renew End Cover Gaskets If Required. , Chiller Unit (New) – Post Completion Of Pressure Testing Of New Chiller Units At Shop Floor, Transport Them To Jetty And Shifting Of New Chiller Units From Jetty To Onboard And Position Them On The Bed. , Chiller Unit (New) – Regutting Of Associated Freon System Pipelines, Isolating Valves And Chilled Water System Pipelines. Modification Of Chiller Foundation If Required Including Machining And Hot Work Assistance. , Instrumentation – Degutting & Regutting Of The Following (I) Lp, Hp And Dop Cut Outs Of Freon System (03 Nos) (Ii) Chilled Water & Sea Water Dp Cut Out (02 Nos)(Iii) Chilled Water Temperature Thermostat (01 No)(Iv) Chilled Water Temperature Gauges (02 Nos)(V) Pressure Gauges (08 Nos) , Condenser - Regutting Of Condensers On To The Bed And Freon System Pipelines, Isolating Valves And Sea Water System Pipelines , Compressors & Motor – Regutting Of Compressor & Motor On To The Bed And Associated Freon System Pipelines , Compressors – Laser Alignment Of Compressor With Electric Motor , Flushing The Refrigerant Piping, Refrigerant Circuit With Nitrogen , System – Pressure Testing Of System Upto 22 Bar Pressure For 24 Hrs. , System – Vacuum Testing Of System Upto 30 Hg For 12 Hrs. , System – Gas Charging And Preparing The System For Starting , Commissioning, Sdc Checks & Performance Trials Of System

BOQ

Sl. No. Item TitleItem Description
1Compressors & Motor – Retrieval of freon & LO from the compressor & system, degutting of freon pipelines, degutting of compressor, motor from the bed.Compressors & Motor – Retrieval of freon & LO from the compressor & system, degutting of freon pipelines, degutting of compressor, motor from the bed.
2Condenser – Degutting of condenser from the bed and secure them onboard.Condenser – Degutting of condenser from the bed and secure them onboard.
3Condenser – Degutting of freon system pipelines, isolating valves and sea water system pipelines connecting the condenser.Condenser – Degutting of freon system pipelines, isolating valves and sea water system pipelines connecting the condenser.
4Chiller unit (old) – Degutting of freon system and chilled water system pipelines connecting the chiller units.Chiller unit (old) – Degutting of freon system and chilled water system pipelines connecting the chiller units.
5Chiller unit (old) – Degutting of chiller unit from the bed and shifting from onboard ship to jetty through technical cut.Chiller unit (old) – Degutting of chiller unit from the bed and shifting from onboard ship to jetty through technical cut.
6Chiller unit (old) – Transporting the chiller units from jetty to shop floor.Chiller unit (old) – Transporting the chiller units from jetty to shop floor.
7Chiller unit (new) (i) Opening end covers, flushing the tubes with Nitrogen.(ii) Pressure testing of evaporator on both Gas and chilled water side to check tube integrity, defects if any observed, to be rectified & end covers to be boxed up. (ii) Renew end cover gaskets if required.Chiller unit (new) (i) Opening end covers, flushing the tubes with Nitrogen.(ii) Pressure testing of evaporator on both Gas and chilled water side to check tube integrity, defects if any observed, to be rectified & end covers to be boxed up. (ii) Renew end cover gaskets if required.
8Chiller unit (new) – Post completion of pressure testing of new chiller units at shop floor, transport them to jetty and shifting of new chiller units from jetty to onboard and position them on the bed.Chiller unit (new) – Post completion of pressure testing of new chiller units at shop floor, transport them to jetty and shifting of new chiller units from jetty to onboard and position them on the bed.
9Chiller unit (new) – Regutting of associated freon system pipelines, isolating valves and chilled water system pipelines. Modification of chiller foundation if required including machining and hot work assistance.Chiller unit (new) – Regutting of associated freon system pipelines, isolating valves and chilled water system pipelines. Modification of chiller foundation if required including machining and hot work assistance.
10Instrumentation – Degutting & regutting of the following (i) LP, HP and DOP cut outs of freon system (03 nos) (ii) Chilled water & sea water DP cut out (02 nos)(iii) Chilled water temperature thermostat (01 no)(iv) Chilled water temperature gauges (02 nos)(v) pressure gauges (08 nos)Instrumentation – Degutting & regutting of the following (i) LP, HP and DOP cut outs of freon system (03 nos) (ii) Chilled water & sea water DP cut out (02 nos)(iii) Chilled water temperature thermostat (01 no)(iv) Chilled water temperature gauges (02 nos)(v) pressure gauges (08 nos)
11Condenser - Regutting of condensers on to the bed and freon system pipelines, isolating valves and sea water system pipelinesCondenser - Regutting of condensers on to the bed and freon system pipelines, isolating valves and sea water system pipelines
12Compressors & Motor – Regutting of compressor & motor on to the bed and associated freon system pipelinesCompressors & Motor – Regutting of compressor & motor on to the bed and associated freon system pipelines
13Compressors – Laser Alignment of compressor with electric motorCompressors – Laser Alignment of compressor with electric motor
14Flushing the refrigerant piping, refrigerant circuit with nitrogenFlushing the refrigerant piping, refrigerant circuit with nitrogen
15System – Pressure testing of system upto 22 bar pressure for 24 hrs.System – Pressure testing of system upto 22 bar pressure for 24 hrs.
16System – Vacuum testing of system upto 30 hg for 12 hrs.System – Vacuum testing of system upto 30 hg for 12 hrs.
17System – Gas charging and preparing the system for startingSystem – Gas charging and preparing the system for starting
18Commissioning, SDC checks & performance trials of systemCommissioning, SDC checks & performance trials of system

AI Tender Summary

OUR REF NO 56385445
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 28-07-2026
Authority
Authority Name Indian Navy
Work Description Bids Are invited for Repair And Overhauling Service - Replacement Of Chiller Units Pressure Testing Vacuum Testing Stw Of Three Ac Plants In Ship; Any Other Suitable Brand; No; Buyer Premises - Compressors & Motor – Retrieval Of Freon & Lo From The Compressor & System, Degutting Of Freon Pipelines, Degutting Of Compressor, Motor From The Bed. , Condenser – Degutting Of Condenser From The Bed And Secure Them Onboard. , Condenser – Degutting Of Freon System Pipelines, Isolating Valves And Sea Water System Pipelines Connecting The Condenser. , Chiller Unit (Old) – Degutting Of Freon System And Chilled Water System Pipelines Connecting The Chiller Units. , Chiller Unit (Old) – Degutting Of Chiller Unit From The Bed And Shifting From Onboard Ship To Jetty Through Technical Cut. , Chiller Unit (Old) – Transporting The Chiller Units From Jetty To Shop Floor. , Chiller Unit (New) (I) Opening End Covers, Flushing The Tubes With Nitrogen.(Ii) Pressure Testing Of Evaporator On Both Gas And Chilled Water Side To Check Tube Integrity, Defects If Any Observed, To Be Rectified & End Covers To Be Boxed Up. (Ii) Renew End Cover Gaskets If Required. , Chiller Unit (New) – Post Completion Of Pressure Testing Of New Chiller Units At Shop Floor, Transport Them To Jetty And Shifting Of New Chiller Units From Jetty To Onboard And Position Them On The Bed. , Chiller Unit (New) – Regutting Of Associated Freon System Pipelines, Isolating Valves And Chilled Water System Pipelines. Modification Of Chiller Foundation If Required Including Machining And Hot Work Assistance. , Instrumentation – Degutting & Regutting Of The Following (I) Lp, Hp And Dop Cut Outs Of Freon System (03 Nos) (Ii) Chilled Water & Sea Water Dp Cut Out (02 Nos)(Iii) Chilled Water Temperature Thermostat (01 No)(Iv) Chilled Water Temperature Gauges (02 Nos)(V) Pressure Gauges (08 Nos) , Condenser - Regutting Of Condensers On To The Bed And Freon System Pipelines, Isolating Valves And Sea Water System Pipelines , Compressors & Motor – Regutting Of Compressor & Motor On To The Bed And Associated Freon System Pipelines , Compressors – Laser Alignment Of Compressor With Electric Motor , Flushing The Refrigerant Piping, Refrigerant Circuit With Nitrogen , System – Pressure Testing Of System Upto 22 Bar Pressure For 24 Hrs. , System – Vacuum Testing Of System Upto 30 Hg For 12 Hrs. , System – Gas Charging And Preparing The System For Starting , Commissioning, Sdc Checks & Performance Trials Of System
Basic Detail
Tender No GEM/2026/B/7734854
Bidding Type Tender
Location
City Visakhapatnam
State Andhra Pradesh
Key Dates
Publish Date 09 Jul 2026
Submission Date 28 Jul 2026
Open Date 28 Jul 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 39000
Exemption Not Available
Document List
9d875e0b-0d64-46d3-8eb2-ac17268ecc07.pdf
1782972097.xlsx
1783589871.pdf
1783589873.pdf
1783589877.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 09, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 28, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 16 days
Jul 28, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 16 days

Tender Documents

Download All (ZIP) ↓
pdf

9d875e0b-0d64-46d3-8eb2-ac17268ecc07.pdf

xlsx

1782972097.xlsx

pdf

1783589871.pdf

pdf

1783589873.pdf

pdf

1783589877.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders