Power Government Departments Closing in 12 days TDR #56385288

Tender For Construction Of 33/11Kv Gss Alongwith 33Kv And 11Kv Lines At Rawaliya Under Aen(O&M) Mangrol In Chittorgarh Circle

Issued by Government Departments · Ajmer, Rajasthan
Tender Value
22.16 Lakhs
Estimated cost
Bid Submission
23 Jul 2026
12 days left
EMD
44320
Bank guarantee accepted
Document Fee
2950
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Ajmer → Rajasthan
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Construction Of 33/11Kv Gss Alongwith 33Kv And 11Kv Lines At Rawaliya Under Aen(O&M) Mangrol In Chittorgarh Circle

BOQ

Name of Work:- Construction of 33/11KV GSS alongwith 33KV and 11KV lines at Rawaliya under AEN(O&M) Mangrol in Chittorgarh Circle
Sl. No. Item Description
1Construction of 33/11KV GSS
2Levelling of ground
3Levelling of ground up to 30 cm.depth. with tractor and T&P required as per condition of ground including removal of rubbish plants from ground & marking of boundary with lime powder.(Including all lead & lifting)
4Levelling of ground above 30 cm.to 90 CM.depth. with tractor and T&P required as per condition of ground including removal of rubbish plants from ground & marking of boundary with lime powder.(Including all lead & lifting)
5Trimming of tree branches/plants and preparing route approchases for proposed line.
6Excavation of pit in ordinary rock which does not require blasting to erect various supports and stay sets including stacking of excavated muck from the edge of excavation/pit.
79 Mtr/ 1.2mx0.6mx1.50 m deep
8(C)Stay set/Depth of pit
9Earth work excavation and foundation of platfrom of transformers and brakers including dressing of sides and ramming of bottoms .Liftup to 1.5 Meter including taking out the excavated soil and depositing and refilling of jhiri, watering and ramming and disposal of surplus excavated soil as directed with in a lead of 50 Meter.
10Hard/dense soil
11Providing and laying cement concrete including compaction etc, complete using stone aggregate 40 mm nominal size (hand broken) in foundation plinth excluding the cost of shuttering using 1 cement : 5 sand : 10 aggregate mix.Note :1. The rates are all lead of cement, lime, ballast, sand, surkhi and grit etc. at site of work.2. For all concrete work coarse sand shall be used no extra will be paid .3. Concrete mix prepared by power driven mechanical mixer shall be used .4. Under exceptional coditions, where mechanical mixer and vibrator are not used (with the approval of Engineer Incharge reduced by 3% for mechanical mixer and 2% for Vibrator.5. Thickness of the cement concrete should not exceeed 100 mm.
12Plaster on new surface on walls in cement, sand mortar 1:6 including racking of joint etc. complete fine finsh 25 mm thick.Note :1. The rates for complete work including racking of joints, curing, grinding, mixing and finishing T&P and scaffolding material and cost of material with all lead and lift.2. The rates cover protection of all place and things, requiring protection and cleaing such places and thing of all droppings and splashes of mortar etc.
13Cement concrete flooring grade 1:2:4 (1-cement :2- coarse sand :4-graded stone aggregate ) rounding off edges etc.but excluding cost of nosing of steps etc. complete.Note :1. The rates for all items inculde all form of work, laying, curing and finishing etc. The rates are for complete work at site, inclusive of all leads.2. The rates cover the preparation and cleaing of all places
1425 mm thick with 12.5 mm thick nominal size aggregate.
1575 mm thick with 20 mm thick nominal size aggregate.
16Masonry for foundation and plinth
17Randon Rubble stone masonry for foundation and plinth in cement sand mortar 1:6(1 Cement : 6 Sand) including labour charges.
18Brick masonry for foundation and plinth in Cement sand mortar 1:6 ( 1 Cement : 6 Sand ) including labour charges.
19Safe carriage of PCC poles including loading / un-loading
20a) 9 Mtr. Long-400 Kg /11 Mtr. PCC pole
21Within 10 Kms.
22Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.
23c) 9 Mtr.long 200 Kg. PCC pole
24within 10 Kms.-
25Above 10 Km. & upto 30 Km. add for each Km. or part thereof
26Safe carriage of steel( fabricated and unfabricated) I.e.M.S. Rails, R.S.Joists, M.S.Channels, M.S.Angles, M.S.Flat, G.I.Stay Sets, G.I. Stay Wire, G.I.Wire Nut & Bolts etc. and ACSR Conductor including loading and unloading and stacking in Nigam store /at work site
27Within 10 Kms.
28Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.
29Above 30 Kms. Add for each Kms. or partthereof.
30Safe Carriage of insulator, hardware, cable etc.including loading/unloading and stacking in Nigam.stores etc.
31Within 10 Kms.
32Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.
33Above 30 Kms. Add for each Kms. or part thereof.
34Safe carriage of fabricated lattice towers structures and sub-station structures type AB, AB beams, isolators structures etc. including loading/unloading and stacking in the Nigam. Stores / at work site.
35Within 10 Kms.
36Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.
37Above 30 Kms. Add for each Kms or part thereof.
38Safe carriage of 11/.4 KV 3 Phase distribution transformer including loading/unloading.from store to site(b) 25 & 40 KVA
39Within 10 Kms.
40Above 10 Kms. & upto 30 Kms Add for each Km.or part thereof.
41Above 30 Kms. Add for each Kms. or part thereof.
42Safe Carriage of 33/11 KV Power Transformer Above 1.6MVA and up to 3.15MVA
43Within 10 Kms
44Above 10 Kms & upto 30 Kms . Add for each Km or partthereof
45Above 30 Kms & upto 50 Kms . Add for each Km or partthereof
46Above 50 Kms . Add for each Km or part thereof
47Safe carriage of breakers/kiosks etc. including loading/ unloading and stacking in Nigam stores
48Within 10 KMs.
49Above 10 Kms. and upto 30 Kms.Add per each km,or part thereof
50Above 30 Kms. and upto 50 Kms.Add per each km,or part thereof
51Above 50 Kms.Add per each km,or part thereof
52Safe Carriage of 33/11 KV Power Transformer
53Safe loading of power/ distribution transformer.
54Above 1.6 MVA & upto 3.15 MVA
55Safe unloading of power/distribution transformers
56Above 1.6 MVA & upto 3.15 MVA
57Erection &assembly of 2 Pole structures of steel supports or PCC poles in excavated pit in alignment after checking the same with plumb line.Including fixing of top bracing of M.S.Channels with pilot plates and clamps.The support is to be back filled with soil with proper ramming.The nuts &bolts are to be provided by the contractor as per Nigams specfication for which the payment will be made at the prevailing Discom store issue rates.
58PCC Poles 9 Mtr. Long(200 Kg.)
59Fixing of all type of fabricated material on erected supports with nut & bolts as per approved design & drawing of sub-station.
60Fixing of 11kv B&S/T&C type disc insulator for 33kv lines (each unit consiting of 3 nos .disc.& 1set of H/W) on terminal point including fixing of hardware and strips.
61Fixing of 11kv B&S/T&C type disc insulator of 11kv lines (each unit consiting of 1nos.disc.& 1set of H/ W ) on terminal point including fixing of hardware and strips.
62Fixing of 11kv B&S/T&C type disc insulator of 11kv lines (each unit consiting of 2 nos.disc.& 1set of H/ W ) on terminal point including fixing of hardware and strips.
63Fixing of 33kv pin insulator with pins.
64Assembly. Installation & commissioning of gang operated isolating switch on erected structure with setting for accurate operation including fixing of allied accessories completein all respect with post insulator and jumpering on both ends for connection with the system. The nuts and bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates. (B)G.O. switch . without earthing blade.
6533kv G.O.switch
6611kv G.O.switch
67Assembly and installation of Horn Gap fuse set (set of 3nos)on erected structure as per design, complete in all respectwith post insulator including jumpering on both ends for connection with the system. The nuts & bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates.
6833kv Horn Gap fuse set.
6911kv Horn Gap fuse set.
70Installation of lightening arrestors on erected structure /support (set of 3 nos) including connection with earth by wire /strip as required and jumpering etc. The nuts & boltswill be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates, (A)sub-station type
7133 KV L.A. set ( 1set=3 Nos)
7211 KV L.A. set ( 1set=3 Nos)
73Installation testing as per Nigams norm & commissioning of 11/0.4KV distribution transformer on erected supports including fixing of base channels as per requirment jumpering on HV&LV side, crimping of lugs/ clamping earth connections of body and neutral of transformer with wire /strip (as already provided with earthing ) complete in all respect. The PG clamps nuts & bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates,
7425 and 40 KVA
75Fixing of danger plates on supports/structure
76Fixing of PG clamp of Weasel /Rabbit Conductor
77Fixing of PG clamp of Dog /Racoon Conductor
78Assembly,installation & commisioning of 11 KV Roaster switchs on erected structures with stting for accurate operation including fixing of allied accessories completed in all respect with post insulators and jumpering on both ends for connection with systm.The nuts & bolts will be supplied by contractor for which payment will be made as per prevailing Dicom store issue rates.
79Three no. Earthing of 11/0.4 KV distribution transformer /sub-station with M.S.Rod 20mm dia each 3 meter long and driving them into earth by mechanical means at a distance as per approved design & drawing & specification.The work includes flattening of top ends of M.S.rod drilling a hole of 9/16\\" dia.at flattened top and tightening of M.S.flat 50x6mm/25x3 mm (having 3 hole 2ends and 1mm middle) with nuts and bolts with M.S.rods top end hole.The flat will also be welded with M.S.rod.The end will be connected to equipments as under in sequence.
80Mesh earthing for 33/11 kv sub-station as per approved map &design usingMS flat 50X6mm/MS road 20mm dia includinglaying of flat/rod at the depth of 0.65 Mtrs.,welding & jointing at joints , structures & equipments etc.asunder:
81Excavation of trench of 0.65Mtrs.depth and 0.5Mtr.width
82Ordinary rock ( where blasting is not required.)
83Laying of MS flat /MS rod in 0.65Mtr.deep excavated trench and welding of MS flat/rod continuosly with 100 mm overlaping for straight joint including coating of MS flat joints with molten bitumen and covering joint with bitumen impregnated tape to protect from rust.
84Shaping of MS flat for connecting the equipments with earthmesh .The work includes the welding of MS flat with equipments/structure and also with earth mesh.The work also includes coating of MS flat joint with molten bitumen and covering jointwith bitumen impregnated tape to protect from rust.
85Preparation of spikes made of M.S Rod of 20 mm dia and 3 Mtr.length as per design and requirment to be driven in earth by mechanical means and Providing & .fastening of suitable clampswith the M.S. Rod, connection of earth wire/stay wire/MS flat in clamp depending on type of soil:
86Where drilling is required
87Filling of trench with available excavated muck in layers of 20cm (Max.)consolidating each deposited layer by ramming & watering with lead up to 50 Mtr, and lift up to 1.5 Mtr.
88Painting of exposed portion of MS flat/rod with two coats of red-oxide primer and two coats of green enamel paint.including material.
89Earthing of new 33/11 KV S/S with bentonite compound (including material ) involving following activities. (8.5.1 TO 8.5.6 COVERED)
90Pipe Earthing for Power Transformer at 33/11KV S/S :-Supply and erection of earthing electrode shall consist of G.I. Pipe 100 mm, of 3 Mtr. Length. The electrode shall be buried as far as practicable 3 Meters below ground level. Wherever possible earth electrodes shall be located as near the water tap, water drain or near down take pipe. Earth electrodes shall not be installed in proximity to a metal fance. It shall be kept clear of the bulidings foundations and in no case it shall be nearer than 2 Mtr. from the outer face of the wall. The electrode shall be surrounded with layer of charcoal dust and salt mixture through out the length. The 100 mm G.I. pipe shall be provided with holes of 12 mm Dia drilled at 75mm interval upto 2.5 meters length from bottom. The top of the pipe shall be provided with a G.I. threaded cap for watering the earth through a pipe. A clamp with pati of 12\\" of M.S. Flat of size 50x6 mm shall be fixed (Bolted) on the top age of the pipe which in turn shall be connected Neutral/Body of the Power Transformer through M.S. Flat size 50x6 mm. The G.I. cap over the G.I. Pipe shall be housed in a masonry chamber, approximately 300 mm x 300 mm x 300 mm deep. The masonry chamber shall be provided with a RCC Inspection cover resting over a RCC frame, embedded in masonry.
91Erection of PCC poles in excavated pit in alignment after checking the same with plumb line as per approved design & drawing of 33/11kv sub-station.The pit should be back filled with the soil with proper ramming below 30cm ground level and then muffed above 15cm average ground level with cement concrete ratio1:3:6.The charges for muffing will be paid extra as per chapter code no 5.7 The nuts & bolts will be supplied by the contractor for which payment will be made at the prevailing store issue rates. (B) IN RURAL AREA
92PCC Poles 9 Mtr. Long
93Laying / stringing of bus bar with ACSR Dog & jumper connection using tie rod ,33KV /11KV insulator strings,required hardware,P.G.clamps/T clamps etc.as per requirement including Y-connections at bus bar jumpering point as per the direction of engineer in-charge.
94ACSR Panther
95ACSR DOG/RABBIT
96Supply, stacking & spreading of stone boulders 40 mm. Mono size.(Less voids 17%)
97Erection of OCB/Kiosk/VCB complete with accessories including use of special tools & conducting all pre-commissioning test before energization,filling oil etc. complete in all respect with erection & grouting of structure (excluding civil works). The relays will be tested by Discom.
9833 KV VCB/SF-6 Breaker
9911 KV VCB (Outdoor )
100Installation of current/potential transformers on supporting structure including checking of wiring & conducting all pre-commissioning tests before energization & satisfactory operation in all respect (The CT/PT set will be tested by Discom).
10133 KV CT(1 set of 3 Nos.) OR PT Set
10211 KV CT(1 set of 3 Nos.) OR PT Set
103Laying, testing termination of control cable 1100 volts PVC insulated including supply and installation of ferrules to designate various cores of control cables by terminal Nos. of identification including utilization of cable gland. The control cable should be clearly arranged in trenches avoiding crossings including clamping of control cable at regular interval and providing identify tags.
10412x2.5 Sq.mm.
105Installation of metering points on 11 KV Out going feeder at 33/11 KV S/S.(a to g)
106Painting with priming coats or ready mixed red-oxide paint 2 coats of approved make on steel works after cleaning with wire brush / sand paper.(including cost of red oxide)
107On new surface
108Painting with aluminium paint of approved brand and manufacturer to give an even surface.(including cost aluminium paint)
109On new works with two coats.
110Fabrication of steel structures of M.S angle ,M.S.channel & M.S.Flat including cutting ,drilling as per design and drawing.
111Other steel items
112Drilling of holes in MS Channel / Angle /Flat
11315/16\\" dia holes(23.81 mm dia.)
114Transportation of CT/PT set (all size) including loading and unloading from Nigam store to site
115(a) Within 10 Kms.
116(b) Above 10 Km upto 30 Km. Add for each Km. or part there off
117Above 30 Kms. Add per each km,or part thereof Amendment reference D. 1518 dt. 29.03.16
118Supply of MS nuts & bolts
119Supply of PG Calmps
12033 KV Line work
121Conducting route survey as per approved route map and pegging of route with tee off point section point & double pole locations.
122Trimming of tree branches/plants and preparing route approchases for proposed line.
123Excavation of pit in soil (ordinary) to erect various supports and stay sets including stacking of excavated soil from the edge of excavation(15% extra shal be payable for the designated desert area panchayat samities of Jodhpur Discom in pursuance of Jdvvnl order no 1240 dt. 18.07.2013).
124(A) Height of poles/R.S.Joist/M.S. Rail Size of pit
1259 Mtr/ 1.2mx0.6mx1.50 m deep
126(B) Lattice Tower /Size of pit
12712.8/12.6 Mtr/ 1.5mx1.5m x2.10 m deep
128(C)Stay set/Depth of pit
1298'x 3/4\\" -0.75x0.5x1.6 m
1306'x 5/8\\" -0.75x0.5x1.35 m
131Excavation of pit in Hard soil
132(A) Height of poles/R.S.Joist/M.S. Rail Size of pit
1339 Mtr/ 1.2mx0.6mx1.50 m deep
134(B) Lattice Tower /Size of pit
13512.8/12.6 Mtr/ 1.5mx1.5m x2.10 m deep
136(C)Stay set/Depth of pit
1378'x 3/4\\" -0.75x0.5x1.6 m
138Excavation of pit in ordinary rock which does not require blasting to erect various supports and stay sets including stacking of excavated muck from the edge of excavation/pit.
139(A) Height of poles/R.S.Joist/M.S. Rail /Size of pit
1409 Mtr/ 1.2mx0.6mx1.50 m deep
141(B) Lattice Tower /Size of pit
14212.8/12.6 Mtr/ 1.5mx1.5m x2.10 m deep
143(C)Stay set/Depth of pit
1448'x 3/4\\" -0.75x0.5x1.6 m
145Excavation of pit in Hard rock ( Where blasting is required) to erect various supports and stay sets including stacking of excavated muck from the edge of excavation/pit.
146(A) Height of poles/R.S.Joist/M.S. Rail /Size of pit
1479 Mtr/ 1.2mx0.6mx1.50 m deep
148(B) Lattice Tower /Size of pit
14912.8/12.6 Mtr/ 1.5mx1.5m x2.10 m deep
150(C)Stay set/Depth of pit
1518'x 3/4\\" -0.75x0.5x1.6 m
152Safe carriage of PCC poles including loading / un-loading
153a) 9 Mtr. Long-400 Kg /11 Mtr. PCC pole
154Within 10 Kms.
155Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.
156Safe carriage of steel( fabricated and unfabricated) I.e.M.S. Rails, R.S.Joists, M.S.Channels, M.S.Angles, M.S.Flat, G.I.Stay Sets, G.I. Stay Wire, G.I.Wire Nut & Bolts etc. and ACSR Conductor including loading and unloading and stacking in Nigam store /at work site
157Within 10 Kms.
158Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.
159Above 30 Kms. Add for each Kms. or partthereof.
160Safe Carriage of insulator, hardware, cable etc.including loading/unloading and stacking in Nigam.stores etc.
161Within 10 Kms.
162Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.
163Above 30 Kms. Add for each Kms. or part thereof.
164Safe carriage of fabricated lattice towers structures and sub-station structures type AB, AB beams, isolators structures etc. including loading/unloading and stacking in the Nigam. Stores / at work site.
165Within 10 Kms.
166Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.
167Above 30 Kms. Add for each Kms or part thereof.
168Erection of all type of steel supports in the excavated pit in alignment after checking the same with plumb line including fixing of cross arms and top hamper before erecting the supports. The support should be grouted and muffed in cement concrete of ratio 1:3:6 as per item No. 5.7 the remaining portion of the pit will be back filled with soil. The nuts & bolts will be provided by the contractor as per Nigam's specification for which payment will be made at the prevailing store issue rates. The cost muffing and grouting will be paid extra.
169Lattice Structure
170Providing and laying of cement concrete in ratio 1:3:6 using 43 grade cement,river sand and 12 mm to 20 mm graded blast crusher broken in pit/foundation according to the size/type of supports/stay set including compaction/curing for 21days in steel plates shuttering /farmer base.
171Assembly. Installation & commissioning of gang operated isolating switch on erected structure with setting for accurate operation including fixing of allied accessories completein all respect with post insulator and jumpering on both ends for connection with the system. The nuts and bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates. (B)G.O. switch . without earthing blade.
17233kv G.O.switch
173Painting with priming coats or ready mixed red-oxide paint 2 coats of approved make on steel works after cleaning with wire brush / sand paper.(including cost of red oxide)
174On new surface
175Painting with aluminium paint of approved brand and manufacturer to give an even surface.(including cost aluminium paint)
176On new works with two coats.
177Erection of PCC poles in excavated pit with fixing of brackets,cross arms & top hampers as required in alignment after checking the same with plumb line. The support is to be back filled with soil with proper ramming. The nuts & bolts are to be provided by the contractor as per Nigam's specification for which the payment will be made at the prevailing Discom store issue rates.
178PCC Poles 9 Mtr. Long(200Kg.)
179PCC Poles 9 Mtr. Long (400 Kg)
180Erection &assembly of 2 Pole structures of steel supports or PCC poles in excavated pit in alignment after checking the same with plumb line.Including fixing of top bracing of M.S.Channels with pilot plates and clamps.The support is to be back filled with soil with proper ramming.The nuts &bolts are to be provided by the contractor as per Nigams specfication for which the payment will be made at the prevailing Discom store issue rates.
181PCC Poles 9 Mtr. Long(400 Kg.)
182Erection & fixing of G.I.Stay sets with anchor plates in excavated pit in required position and back filling with soil with proper ramming.The work includes fixing of stay clamps.Stay insulator with stay wire at both ends with proper tension.Size of stay set/stay wire
1838\\"x3/4\\" with 7/8 SWG stay wire
184Laying ,jointing , stringing, tensioning and clamping of conductor with proper sag as directed , using bolted type hardware including binding on pin insulators,jumpering on section points with binding wire / P.G.clamps.Aluminium jointing sleeves will be used for jointing the conductor.The line must stand at proper voltage on charging.The contractor will be provide P.G.clamps for which payment will be made as per prevailing Discom issue rate.
185(B) IN RURAL AREA
186ACSR DOG
187Fixing of 33kv pin insulator with pins.
188Fixing and assembly of disc.point channel pair with pilot plates&clamps on erected double pole structure as per design. The nuts &bolts are to be provided by the contractor as per Nigams specification for which payment will be made as per prevailing Discom store issue rates.
18933 KV line
190Fixing and assembly of disc.point channel pair with pilot plates top hampers & clamps on erected single pole structure as per design. The nuts &bolts are to be provided by the contractor as per Nigams specification for which payment will be made as per prevailing Discom store issue rates,
19133 KV line
192Laying , jointing,stringing,tensioning and clamping of G.I.Earthwire continuosly on single/double pole by using earth clamps /nuts & bolts with washers and earth reel etc.including proper binding at each end.The nuts and bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates.
193(A).In Rural Area
194G.I.Earth wire 6 SWG
195G.I.Earth wire 8 SWG
196Drawing & stringing of G.I. 4 wire over the guarding bracket for guarding of road crossing /P&T crossing /Railway track crossing (for one span only)with cross G.I.wire laces at an interval of two meter each or required as per location using EYE bolt, nuts and bolts with washers etc.including binding .The EYE bolts and other nuts and bolts will be provided by thecontractor for which payment will be made as per prevailing Discom store issue rates.
197(A) For 4 wire stringing
1986 SWG with laces of 8 SWG
199Fixing of G.I. Laces on Guard wire at an interval of one meter each or required as per location using EYE bolt ,nuts and bolts with washers etc.including binding,if required .The EYE bolts and other nuts and bolts will be provided by the contractor for which payment will be made as per prevailing Discom store issue rates.
200For 4 Guard wire
201Earthing of line for all type of supports as per REC construction standards using Stay wire/GI wire with one pcs.of M.S.rod20mm dia each 3 meter long and driving into earth by mechanical means as per approved design.Drawing &specification.All material except MS rod,MS flat & stay wirewill be supplied by the contractor.If material is supplied by the contractor ,the payment will be made as per prevailing Discomstore issue rates.(In case of PCC poles earthing must be connected with earthwire already available on PCC pole at bottom)
202Fixing of 11kv B&S/T&C type disc insulator for 33kv lines (each unit consiting of 3 nos .disc.& 1set of H/W) on terminal point including fixing of hardware and strips.
203Laying of two ( D/C) 33KV, XLPE (Aluminium conductor) undrground cables w/o overlapping as per relevant IS/ AVVNL standard including excavation of 50 cm width x 120 cm deep trench in Kaccha land.25 cm thick under layer of sand. 'A' class bricks or concrete block covering refilling soil in the remaining portion and providing/fixing cable route indicators at every 30Mtr.of cable and at every turn.
204A) 3x50 Sq mm to 3x185 Sq mm
205B) 3x 240 Sq mm to 3x400 Sq mm
206Note:- per meter shall be paid extra for excavation in Pakka Road.
207Intallation of 33 KV Cable (XLPE) termination / straight through joints ( Heat shrinkable type) as per manufacturer's kit guidance and direction including preparation of cable and testing refilling etc as required.(Including crimping of lugs)
208(I) Outdoor end terminal 3x50 Sq mm to 3x185 Sq mm
209(ii) 3x240 Sq mm to 3x400 Sq mm
210Fixing of PG clamp of Dog /Racoon Conductor
211Fabrication of steel structures of M.S angle ,M.S.channel & M.S.Flat including cutting ,drilling as per design and drawing.
212Other steel items
213Drilling of holes in MS Channel / Angle /Flat
21415/16\\" dia holes(23.81 mm dia.)
21511 KV Line work
216Conducting route survey as per approved route map and pegging of route with tee off point section point & double pole locations.
217Trimming of tree branches/plants and preparing route approchases for proposed line.
218Excavation of pit in soil (ordinary) to erect various supports and stay sets including stacking of excavated soil from the edge of excavation(15% extra shal be payable for the designated desert area panchayat samities of Jodhpur Discom in pursuance of Jdvvnl order no 1240 dt. 18.07.2013).
219(A) Height of poles/R.S.Joist/M.S. Rail Size of pit
2209 Mtr/ 1.2mx0.6mx1.50 m deep
221(B) Lattice Tower /Size of pit
22212.8/12.6 Mtr/ 1.5mx1.5m x2.10 m deep
223(C)Stay set/Depth of pit
2248'x 3/4\\" -0.75x0.5x1.6 m
2256'x 5/8\\" -0.75x0.5x1.35 m
226Excavation of pit in Hard soil
227(A) Height of poles/R.S.Joist/M.S. Rail Size of pit
2289 Mtr/ 1.2mx0.6mx1.50 m deep
229(B) Lattice Tower /Size of pit
23011.4/10.8 Mtr/ 1.5mx1.5m x1.80 m deep
231(C)Stay set/Depth of pit
2326'x 5/8\\" -0.75x0.5x1.35 m
233Excavation of pit in ordinary rock which does not require blasting to erect various supports and stay sets including stacking of excavated muck from the edge of excavation/pit.
234(A) Height of poles/R.S.Joist/M.S. Rail /Size of pit
2359 Mtr/ 1.2mx0.6mx1.50 m deep
236(B) Lattice Tower /Size of pit
23711.4/10.8 Mtr/ 1.5mx1.5m x1.80 m deep
238(C)Stay set/Depth of pit
2396'x 5/8\\" -0.75x0.5x1.35 m
240Excavation of pit in Hard rock ( Where blasting is required) to erect various supports and stay sets including stacking of excavated muck from the edge of excavation/pit.
241(A) Height of poles/R.S.Joist/M.S. Rail /Size of pit
2429 Mtr/ 1.2mx0.6mx1.50 m deep
243(B) Lattice Tower /Size of pit
24411.4/10.8 Mtr/ 1.5mx1.5m x1.80 m deep
245(C)Stay set/Depth of pit
2466'x 5/8\\" -0.75x0.5x1.35 m
247Safe carriage of PCC poles including loading / un-loading
248c) 9 Mtr.long 200 Kg. PCC pole
249within 10 Kms.-
250Above 10 Km. & upto 30 Km. add for each Km. or part thereof
251Safe carriage of steel( fabricated and unfabricated) I.e.M.S. Rails, R.S.Joists, M.S.Channels, M.S.Angles, M.S.Flat, G.I.Stay Sets, G.I. Stay Wire, G.I.Wire Nut & Bolts etc. and ACSR Conductor including loading and unloading and stacking in Nigam store /at work site
252Within 10 Kms.
253Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.
254Above 30 Kms. Add for each Kms. or partthereof.
255Safe Carriage of insulator, hardware, cable etc.including loading/unloading and stacking in Nigam.stores etc.
256Within 10 Kms.
257Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.
258Above 30 Kms. Add for each Kms. or part thereof.
259Safe carriage of fabricated lattice towers structures and sub-station structures type AB, AB beams, isolators structures etc. including loading/unloading and stacking in the Nigam. Stores / at work site.
260Within 10 Kms.
261Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.
262Above 30 Kms. Add for each Kms or part thereof.
263Assembly. Installation & commissioning of gang operated isolating switch on erected structure with setting for accurate operation including fixing of allied accessories completein all respect with post insulator and jumpering on both ends for connection with the system. The nuts and bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates.
26411kv G.O.switch
265Fixing of 11 KV pin insulator with pins.
266Fixing of 11kv B&S /T&C type disc insulator of 11kv lines (each unit consiting of 1nos.disc.& 1set of H/W ) on terminal point including fixing of hardware and strips.
267Fixing of PG clamp of Weasel /Rabbit Conductor
268Laying , jointing,stringing,tensioning and clamping of G.I.Earthwire continuosly on single/double pole by using earth clamps /nuts & bolts with washers and earth reel etc.including proper binding at each end.The nuts and bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates.
269(A).In Rural Area
270G.I.Earth wire 8 SWG
271Earthing of line for all type of supports as per REC construction standards using Stay wire/GI wire with one pcs.of M.S.rod20mm dia each 3 meter long and driving into earth by mechanical means as per approved design.Drawing &specification.All material except MS rod,MS flat & stay wirewill be supplied by the contractor.If material is supplied by the contractor ,the payment will be made as per prevailing Discomstore issue rates.(In case of PCC poles earthing must be connected with earthwire already available on PCC pole at bottom)
272Fabrication of steel structures of M.S angle ,M.S.channel & M.S.Flat including cutting ,drilling and continunous welding joint as per design and drawing.
273Other steel items
27415/16\\" dia holes(23.81 mm dia.)
275Supply of MS nuts & bolts
276Erection of all type of steel supports in the excavated pit in alignment after checking the same with plumb line including fixing of cross arms and top hamper before erecting the supports. The support should be grouted and muffed in cement concrete of ratio 1:3:6 as per item No. 5.7 the remaining portion of the pit will be back filled with soil. The nuts & bolts will be provided by the contractor as per Nigam's specification for which payment will be made at the prevailing store issue rates. The cost muffing and grouting will be paid extra.
277Lattice Structure
278Providing and laying of cement concrete in ratio 1:3:6 using 43 grade cement,river sand and 12 mm to 20 mm graded blast crusher broken in pit/foundation according to the size/type of supports/stay set including compaction/curing for 21days in steel plates shuttering /farmer base.
279Painting with priming coats or ready mixed red-oxide paint 2 coats of approved make on steel works after cleaning with wire brush / sand paper.(including cost of red oxide)
280On new surface
281Painting with aluminium paint of approved brand and manufacturer to give an even surface.(including cost aluminium paint)
282On new works with two coats.
283Erection of PCC poles in excavated pit with fixing of brackets,cross arms & top hampers as required in alignment after checking the same with plumb line. The support is to be back filled with soil with proper ramming. The nuts & bolts are to be provided by the contractor as per Nigam's specification for which the payment will be made at the prevailing Discom store issue rates.
284(B) IN RURAL AREA
285PCC Poles 9 Mtr. Long(200Kg.)
286Erection &assembly of 2 Pole structures of steel supports or PCC poles in excavated pit in alignment after checking the same with plumb line.Including fixing of top bracing of M.S.Channels with pilot plates and clamps.The support is to be back filled with soil with proper ramming.The nuts &bolts are to be provided by the contractor as per Nigams specfication for which the payment will be made at the prevailing Discom store issue rates.
287PCC Poles 9 Mtr. Long(200 Kg.)
288Erection & fixing of G.I.Stay sets with anchor plates in excavated pit in required position and back filling with soil with proper ramming.The work includes fixing of stay clamps.Stay insulator with stay wire at both ends with proper tension.Size of stay set/stay wire
2896\\"x5/8\\" with 7/10 SWG stay wire
290Fixing and assembly of disc.point channel pair with pilot plates top hampers & clamps on erected single pole structure as per design. The nuts &bolts are to be provided by the contractor as per Nigams specification for which payment will be made as per prevailing Discom store issue rates,
29111 KV line
292Laying ,jointing , stringing, tensioning and clamping of conductor with proper sag as directed , using bolted type hardware including binding on pin insulators,jumpering on section points with binding wire / P.G.clamps.Aluminium jointing sleeves will be used for jointing the conductor.The line must stand at proper voltage on charging.The contractor will be provide P.G.clamps for which payment will be made as per prevailing Discom issue rate.
293(B) IN RURAL AREA
294ACSR RABBIT
295Drawing & stringing of G.I. 4 wire over the guarding bracket for guarding of road crossing /P&T crossing /Railway track crossing (for one span only)with cross G.I.wire laces at an interval of two meter each or required as per location using EYE bolt, nuts and bolts with washers etc.including binding .The EYE bolts and other nuts and bolts will be provided by thecontractor for which payment will be made as per prevailing Discom store issue rates.
296(A) For 4 wire stringing
2978SWG with laces of 10 SWG
298Fixing of G.I. Laces on Guard wire at an interval of one meter each or required as per location using EYE bolt ,nuts and bolts with washers etc.including binding,if required .The EYE bolts and other nuts and bolts will be provided by the contractor for which payment will be made as per prevailing Discom store issue rates.
299For 3 Guard wire Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56385288
AUTHORITY Government Departments
TENDER VALUE 22.16 Lakhs
LAST DATE 23-07-2026
Authority
Authority Name Ajmer Vidyut Vitran Nigam Limited
Work Description Tender for Construction Of 33/11Kv Gss Alongwith 33Kv And 11Kv Lines At Rawaliya Under Aen(O&M) Mangrol In Chittorgarh Circle
Basic Detail
Tender No AJD /SE(TW)/TN-467/Lot-4
Bidding Type Tender
Location
City Ajmer
State Rajasthan
Key Dates
Publish Date 09 Jul 2026
Submission Date 23 Jul 2026
Open Date 24 Jul 2026
Finance
Tender Value 22.16 Lakhs
Tender Fee 2950
EMD 44320
Exemption Not Available
Document List
BOQ_1021177.xls
SpecificationTN467.pdf
Tendernotice_1.pdf
a436bce5-3175-49a6-a227-e07e831a2d7d.html

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 09, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 23, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 12 days
Jul 24, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 13 days

Tender Documents

Download All (ZIP) ↓
xls

BOQ_1021177.xls

pdf

SpecificationTN467.pdf

pdf

Tendernotice_1.pdf

html

a436bce5-3175-49a6-a227-e07e831a2d7d.html

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders