Power Boards / Undertakings / PSU Closing in 2 days TDR #56385154

Tender For Running Contract For Deposit Works Under Edd-Baldirai, Sultanpur.

Issued by Boards / Undertakings / PSU · Sultanpur, Uttar Pradesh
Tender Value
28.30 Lakhs
Estimated cost
Bid Submission
16 Jul 2026
2 days left
EMD
28500
Bank guarantee accepted
Document Fee
3540
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Sultanpur → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Running Contract For Deposit Works Under Edd-Baldirai, Sultanpur.

BOQ

Name of Work:- Running Contract for Deposit Works under EDD-Baldirai, Sultanpur.
Sl. No. Item Description
1PART-A (Material)
2Following Materials Supplied by the Contractor :-
3Stone pad.
4LT Clamp with Nut & Bolts.
5Earth Wire Clamp with Nut & Bolts.
6Clamp for Top/T-off/Dropper.
7Suspension Clamp.
8Dead end Clamp.
9Eye Hook.
10Eye Hook Clamp.
11X-Arm Holding Clamp.
12Red Oxide Paint.
13Alluminium Paint.
14F-Bracket.
15PG Clamp
16Guarding Angle Clamp.
17Barbed Wire G.I.
18Stay Loop Insulator/Guy Insulator.
19Bolts, Nuts & Washers all sizes.
20L.T. Connector (Pearcing).
21GI Pipe 6\\" Dia
22HDPE Pipe 120mm.
23Safe carriage/cartage of following items from Store Centre, Sultanpur to work site including loading, unloading and proper stacking (distance within 0-50 Km.)
24Safe carriage of STP 09 Mtr. Long.
25Safe carriage of STP 11 Mtr. Long.
26Safe carriage of PCC Pole 8.5 Mtr. Long.
27Safe carriage of PCC Pole 09 Mtr. Long.
28Safe carriage of PCC Pole 11 Mtr. Long.
29Safe carriage of ACSR Weasel Conductor/Dog Conductor.
30Safe carriage of ACSR Rabbit Conductor.
31Safe carriage of 11 KV XLPE Cable Al. 3x70/3x120/3x185/3x240 sq.mm.
32Safe carriage of LT ABC 1 Phase/3 Phase.
33Safe carriage of Meter Qubical.
34Safe carriage of CT/PT Combinud Unit.
35Safe carriage of T/F 10/16/25 KVA.
36Safe carriage of T/F 63 KVA.
37Safe carriage of T/F 100 KVA.
38Safe carriage of T/F 250 KVA.
39Safe carriage of T/F 400 KVA.
40Safe carriage of Other Line Materials.
41Dragging of STP 09 Mtr. Long from site to pit point.
42Dragging of STP 11 Mtr. from site to pit point.
43Dragging of PCC Pole 8.5 Mtr. from site to pit point.
44Dragging of PCC Pole 09 Mtr. from site to pit point.
45Dragging of PCC Pole 11 Mtr. from site to pit point.
46Fabrication & erection of single pole support on ST Pole 09 Mtr. including digging of pit & fixing of all accessories and clamps including grouting & earthing of pole as per RESPO norms.
47Fabrication & erection of single pole support on ST Pole 11 Mtr. including digging of pit & fixing of all accessories and clamps including grouting & earthing of pole as per RESPO norms.
48Fabrication & erection of single pole support on PCC Pole 8.5 Mtr. including digging of pit & fixing of all accessories and clamps including grouting & earthing of pole as per RESPO norms.
49Fabrication & erection of double pole support on PCC Pole 8.5 Mtr. including digging of pit & fixing of all accessories and clamps including grouting & earthing of pole as per RESPO norms.
50Fabrication & erection of single pole support on PCC Pole 09 Mtr. including digging of pit & fixing of all accessories and clamps including grouting & earthing of pole as per RESPO norms.
51Fabrication & erection of double pole support on PCC Pole 09 Mtr. including digging of pit & fixing of all accessories and clamps including grouting & earthing of pole as per RESPO norms.
52Fabrication & erection of single pole support on PCC Pole 11 Mtr. including digging of pit & fixing of all accessories and clamps including grouting & earthing of pole as per RESPO norms.
53Fabrication & erection of double pole support on PCC Pole 11 Mtr. including digging of pit & fixing of all accessories and clamps including grouting & earthing of pole as per RESPO norms.
54Stay Complete With Concreating as per RESPO norms.
55Laying Stringing & sagging of New ACSR Weasel Conductor/Dog Conductor including binding jumpering etc as per RESPO norms.
56Laying Stringing & sagging of New ACSR Rabbit Conductor including binding jumpering etc as per RESPO norms.
57Digging of Trench & Laying of cable 11 KV XLPE cable 3x70/3x120/3x185/3x240 sq.mm including sands & brick as per RESPO norms.
58Laying of cable with HDD Method Using with HDPE Pipe (120mm OD PN-4 PE – 80 Grade UV stabilized HDPE pipe as per IS: 4984 of 6 metre) 11 KV XLPE Cable 3x70/3x120/3x185/3x240 sq.mm as per RESPO norms.
59Hanging Hosting & clamping and G.I. Pipe Channel nut & Bolts 3x70/3x120/3x185/3x240 sq.mm XLPE 11 KV Cable (Cost of all accessories will be borne by contractor) as per RESSPO Norms.
60Installation and Fixing of Heat Shrinkable Type HT Cable joiting Kit 3x70/3x120/3x185/3x240 sq mm XLPE Cable Box as per norms as per RESPO norms.
61High Pressure testing after completion of laying of HT XLPE cable, Fixing of joints & termination. (Testing equipment shall be arranged by the contractor) as per RESPO norms.
62Installation of Meter Qubical as per RESPO norms.
63Installation of CT/PT Combinud Unit as per RESPO norms.
64Route Cable Marker with size 3x1.5 feet stone for underground cable at every 100 mtr from initial point with Notice \\"High Voltage U/G Line\\" Painted on it (All the material, Manpower and T&P will be arranged by the contractor at his own cost) as per RESPO norms.
65Road Restoration Charges for Pucca Road Crossing as per RESPO norms.
66Road Restoration Charges for Footpath Side as per RESPO norms.
67Laying Stringing & sagging of LT ABC 1x95+1x16/3x50+1x35+1x16/1x25+1x16/1x16+1x35/3x95+1x70+1x16 sq.mm. as per RESPO norms.
68Erection and mounting of 10/16/25 KVA T/F. as per RESPO norms.
69Erection and mounting of 63 KVA T/F. as per RESPO norms.
70Erection and mounting of 100 KVA T/F. as per RESPO norms.
71Providing and installation of SMC Box for 25 KVA To 100 KVA. as per RESPO norms.
72Providing and installation of LT Bakelite Fuse Set for 10 KVA To 25 KVA. as per RESPO norms.
73Installation of 250/400 KVA T/F on plinth. as per RESPO norms.
74Construction of plinth for 250/400 KVA T/F including of all material with Specification the plinth construction requires a 150 mm concrete slab below the channel, with brickwork beneath it. The total height of the plinth should be 1200 mm. All configurations are as follows: 1500 mm*1500 mm*1200 mm as per RESPO norms.
75Fencing work suitable of 250/400 KVA T/F plinth of size 15x12x8 and angles of suitable size should be grouted on all 04 corners and 01 side for gate. Gate will also be constructed and Jali for fencing of size 1\\" of Burfi Shape as per RESPO norms.
76Supply and Installation of Tail less Fuse Unit 300/500 amp., Al. Lug 400 mm. & L- Clamp (Copper) with structure and associated work For 250/400 KVA Transformer as per RESPO norms.
77Work of wrapping of Plastic sheet around the ST Pole up to 2.5 meter hight form ground level (All the material, Manpower and T&P will be arranged by the contractor at his own cost). as per RESPO norms.
78Erection and Commissioning of Three Phase Distribution Box with help of clamps as per norms. (Cost of clamps, nut & bolts shall be borne by the contractor and Distribution Box Provided By Department). as per RESPO norms.
79Suply & Erection Danger Board (All the material, Manpower and T&P will be arranged by the contractor at his own cost). as per RESPO norms.
80Erection of Barbed Wire G.I. as per RESPO norms.
81Tree Branch Chopping. as per RESPO norms.
82Guarding Between poles. as per RESPO norms.
83Dismentalling of old conductor and ST Pole from HT/LT Line including cartage, loading unloading & proper stacking from work site to store center sultanpur. as per RESPO norms.
84Earthing of Transformer through earthing rod as per approved drawing including all requred manpower as per RESPO norms.
85Pipe Earthing of 250/400 KVA Transformer (By boring of 4 inch diameter 20 m deep, 40 mm diameter A class GI pipe is inserted to a depth of 20 m and a holed pipe of 1.5 m length is inserted at the bottom. Tighten one end of the MS strip of size 50x6mm with the nut bolt with the neutral of the converter and weld the other end with the GI pipe inserted in the boring for earthing. Putting a socket on the upper part of the pipe (mouth) so that water can be poured into it to retain moisture. To complete the work Contractor will provide all material, Manpower, T&P, safe carriage of material to worksite as per RESPO norms.
86Pipe Earthing of Meter Qubical (By boring of 4 inch diameter 20 m deep, 40 mm diameter A class GI pipe is inserted to a depth of 20 m and a holed pipe of 1.5 m length is inserted at the bottom. Tighten one end of the MS strip of size 50x6mm with the nut bolt with the neutral of the converter and weld the other end with the GI pipe inserted in the boring for earthing. Putting a socket on the upper part of the pipe (mouth) so that water can be poured into it to retain moisture. To complete the work Contractor will provide all material, Manpower, T&P, safe carriage of material to worksite as per RESPO norms.
87Providing and fixing & Crimping of Al. Lug required size. as per RESPO norms. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56385154
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 28.30 Lakhs
LAST DATE 16-07-2026
Authority
Authority Name Madhyanchal Vidut Vitran Nigam Limited
Work Description Tender for Running Contract For Deposit Works Under Edd-Baldirai, Sultanpur.
Basic Detail
Tender No 12/EDC(S)/2026-27
Bidding Type Tender
Location
City Sultanpur
State Uttar Pradesh
Key Dates
Publish Date 09 Jul 2026
Submission Date 16 Jul 2026
Open Date 16 Jul 2026
Finance
Tender Value 28.30 Lakhs
Tender Fee 3540
EMD 28500
Exemption Not Available
Document List
12.pdf
BOQ_2190839.xls
ca958d3c-ac9e-4e20-82fa-2226a20233f3.html
Tenderdocument.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 09, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 16, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 2 days
Jul 16, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 2 days

Tender Documents

Download All (ZIP) ↓
pdf

12.pdf

xls

BOQ_2190839.xls

html

ca958d3c-ac9e-4e20-82fa-2226a20233f3.html

pdf

Tenderdocument.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders