Youth Affairs and Sports and Culture Government Departments Closing in 18 days TDR #56384828

Tender For Development Of Stadium At Harmohalla Ranbirpora Anantnag

Issued by Government Departments · Srinagar, Jammu and Kashmir
Tender Value
59.21 Lakhs
Estimated cost
Bid Submission
29 Jul 2026
18 days left
EMD
1.18 Lakhs
Bank guarantee accepted
Document Fee
1500
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Srinagar → Jammu and Kashmir
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Development Of Stadium At Harmohalla Ranbirpora Anantnag

BOQ

Name of Work:- Development of stadium at Harmohalla Ranbirpora Anantnag
Sl. No. Item Description
1ExtensionEarthwork in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All Kinds of Soil
2Earthwork in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. ordinary rock
3Disposal of excavated earth by mechanical means beyond 50 metres and up to 1.00 kilometre lead. (Carriage by MT) incl dressing etc
4Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto1.5 m in -All kinds of soil.
5Consolidation of subgrade with power road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth and rerolling the subgrade.
6Breast Wall Earthwork in excavation by mechanical means in trenches for foundation including disposal of excavated earth lead 50 m , disposed earth to be leveled and neatly dressed in All kinds of Soil.
7P/L of stone soling hand packed,incl ramming with heavy rammer incl. all carriage upto site of work
8P/L in position cement concrete in foundation and plinth excluding the cost of centring and shuttering all work upto plinth level (1;4;8) stone aggregate 40 mm nominal size crushed aggregate (Including carriage )
9P/L in position cement concrete of specified grade excluding the cost of shuttering and centering , finishing all work upto plinth level 1:3:6grade (stone aggregate 20mm nominal size aggregate)
10Centring and shuttering incl strutting propping etc and removal of form work for foundation footing bases of columns
11P/F of PVC 100mm dia Weep holes in protection works laid at regular intervals for the entire width of wall as per the direction of engineer.
1212mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand)
13Providing and laying RCC spun pipes of approved diameter and class NP2, including all necessary earthwork in excavation, preparation and laying of cushion bedding over and around pipes, jointing, testing, backfilling, and carriage of all materials to site, complete in all respects as per specifications and directions of the Engineer-in-Charge. (450mm int. dia)
14Carriage of materials by M.T from source to site of work a) Sand for an average lead of 25 kms
15b sand and .stone agg for an average lead of 15 kms
16Net Practice Pitch Earth work in bulk excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan,including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :
17P/L of stone soling hand packed,incl ramming with heavy rammer incl. all carriage upto site of work
18P/L in position cement concrete in foundation and plinth excluding the cost of centring and shuttering all work upto plinth level (1;4;8) stone aggregate 40 mm nominal size crushed aggregate (Including carriage )
19P/L in position Reinfored cement concrete of specified grade excluding the cost of shuttering and centring finishing and reinforcement all work upto plinth level 1:1.5:3 Mix
20Steel reinforcement for RCC work incl straightening ,cutting, hoisting ,placing, in position all complete (TMT Bars incl. Carriage
21Steel work in built up tubular (round, square or rectangular hollow tubesetc.) trusses etc., including cutting , hoisting , fixing in position andapplying a priming coat of approved steel primer, including welding andbolted with special shaped washers etc. complete
22Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
23P/F of synthetic polythene twin thickness knotted net 3 mm guage and 50x50 mm mesh
24Carriage of materials by M.T from source to site of work a) Sand for an average lead of 25 kms
25Cricket competition PitchEarth work in bulk excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan,including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :
26Consolidation of pitch base to required gradient and X-section using Power Road Roller 8-10 Tonne Capacity to achieve the required density.
27Providing and laying of soling stone size on level (hand packed ) of size not more than 100mm incl. Consolidation with Power Road Roller 8-10 Tonne Capacity Complete and all types of carriages complete
28S/L of coarse sand incl. sieving of sand properly to remove any foreign substance and laying in layers not exceeding 50mm in depth and surface to be flooded with water incl. carriage of sand from near source
29S/L of sandy loom (mixture of fine sand and fine clay) in 1:10 ratio to be laid in layers not exceeding 50mm in depth and consolidation with 1/2 Tonne roller or plate vinrator complete.
30Supply and laying of Top layer of earth having highhest clay content available to be laid in layers not exceeding 50mm in depth and consolidation with 1/2 tonne roller or plate vibrator.
31P/fixing 15x15 feet cricket canvas sight screen and is moveable foldable with channel base with 4 special turf tyres allowing easy movement with color balck on one side of sight screen and white color on other side.
32SEATING TIEREarthwork in excavation by manual means in trenches for foundation drains pipes etc not exceeding 1.5mtr in width and not exceeding 10 sqm on plan depth upto 1.5mtr including backfilling of soil & disposal of excavated soil to be leveled and neatly dressed within 25mts lead.
33P/L stone soling hand packed incl ramming with heavy rammers all carriage upto site of work
34Providing and laying in position cement concrete in foundation and plinth excluding the cost of centring and shuttering all work upto plinth level .(1:4:8 ) stone aggregate 40mm nominal size aggregate
35Providing and laying in position specified grade of cement concrete excluding the cost of centering, shuttering, finishing all work upto plinth level in 1:2:4 (1 cement : 2coarse sand : 4graded stone aggregate 20mm nominal size)
36Centering & shuttering including strutting, propping etc. and removal of formwork etc Foundations, footings, bases for columns
37Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inposition and binding all complete upto plinth level Thermo-Mechanically Treated bars
38Structural Steel work welded in built up sections trusses and framed work, including cutting,hoisting, fixing in position and applying a priming coat of approved steelprimer using structural steel etc. as required
39Painting on steel work with synthetic enamel paint of approved brand and manufactureto give an even shade.
40Carriage of materials by M.T from source to site of work a) Sand and stone for an average lead of 15 kms Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56384828
AUTHORITY Government Departments
TENDER VALUE 59.21 Lakhs
LAST DATE 29-07-2026
Authority
Authority Name Jammu And Kashmir State Sports Council
Work Description Tender for Development Of Stadium At Harmohalla Ranbirpora Anantnag
Basic Detail
Tender No Nit 10 of 2026-27
Bidding Type Tender
Location
City Srinagar
State Jammu and Kashmir
Key Dates
Publish Date 09 Jul 2026
Submission Date 29 Jul 2026
Open Date 30 Jul 2026
Finance
Tender Value 59.21 Lakhs
Tender Fee 1500
EMD 1.18 Lakhs
Exemption Not Available
Document List
17839465-fedc-4bec-ad4d-3e1c8711cf9e.html
BOQ_1022400.xls
Tendernotice_1 (10).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 09, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 29, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 18 days
Jul 30, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 19 days

Tender Documents

Download All (ZIP) ↓
html

17839465-fedc-4bec-ad4d-3e1c8711cf9e.html

xls

BOQ_1022400.xls

pdf

Tendernotice_1 (10).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders