Tender For Fabrication & Replacement Of Pipelines In Offsite Area & Np Plant, Fact Cd
Tender Value
Ref. Documents
Estimated cost
Bid Submission
24 Jul 2026
0 days left
EMD
5000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Ernakulam → Kerala
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Fabrication & Replacement Of Pipelines In Offsite Area & Np Plant, Fact Cd
BOQ
| Sl. No. | Item Description |
| 1 | FABRICATION & REPLACEMENT OF PIPELINES IN OFFSITE AREA & NP PLANT, FACT CD |
| 2 | Fabrication of MS/CS pipelines in NP Plant and Offsite area.Work involves the fabrication of pipelines with necessary fittings to suit site conditions for the replacement of damaged pipelines, installation of new pipelines, and modification or rerouting of existing pipelines. The pipelines shall be fabricated using CS/MS materials for handling water, ammonia, fire hydrant, air, steam and other utilities. Upon receiving clearance to start the work, the contractor shall collect and transport the required materials, tools & tackles from the FACT - CD Stores or Main Workshop to the work site. Accurate site measurements must be taken by the contractor to ensure proper fitment during erection and fabrication work shall be carried out by the contractor with maximum utilization of straight pipe lengths to reduce wastage. Pipe fittings such as elbows, tees, reducers, and others shall be installed as per site requirements, and in cases of shortage or where special parts are required, the contractor shall fabricate the necessary fittings using the provided materials. All work shall be executed in compliance with relevant safety standards, company guidelines, and industry best practices, ensuring proper alignment, support, and secure installation throughout the scope of work. If any weld joint is found defective, it shall be rectified properly at no additional cost. Standard welding procedures shall be followed for all weld joints. Pipe sizes range from 15 NB to 300 NB. |
| 3 | Fabrication of pipe lines, bends, reducers, tees for rubber lining in NP Plant and Offsite area. Work involves the fabrication of pipelines, bends, reducers, tees, and other fittings to suit site conditions for the replacement of damaged pipelines, installation of new pipelines, and modification or rerouting of rubber-lined pipelines. The pipelines shall be fabricated using Carbon Steel (CS) or Mild Steel (MS) materials. Upon receiving clearance to commence work, the contractor shall collect and transport the required materials, tools, and tackles from the FACT-CD Stores or Main Workshop to the work site. Fabrication shall be carried out with maximum utilization of straight pipe lengths to minimize wastage. Pipe fittings such as elbows, tees, reducers, and other components shall be installed as per site requirements. In the event of a shortage or if special fittings are required, the contractor shall fabricate the necessary components using the materials provided. Standard welding procedures shall be followed for all weld joints. The joints shall be welded on both the inside and outside, and all edges and weld seams shall be ground properly to prepare the surfaces for rubber lining. If any weld joint is found defective, it shall be rectified by the contractor at no additional cost. Upon completion of fabrication, the items shall be transported to the rubber lining area. After rubber lining is completed, the items shall be transported to the NP Plant or Off-site area and stacked as per the instructions of the Technician/Officer-in-Charge. Pipe and fitting sizes range from 50 NB to 300 NB. Rubber lining is not included in the scope of this contract |
| 4 | Fabrication of SS pipelines in NP Plant.Work involves the fabrication of pipelines and nozzles with necessary fittings to suit site conditions for the replacement of damaged pipelines, installation of new pipelines, and modification or rerouting of existing pipelines. The pipelines and nozzles shall be fabricated using Stainless Steel (SS) material for handling acid, slurry, water, ammonia, fire hydrant, air, and other utility services. Upon receiving clearance to commence work, the contractor shall collect and transport the required materials, tools, and tackles from the FACT-CD Stores or Main Workshop to the work site. Accurate site measurements must be taken by the contractor to ensure proper fitment during erection. Fabrication work shall be carried out with maximum utilization of straight pipe lengths to minimize wastage. Pipe fittings such as elbows, tees, reducers, and others shall be installed as per site requirements, and in cases of shortage or where special parts are required, the contractor shall fabricate the necessary fittings using the provided materials. All fabrication and erection activities shall be carried out in compliance with applicable safety standards, company guidelines, and industry best practices, ensuring proper alignment, support, and secure installation. Standard welding procedures shall be followed for all weld joints. All joints shall be prepared properly, including cleaning, marking out, cutting, profiling, bevelling, grinding, aligning, fitting up, tack welding, chipping, and final full welding. If any weld joint is found defective, it shall be rectified by the contractor at no additional cost. Pipe sizes involved in this work range from 15 NB to 300 NB. |
| 5 | Erection / Replacement of MS /CS / SS pipelines, Flexible Hoses and Fittings in NP Plant and Offsite area. Work involves the transportation and erection or replacement of prefabricated pipelines/flexible hoses, including the support clamps, padplates, valves, flow meters, pressure gauges, and related fittings, at various locations, elevations, and pipe bridges. Upon receiving clearance to commence work, the contractor shall collect and transport the required materials, tools, and tackles from the FACT-CD Stores or Main Workshop to the work site. The contractor shall also transport the prefabricated pipelines/flexible hoses from the storage area to the erection site. The scope includes dismantling the damaged pipeline/flexible hose, removing old gaskets, cleaning the flange faces, erecting the new pipeline/flexible hose with new gaskets, positioning and aligning it without strain, securely fastening all bolts, and performing a leak test. If any joint is found defective during leak testing, it shall be rectified by the contractor at no additional cost. The dismantling and refixing of valves, flow meters, pressure gauges, and control valves associated with pipeline/flexible hose replacement are included in the scope of this contract. The provision and installation of blind dummies or slip plates to isolate the line during replacement or erection are also within the contractor’s scope. The contractor shall ensure that the pipeline/flexible hose is properly aligned and securely placed on the supports provided. The contractor shall fabricate and provide suitable pads and holding clamps as per the site requirements. Pipe sizes range from 15 NB to 300 NB. The damaged MSRL pipelines shall be transported to the PA Plant for rubber removal. Upon completion of rubber removal, the pipelines shall be transported back to the designated area. It is to be noted that rubber removal is not included in the scope of this contract. |
| 6 | Repair of Damaged MSRL/SS Pipelines in NP Plant and Offsite area. Work involves the repair of Carbon Steel (CS), Mild Steel (MS), and Stainless Steel (SS) pipelines, including bends, tees, reducers, and associated fittings. Upon receiving clearance to commence work, the contractor shall collect and transport the required materials, tools, and tackles from the FACT-CD Stores or Main Workshop to the work site. Damaged or thinned-out sections of the pipeline shall be cut and removed, followed by proper edge preparation. The replacement of the damaged portion shall be carried out by butt welding, in accordance with standard welding procedures. In the case of repairs to MSRL pipelines, once the patchwork is completed, the items shall be transported to the rubber lining area for rubber lining. After rubber lining is completed, the repaired items shall be transported to the NP Plant or Off-site area and stacked as per the instructions of the Engineer-in-Charge. It is to be noted that rubber lining is not included in the scope of this contract. |
| 7 | Fabrication & Erection of Pipe Supports in NP Plant and Offsite area. Work involves the fabrication of pipe supports to suit site conditions during the replacement of damaged pipelines, installation of new pipelines, and modification or rerouting of existing pipelines. Upon receiving clearance to start the work, the contractor shall collect and transport the required materials, tools & tackles from the FACT - CD Stores or Main Workshop to the work site. Accurate site measurements must be taken by the contractor to ensure proper fitment during erection and fabrication work shall be carried out by the contractor with maximum utilization of material to reduce wastage. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 09, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedJul 24, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
TodayJul 25, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 1 dayTender Documents