Drinking Water Supply and Sanitation Government Departments Closing in 7 days TDR #56379755

Tender For Providing And Applying Integral Crystalline Slurry Ofhydrophilic Treatment To The Rcc In Nature For Waterproofing Podiums, Structures Like Retaining Walls Of The Basement,Water Tanks, Roof Slabs, Prepared Reservior, Sewage & Water Treatment Pla

Issued by Government Departments · , Punjab
Tender Value
46500
Estimated cost
Bid Submission
17 Jul 2026
7 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Offline

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
→ Punjab
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Providing And Applying Integral Crystalline Slurry Ofhydrophilic Treatment To The Rcc In Nature For Waterproofing Podiums, Structures Like Retaining Walls Of The Basement,Water Tanks, Roof Slabs, Prepared Reservior, Sewage & Water Treatment Plant, Tunnels/Subway And Bridge Deck Etc., By Mixing In The Ratio Of 5:2 (5 Parts Integral Crystlline Slurry: 2 Parts Water) For Vertical Surfaces And 3:1 (3 Parts Integral Crystalline Slurry: 1 Part Water) For Horizontal Surfaces Brush. The And Material Applying The Same From Negative (Internal) Side With The Help Of Synthetic Fiber Reducing Ematerial Shall Meet The Requirements As Specified In Aci-212-3R-2010 I.E. By Premeability Of Concrete By More Than 90% Compared With W Control Concrete As Per Din 1048 And Resistant To 16 Bar Hydrostatic Pressure On Negative Side. The Crystalline Slurry Shall The Crystaltine Slurry Be Capable Of Self-Healing Of Cracks Up To A Width Of 0.50Mm. The Work Shall Be Carried Out All Complete As Per S Providing And Applying Integral Crystalline Slurry Of Hydrophilic In Nature For Waterproofing Treatment To The Rcc Structures Like Retaining Walls Of The Basement, Basement, Waterater Tanks, Roof Slabs, Podiums, Reservior, Sewage & Water Treatment Plant, Tunnels/Subway And Bridge Deck Etc., Prepared Vertical Surfaces By Mixing In The Ratio Of 5:2 (5 Parts Integralal Crystlline Crystline Slurry: Slurry: 22 Part Prts Water) For And 3:1 (3 Parts Integral Crystalline Slurry: 1 Part Water) For Horizontal Brush. Surfaces The And Applying The Same From Negative (Internal) Side With The Help Of Synthetic Fiber Material Shall Meet The Requirements Equirements Asas Specified In Aci-212-3R Reducing Premeability Of Specified In Aci-212-3R-2010 I.E. By Din 1048 And Concrete By More Than 90% Compared With Control Concreteeas As Pe Resistant To 16 Bar Hydrostatic Pressureon Negative Side. The Crystalline Slurry On Shall Out All Be Complete Capable Of Self-Healing Of Cracks Up To A Width Of 0.50Mm. The Work Shall Be Carried As Per Specification And The Direction Of The Engineer-In-Charge. Performance Shall The Product Carry Guarantee For 10 Years Against Any Leakage. For Horizontal Surface One Coat@ 1.10 Kg Per Sqm Providing And Applying Of Swellable Type Water Stop Ta Ick In Iinear Meter (Expansive In Nature ) For Construction Joints Treatments Of Rcc Structure Such As Raft Slab, Retaining Wall ,Water Coat Storage Of Required Tank And Primer At The Junction Of Raft Slab With The Retaining Wall Etc ,After Cleaning The Surface, Joint @ 3.78 Litre Per 240 For Running Swellable Water Stop Tape Tap Shall Shall Bebe Aapplled Throughout The Length Of The Meter.Over The Primed Surface Swellable Type Water Stop Tape Shall Engineer Be Placed.The In Work Shall Be Carried Out Aloo Complete As Perspecification And And The Direction Of The Charge .The Product Performance Shall Carry Gaurantee For 10 Years Agalnst Any Leakage

AI Tender Summary

OUR REF NO 56379755
AUTHORITY Government Departments
TENDER VALUE 46500
LAST DATE 17-07-2026
Authority
Authority Name water supply and sanitation department
Work Description Tender For Providing And Applying Integral Crystalline Slurry Ofhydrophilic Treatment To The Rcc In Nature For Waterproofing Podiums, Structures Like Retaining Walls Of The Basement,Water Tanks, Roof Slabs, Prepared Reservior, Sewage & Water Treatment Plant, Tunnels/Subway And Bridge Deck Etc., By Mixing In The Ratio Of 5:2 (5 Parts Integral Crystlline Slurry: 2 Parts Water) For Vertical Surfaces And 3:1 (3 Parts Integral Crystalline Slurry: 1 Part Water) For Horizontal Surfaces Brush. The And Material Applying The Same From Negative (Internal) Side With The Help Of Synthetic Fiber Reducing Ematerial Shall Meet The Requirements As Specified In Aci-212-3R-2010 I.E. By Premeability Of Concrete By More Than 90% Compared With W Control Concrete As Per Din 1048 And Resistant To 16 Bar Hydrostatic Pressure On Negative Side. The Crystalline Slurry Shall The Crystaltine Slurry Be Capable Of Self-Healing Of Cracks Up To A Width Of 0.50Mm. The Work Shall Be Carried Out All Complete As Per S Providing And Applying Integral Crystalline Slurry Of Hydrophilic In Nature For Waterproofing Treatment To The Rcc Structures Like Retaining Walls Of The Basement, Basement, Waterater Tanks, Roof Slabs, Podiums, Reservior, Sewage & Water Treatment Plant, Tunnels/Subway And Bridge Deck Etc., Prepared Vertical Surfaces By Mixing In The Ratio Of 5:2 (5 Parts Integralal Crystlline Crystline Slurry: Slurry: 22 Part Prts Water) For And 3:1 (3 Parts Integral Crystalline Slurry: 1 Part Water) For Horizontal Brush. Surfaces The And Applying The Same From Negative (Internal) Side With The Help Of Synthetic Fiber Material Shall Meet The Requirements Equirements Asas Specified In Aci-212-3R Reducing Premeability Of Specified In Aci-212-3R-2010 I.E. By Din 1048 And Concrete By More Than 90% Compared With Control Concreteeas As Pe Resistant To 16 Bar Hydrostatic Pressureon Negative Side. The Crystalline Slurry On Shall Out All Be Complete Capable Of Self-Healing Of Cracks Up To A Width Of 0.50Mm. The Work Shall Be Carried As Per Specification And The Direction Of The Engineer-In-Charge. Performance Shall The Product Carry Guarantee For 10 Years Against Any Leakage. For Horizontal Surface One Coat@ 1.10 Kg Per Sqm Providing And Applying Of Swellable Type Water Stop Ta Ick In Iinear Meter (Expansive In Nature ) For Construction Joints Treatments Of Rcc Structure Such As Raft Slab, Retaining Wall ,Water Coat Storage Of Required Tank And Primer At The Junction Of Raft Slab With The Retaining Wall Etc ,After Cleaning The Surface, Joint @ 3.78 Litre Per 240 For Running Swellable Water Stop Tape Tap Shall Shall Bebe Aapplled Throughout The Length Of The Meter.Over The Primed Surface Swellable Type Water Stop Tape Shall Engineer Be Placed.The In Work Shall Be Carried Out Aloo Complete As Perspecification And And The Direction Of The Charge .The Product Performance Shall Carry Gaurantee For 10 Years Agalnst Any Leakage
Basic Detail
Tender No
Bidding Type Tender
Location
City
State Punjab
Key Dates
Publish Date 09 Jul 2026
Submission Date 17 Jul 2026
Open Date 01 Jan 0001
Finance
Tender Value 46500
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
e20bc642-670e-4839-af9e-9032f4ed78f9.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 09, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 17, 2026
17:00 IST

Bid Submission Deadline

Offline submission at the designated office.

Upcoming · 7 days

Tender Documents

Download All (ZIP) ↓
pdf

e20bc642-670e-4839-af9e-9032f4ed78f9.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders