Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard Ins Imphal; Irc For Repair, Maintenance / Overhauling Of Boat Davits Fitted Onboard Ins Imphal; Service Provider - Serviceability Checks Of
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard Ins Imphal; Irc For Repair, Maintenance / Overhauling Of Boat Davits Fitted Onboard Ins Imphal; Service Provider - Serviceability Checks Of Pd Pump. , Di /Dr On Luffing Cylinders View Jerky Movement Observed During Opration , Renewal Of Return Line Fillter. , Minor Leakages In Systems Pipelines And Stbd Luffing Cylinder. , Purging Of Hpu Oil. , Emergency Engine Of Boat Davit Not Starting, To Be Repaired. , Oil Leakage In Stbd Slew Gear. , Di /Dr On Luffing Cylinders View Jerky Movement Observed During Opration , Renewal Of Return Line Fillter. , Purging Of Hpu Oil. , Serviceability Checks Of Pd Pump. , Minor Leakages In Systems Pipelines. , Emergency Engine Of Boat Davit Not Starting, To Be Repaired. , Serviceability Checks Of Pd Pump. , Di /Dr On Luffing Cylinders View Abnormal Noise Observed During Opration. , Renewal Of Return Line Fillter. , Purging Of Hpu Oil. , Di /Dr On Pvg To Be Taken View Leakage Observes. , Minor Leakages In Systems Pipelines. , Emergency Engine Of Boat Davit Not Starting, To Be Repaired. , Plc Of The Control Panel Not Working, To Be Renewed. , New Plc To Be Programmed As Per Drawings. , Panel Cabling Found Disturbed, New Cable To Be Laid As Per Drawing/ Re-Wring To Be Done. , Repairs/ Refurbishment/ Replacement Of Following In Control Panel - (I) Contractors, (Ii) Limit Switch, & (Iii) Smps , Solenoid Valve Coil To Be Repaired/ Valve To Be Replaced , Remote Joystick, Selector Switch And Cabling Of Remote Panel To Be Repaired. , Covers Of Panel Found Damaged/ Broken, To Be Repaired.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Serviceability checks of PD pump. | Serviceability checks of PD pump. |
| 2 | DI /DR on luffing cylinders view jerky movement observed during opration | DI /DR on luffing cylinders view jerky movement observed during opration |
| 3 | Renewal of return line fillter. | Renewal of return line fillter. |
| 4 | minor leakages in systems pipelines and Stbd luffing cylinder. | minor leakages in systems pipelines and Stbd luffing cylinder. |
| 5 | Purging of HPU oil. | Purging of HPU oil. |
| 6 | Emergency Engine of Boat Davit Not starting, to be repaired. | Emergency Engine of Boat Davit Not starting, to be repaired. |
| 7 | Oil leakage in Stbd slew gear. | Oil leakage in Stbd slew gear. |
| 8 | DI /DR on luffing cylinders view jerky movement observed during opration | DI /DR on luffing cylinders view jerky movement observed during opration |
| 9 | Renewal of return line fillter. | Renewal of return line fillter. |
| 10 | Purging of HPU oil. | Purging of HPU oil. |
| 11 | Serviceability checks of PD pump. | Serviceability checks of PD pump. |
| 12 | minor leakages in systems pipelines. | minor leakages in systems pipelines. |
| 13 | Emergency Engine of Boat Davit Not starting, to be repaired. | Emergency Engine of Boat Davit Not starting, to be repaired. |
| 14 | Serviceability checks of PD pump. | Serviceability checks of PD pump. |
| 15 | DI /DR on luffing cylinders view abnormal noise observed during opration. | DI /DR on luffing cylinders view abnormal noise observed during opration. |
| 16 | Renewal of return line fillter. | Renewal of return line fillter. |
| 17 | Purging of HPU oil. | Purging of HPU oil. |
| 18 | DI /DR on PVG to be taken view leakage observes. | DI /DR on PVG to be taken view leakage observes. |
| 19 | minor leakages in systems pipelines. | minor leakages in systems pipelines. |
| 20 | Emergency Engine of Boat Davit Not starting, to be repaired. | Emergency Engine of Boat Davit Not starting, to be repaired. |
| 21 | PLC of the control Panel not working, to be renewed. | PLC of the control Panel not working, to be renewed. |
| 22 | New PLC to be programmed as per drawings. | New PLC to be programmed as per drawings. |
| 23 | Panel cabling found disturbed, new cable to be laid as per drawing/ re-wring to be done. | Panel cabling found disturbed, new cable to be laid as per drawing/ re-wring to be done. |
| 24 | Repairs/ Refurbishment/ replacement of following in control panel - (i) Contractors, (ii) Limit Switch, & (iii) SMPS | Repairs/ Refurbishment/ replacement of following in control panel - (i) Contractors, (ii) Limit Switch, & (iii) SMPS |
| 25 | Solenoid valve coil to be repaired/ valve to be replaced | Solenoid valve coil to be repaired/ valve to be replaced |
| 26 | remote Joystick, Selector Switch and cabling of remote panel to be repaired. | remote Joystick, Selector Switch and cabling of remote panel to be repaired. |
| 27 | Covers of panel found damaged/ broken, to be repaired. | Covers of panel found damaged/ broken, to be repaired. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender