Power Boards / Undertakings / PSU Closing in 14 days TDR #56360391

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Thermal Power Plant; Insulation, Refractory Works, Removal Of Accumulated Fly Ash From Inside The Heating Surface And Other Areas Of Boiler And Thei

Issued by Boards / Undertakings / PSU · Sonbhadra, Uttar Pradesh
Tender Value
16.82 Lakhs
Estimated cost
Bid Submission
23 Jul 2026
14 days left
EMD
34000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Sonbhadra → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Thermal Power Plant; Insulation, Refractory Works, Removal Of Accumulated Fly Ash From Inside The Heating Surface And Other Areas Of Boiler And Their Disposal From Boile.. - Complete Insulation Of Pipelines, Pressure Parts Main Boier, Esp, Ducts And Other Associated Equipments Of 2X500 Mw Boiler When New Cladding To Be Provided With 20-24 Gauges (G.I.)/Aluminium Sheet Shall Be Provided By The Department Free Of Cost). Work Includes Fabrication And Fixing Of Cladding Structure One Layer Of Mineral Wool Blankets/Pads Or Calcium Silicate Pipe Section Of Thickness 40/50/60 Mm, Are Provided/Fixed At Site. , Complete Insulation Of Pipelines, Pressure Parts Main Boier, Esp, Ducts And Other Associated Equipments Of 2X500 Mw Boiler When New Cladding To Be Provided With 20-24 Gauges (G.I.)/Aluminium Sheet Shall Be Provided By The Department Free Of Cost). Work Includes Fabrication And Fixing Of Cladding Structure More Than One Layer Of Mineral Wool Blankets/Pads Or Calcium Silicate Pipe Section Of Thickness 40/50/60 Mm, Are Provided/Fixed At Site. , Complete Insulation Of Pipelines, Pressure Parts Main Boier, Esp, Ducts And Other Associated Equipments Of 2X500 Mw Boiler When Old/Removed Cladding Sheets To Be Fixed With The Help Of Self Tapping Screw, Complete Insulation Of Pipelines, Pressure Parts Main Boier, Esp, Ducts And Other Associated Equipments Of 2X500 Mw Boiler When One Layer Of Mineral Wool Blankets/Pads Or Calcium Silicate Pipe Section Of Thickness 40/50/60 Mm, Are Provided Or The Old/Removed But Usable Are Provided/Fixed At Site. , Complete Insulation Of Pipelines, Pressure Parts Main Boier, Esp, Ducts And Other Associated Equipments Of 2X500 Mw Boiler When Old/Removed Cladding To Be Provided With 20-24 Gauges (G.I.)/Aluminium Sheet Shall Be Provided By The Department Free Of Cost). Work Includes Fabrication And Fixing Of Cladding Structure More Than One Layer Of Mineral Wool Blankets/Pads Or Calcium Silicate Pipe Section Of Thickness 40/50/60 Mm, Are Provided Or The Old/Removed But Usable Are Provided/Fixed At Site. , Insulation Of Headers In Pent House/Outside, When More Than One Layer Of Mineral Wool/Blankets/Pads Of Thickness 40/50/60 Mm, Are Provided/Fixed On The Headers In Pent House. Work Involved Are As Under: (A) Dismantling Of Old Damaged Insulating Materials And Shifting The Same To Dumping Yard. (B) Transportation Of New Mineral Wool Blanket/Pads From Central Store To Site Store And Thereafter To 80Mtr. Of Boiler Elevation. (C) Fixing Of Mineral Wool Blankets/Pads And Stitching The Same With G.I. /M.S. /S.S. Wire Holding The Insulation Materials On The Header, Mineral Wool/Winding Wire Etc. Shall Be Provided By The Department Free Of Cost. , Application Of Mineral Wool Blankets/Pads And Fixing With G.I. Wire On H.P. /L.P. Valves Of Boiler. Application Of Insulating Powder, Hard Lag/ Mastic Compound & Finishing/Cladding With G.I./Aluminium Sheets Of 20-24 Gauge Wherever Required As Per Site Requirement Or As Instructed. , Application Of Castable Refractory In Main Boiler/ Pressure Parts Heating Zones. Work Involved Are As Under: (A) Removal Of Old And Damaged Refractory By Chipping Out, Collecting And Shifting The Same To Dumping Yard Or As Instructed. (B) Welding Of S.S. /M.S. Pegs Of Required Size For Reinforcement At Required Distance And Casting New Refractory. Manpower For Transportation The Refractory Materials From Central Stores To Work Site Shall Be Provided By The Contractor. , Application Of Plastic Refractory On Burner Panel Zone , Cleaning And Removal Of Fly Ash/Foreign Materials/Debris Etc. And Their Disposal To Dumping Yard From The Primary Super Heater Chamber Inside The Boiler. , Cleaning And Removal Of Fly Ash/Foreign Materials/Debris Etc. And Their Disposal To Dumping Yard From Economizer Chamber Inside The Boiler , Cleaning And Removal Of Fly Ash/Foreign Materials/Debris Etc. And Their Disposal To Dumping Yard From Gallery Between Re-Heaters And Arch Tube Inside The Boiler. , Cleaning And Removal Of Fly Ash/Foreign Materials/Debris Etc. And Their Disposal To Dumping Yard From Gallery Between Re-Heaters And Arch Tube Inside The Boiler. , Cleaning And Removal Of Fly Ash/Foreign Materials/Debris Etc. And Their Disposal To Dumping Yard From Gallery Between Tertiary Super Heater And Secondary Re-Heater In Pent House. . , Cleaning And Removal Of Fly Ash/Foreign Materials/Debris Etc. And Their Disposal To Dumping Yard From Gallery Between Tertiary Super Heater And Secondary Re-Heater In Pent House. , Cleaning And Removal Of Fly Ash/Foreign Materials/Debris Etc. And Their Disposal To Dumping Yard From Gallery Between Tertiary Re-Heater And Final Super Heater In Pent House. , Cleaning And Removal Of Fly Ash/Foreign Materials/Debris Etc. And Their Disposal To Dumping Yard From Gallery Between Final Super Heater And Primary Super Heater Headers In Pent House. , Cleaning And Removal Of Fly Ash//Foreign Materials/Debris Etc. And Their Disposal To Dumping Yard From Hot Secondary Air Duct From Aph To Wind Box (Left) , Cleaning And Removal Of Fly Ash//Foreign Materials/Debris Etc. And Their Disposal To Dumping Yard From Hot Secondary Air Duct. From Aph To Wind Box (Right) , Cleaning And Removal Of Fly Ash//Foreign Materials/Debris Etc. And Their Disposal To Dumping Yard From Boiler Furnace Wind Box (Left) , Cleaning And Removal Of Fly Ash//Foreign Materials/Debris Etc. And Their Disposal To Dumping Yard From Boiler Furnace Wind Box (Right) , Cleaning And Removal Of Fly Ash//Foreign Materials/Debris Etc. And Their Disposal To Dumping Yard From Interconnecting Duct Of Hot Secondary Air. , Cleaning And Removal Of Fly Ash//Foreign Materials/Debris Etc. And Their Disposal To Dumping Yard From Inlet D Er To Outlet D Er Of Air And Flue Gas Duct Of Primary Aph Including Aph. , Cleaning And Removal Of Fly Ash//Foreign Materials/Debris Etc. And Their Disposal To Dumping Yard From Inlet D Er To Outlet D Er Of Air And Flue Gas Duct Of Secondary Aph Including Aph. , Cleaning And Removal Of Fly Ash/Foreign Materials/Debris/Garbage/Pigeon Shits Etc. From Pent House Roof Of Boiler By Sweeping With Hard Broom/Wire Brush And Their Disposal To Dumping Yard. , Cleaning/Sweeping And Removal Of Fly Ash/Foreign Materials/Debris/Garbage Etc. From Dog House Of Boiler And Their Disposal To Dumping Yard. , Cleaning And Removal Of Fly Ash/Foreign Materials/Debris/Garbage Etc. From S-Panel Of Boiler And Their Disposal To Dumping Yard. , Cleaning And Removal Of Fly Ash/Foreign Materials/Debris/Garbage/Pigeon Shits Etc. From Buck Stay Of First And Second Pass Of Boiler From 11Mtr To 80Mtr And Sweeping With Hard Broom/Wire Brush And Their Disposal To Dumping Yard. , Repairing /Replacement Of Bulged/Damaged Skin Casing At Different Section In Pent House 1St/2Nd Pass After Removal By Cutting And Releasing From High Crown Plates Expansion Bellows, Straightening And Refixing By High Pressure Welding In 2X500 Mw Boiler Of Btps, Anpara. Work Involved Are As Under: (A) Cutting Of Elephant Door At Boiler Drum Level In Pent House After Cutting Outer Cladding And Removal Of Insulation. (B) Cutting Of Bulged/Damaged Skin Casing Plates By Grinder/Gas Cutting Set With Utmost Precaution Ensuring No Damage To The Boiler Pressure Parts Tubes And Expansion Joints Inside The Pent House. (C) Removal Of Damaged Skin Casing After Cutting To Outside Pent House At Boiler Drum Floor. (D) Skin Casing To Be Cut In Full Segment Length, Not In Small Pieces. (E) Care Should Be Taken Of Expansion Joints, Pressure Parts Tubes Sling Holes Provided In Pent House For Sky Climber Rope, While Cutting The Damaged Skin Casing. (F) Straightening Of Damaged Skin Casing By Gas Heating Process And Pressing With Jacks/Hammers (G) Removal Of Refractory Beneath Skin Casing Above Roof Tubes For Inspection Of Peg Fins, Roof Tubes And High Crown. Any Defect Observed In Roof Tubes, High Crown Or Pendent Panels Should Be Identified And Got Inspected By The Engineer In-Charge. Repair Of Peg Fins And High Crown Should Be Carried Out By High Pressure Welding Strictly In Accordance To Ibr. (H) Providing New Refractory And Curing The Same, Allowing At Least 24 Hrs. To Set. (I) Welding Of Skin Casing And Sector Beam After Refractory Work Is Over. (J) Skin Casing Should Be Welded By High Pressure Sequence Welding Technique As Per Ibr With Supratherm (Spl) Electrode And Ensure To Be Leak Proof. (K) Closing Of Elephant Door By Welding After Completion Of Work.

BOQ

Sl. No. Item TitleItem Description
1Complete Insulation of Pipelines, pressure parts main boier, ESP, ducts and other associated equipments of 2X500 MW Boiler when new cladding to be provided with 20-24 gauges (G.I.)/Aluminium sheet shall be provided by the department free of cost). Work includes fabrication and fixing of cladding structure one layer of mineral wool blankets/pads or calcium silicate pipe section of thickness 40/50/60 mm, are provided/fixed at site.Complete Insulation of Pipelines, pressure parts main boier, ESP, ducts and other associated equipments of 2X500 MW Boiler when new cladding to be provided with 20-24 gauges (G.I.)/Aluminium sheet shall be provided by the department free of cost). Work includes fabrication and fixing of cladding structure one layer of mineral wool blankets/pads or calcium silicate pipe section of thickness 40/50/60 mm, are provided/fixed at site.
2Complete Insulation of Pipelines, pressure parts main boier, ESP, ducts and other associated equipments of 2X500 MW Boiler when new cladding to be provided with 20-24 gauges (G.I.)/Aluminium sheet shall be provided by the department free of cost). Work includes fabrication and fixing of cladding structure more than one layer of mineral wool blankets/pads or calcium silicate pipe section of thickness 40/50/60 mm, are provided/fixed at site.Complete Insulation of Pipelines, pressure parts main boier, ESP, ducts and other associated equipments of 2X500 MW Boiler when new cladding to be provided with 20-24 gauges (G.I.)/Aluminium sheet shall be provided by the department free of cost). Work includes fabrication and fixing of cladding structure more than one layer of mineral wool blankets/pads or calcium silicate pipe section of thickness 40/50/60 mm, are provided/fixed at site.
3Complete Insulation of Pipelines, pressure parts main boier, ESP, ducts and other associated equipments of 2X500 MW Boiler when old/removed cladding sheets to be fixed with the help of self tapping screw, Complete Insulation of Pipelines, pressure parts main boier, ESP, ducts and other associated equipments of 2X500 MW Boiler when one layer of mineral wool blankets/pads or calcium silicate pipe section of thickness 40/50/60 mm, are provided or the old/removed but usable are provided/fixed at site.Complete Insulation of Pipelines, pressure parts main boier, ESP, ducts and other associated equipments of 2X500 MW Boiler when old/removed cladding sheets to be fixed with the help of self tapping screw, Complete Insulation of Pipelines, pressure parts main boier, ESP, ducts and other associated equipments of 2X500 MW Boiler when one layer of mineral wool blankets/pads or calcium silicate pipe section of thickness 40/50/60 mm, are provided or the old/removed but usable are provided/fixed at site.
4Complete Insulation of Pipelines, pressure parts main boier, ESP, ducts and other associated equipments of 2X500 MW Boiler when old/removed cladding to be provided with 20-24 gauges (G.I.)/Aluminium sheet shall be provided by the department free of cost). Work includes fabrication and fixing of cladding structure more than one layer of mineral wool blankets/pads or calcium silicate pipe section of thickness 40/50/60 mm, are provided or the old/removed but usable are provided/fixed at site.Complete Insulation of Pipelines, pressure parts main boier, ESP, ducts and other associated equipments of 2X500 MW Boiler when old/removed cladding to be provided with 20-24 gauges (G.I.)/Aluminium sheet shall be provided by the department free of cost). Work includes fabrication and fixing of cladding structure more than one layer of mineral wool blankets/pads or calcium silicate pipe section of thickness 40/50/60 mm, are provided or the old/removed but usable are provided/fixed at site.
5Insulation of headers in pent house/outside, when more than one layer of mineral wool/blankets/pads of thickness 40/50/60 mm, are provided/fixed on the headers in pent house. Work involved are as under: (a) Dismantling of old damaged insulating materials and shifting the same to dumping yard. (b) Transportation of new mineral wool blanket/pads from central store to site store and thereafter to 80mtr. of Boiler elevation. (c) Fixing of mineral wool blankets/pads and stitching the same with G.I. /M.S. /S.S. wire holding the insulation materials on the header, Mineral wool/winding wire etc. shall be provided by the department free of cost.Insulation of headers in pent house/outside, when more than one layer of mineral wool/blankets/pads of thickness 40/50/60 mm, are provided/fixed on the headers in pent house. Work involved are as under: (a) Dismantling of old damaged insulating materials and shifting the same to dumping yard. (b) Transportation of new mineral wool blanket/pads from central store to site store and thereafter to 80mtr. of Boiler elevation. (c) Fixing of mineral wool blankets/pads and stitching the same with G.I. /M.S. /S.S. wire holding the insulation materials on the header, Mineral wool/winding wire etc. shall be provided by the department free of cost.
6Application of mineral wool blankets/pads and fixing with G.I. Wire on H.P. /L.P. Valves of boiler. Application of insulating powder, hard lag/ mastic compound & finishing/cladding with G.I./Aluminium sheets of 20-24 gauge wherever required as per site requirement or as instructed.Application of mineral wool blankets/pads and fixing with G.I. Wire on H.P. /L.P. Valves of boiler. Application of insulating powder, hard lag/ mastic compound & finishing/cladding with G.I./Aluminium sheets of 20-24 gauge wherever required as per site requirement or as instructed.
7Application of Castable refractory in main boiler/ pressure parts heating zones. Work involved are as under: (a) Removal of old and damaged refractory by chipping out, collecting and shifting the same to dumping yard or as instructed. (b) Welding of S.S. /M.S. pegs of required size for reinforcement at required distance and casting new refractory. Manpower for transportation the refractory materials from central stores to work site shall be provided by the contractor.Application of Castable refractory in main boiler/ pressure parts heating zones. Work involved are as under: (a) Removal of old and damaged refractory by chipping out, collecting and shifting the same to dumping yard or as instructed. (b) Welding of S.S. /M.S. pegs of required size for reinforcement at required distance and casting new refractory. Manpower for transportation the refractory materials from central stores to work site shall be provided by the contractor.
8Application of Plastic refractory on Burner Panel ZoneApplication of Plastic refractory on Burner Panel Zone
9Cleaning and removal of fly ash/foreign materials/debris etc. and their disposal to dumping yard from the primary super heater chamber inside the boiler.Cleaning and removal of fly ash/foreign materials/debris etc. and their disposal to dumping yard from the primary super heater chamber inside the boiler.
10Cleaning and removal of fly ash/foreign materials/debris etc. and their disposal to dumping yard from Economizer chamber inside the boilerCleaning and removal of fly ash/foreign materials/debris etc. and their disposal to dumping yard from Economizer chamber inside the boiler
11Cleaning and removal of fly ash/foreign materials/debris etc. and their disposal to dumping yard from gallery between re-heaters and arch tube inside the boiler.Cleaning and removal of fly ash/foreign materials/debris etc. and their disposal to dumping yard from gallery between re-heaters and arch tube inside the boiler.
12Cleaning and removal of fly ash/foreign materials/debris etc. and their disposal to dumping yard from gallery between re-heaters and arch tube inside the boiler.Cleaning and removal of fly ash/foreign materials/debris etc. and their disposal to dumping yard from gallery between re-heaters and arch tube inside the boiler.
13Cleaning and removal of fly ash/foreign materials/debris etc. and their disposal to dumping yard from gallery between tertiary super heater and secondary re-heater in pent house. .Cleaning and removal of fly ash/foreign materials/debris etc. and their disposal to dumping yard from gallery between tertiary super heater and secondary re-heater in pent house. .
14Cleaning and removal of fly ash/foreign materials/debris etc. and their disposal to dumping yard from gallery between tertiary super heater and secondary re-heater in pent house.Cleaning and removal of fly ash/foreign materials/debris etc. and their disposal to dumping yard from gallery between tertiary super heater and secondary re-heater in pent house.
15Cleaning and removal of fly ash/foreign materials/debris etc. and their disposal to dumping yard from gallery between tertiary re-heater and final super heater in pent house.Cleaning and removal of fly ash/foreign materials/debris etc. and their disposal to dumping yard from gallery between tertiary re-heater and final super heater in pent house.
16Cleaning and removal of fly ash/foreign materials/debris etc. and their disposal to dumping yard from gallery between final super heater and primary super heater headers in pent house.Cleaning and removal of fly ash/foreign materials/debris etc. and their disposal to dumping yard from gallery between final super heater and primary super heater headers in pent house.
17Cleaning and removal of fly ash//foreign materials/debris etc. and their disposal to dumping yard from Hot secondary air duct from APH to wind box (left)Cleaning and removal of fly ash//foreign materials/debris etc. and their disposal to dumping yard from Hot secondary air duct from APH to wind box (left)
18Cleaning and removal of fly ash//foreign materials/debris etc. and their disposal to dumping yard from Hot secondary air duct. from APH to wind box (right)Cleaning and removal of fly ash//foreign materials/debris etc. and their disposal to dumping yard from Hot secondary air duct. from APH to wind box (right)
19Cleaning and removal of fly ash//foreign materials/debris etc. and their disposal to dumping yard from Boiler furnace wind box (left)Cleaning and removal of fly ash//foreign materials/debris etc. and their disposal to dumping yard from Boiler furnace wind box (left)
20Cleaning and removal of fly ash//foreign materials/debris etc. and their disposal to dumping yard from Boiler furnace wind box (right)Cleaning and removal of fly ash//foreign materials/debris etc. and their disposal to dumping yard from Boiler furnace wind box (right)
21Cleaning and removal of fly ash//foreign materials/debris etc. and their disposal to dumping yard from Interconnecting duct of hot secondary air.Cleaning and removal of fly ash//foreign materials/debris etc. and their disposal to dumping yard from Interconnecting duct of hot secondary air.
22Cleaning and removal of fly ash//foreign materials/debris etc. and their disposal to dumping yard from inlet damper to outlet damper of air and flue gas duct of primary APH including APH.Cleaning and removal of fly ash//foreign materials/debris etc. and their disposal to dumping yard from inlet damper to outlet damper of air and flue gas duct of primary APH including APH.
23Cleaning and removal of fly ash//foreign materials/debris etc. and their disposal to dumping yard from inlet damper to outlet damper of air and flue gas duct of secondary APH including APH.Cleaning and removal of fly ash//foreign materials/debris etc. and their disposal to dumping yard from inlet damper to outlet damper of air and flue gas duct of secondary APH including APH.
24Cleaning and removal of fly ash/foreign materials/debris/garbage/pigeon shits etc. From pent house roof of boiler by sweeping with hard broom/wire brush and their disposal to dumping yard.Cleaning and removal of fly ash/foreign materials/debris/garbage/pigeon shits etc. From pent house roof of boiler by sweeping with hard broom/wire brush and their disposal to dumping yard.
25Cleaning/sweeping and removal of fly ash/foreign materials/debris/garbage etc. from dog house of boiler and their disposal to dumping yard.Cleaning/sweeping and removal of fly ash/foreign materials/debris/garbage etc. from dog house of boiler and their disposal to dumping yard.
26Cleaning and removal of fly ash/foreign materials/debris/garbage etc. From S-panel of boiler and their disposal to dumping yard.Cleaning and removal of fly ash/foreign materials/debris/garbage etc. From S-panel of boiler and their disposal to dumping yard.
27Cleaning and removal of fly ash/foreign materials/debris/garbage/pigeon shits etc. from buck stay of first and second pass of boiler from 11mtr to 80mtr and sweeping with hard broom/wire brush and their disposal to dumping yard.Cleaning and removal of fly ash/foreign materials/debris/garbage/pigeon shits etc. from buck stay of first and second pass of boiler from 11mtr to 80mtr and sweeping with hard broom/wire brush and their disposal to dumping yard.
28Repairing /replacement of bulged/damaged skin casing at different section in pent house 1st/2nd pass after removal by cutting and releasing from High Crown plates expansion bellows, straightening and refixing by high pressure welding in 2x500 MW Boiler of BTPS, Anpara. Work involved are as under: (a) Cutting of elephant door at Boiler drum level in pent house after cutting outer cladding and removal of insulation. (b) Cutting of bulged/damaged skin casing plates by grinder/gas cutting set with utmost precaution ensuring no damage to the boiler pressure parts tubes and expansion joints inside the pent house. (c) Removal of damaged skin casing after cutting to outside pent house at boiler drum floor. (d) Skin casing to be cut in full segment length, not in small pieces. (e) Care should be taken of expansion joints, pressure parts tubes sling holes provided in pent house for sky climber rope, while cutting the damaged skin casing. (f) Straightening of damaged skin casing by gas heating process and pressing with jacks/hammers (g) Removal of refractory beneath skin casing above roof tubes for inspection of peg fins, roof tubes and high crown. Any defect observed in roof tubes, high crown or pendent panels should be identified and got inspected by the Engineer In-charge. Repair of peg fins and high crown should be carried out by high pressure welding strictly in accordance to IBR. (h) Providing new refractory and curing the same, allowing at least 24 hrs. to set. (i) Welding of skin casing and sector beam after refractory work is over. (j) Skin casing should be welded by high pressure sequence welding technique as per IBR with Supratherm (spl) electrode and ensure to be leak proof. (k) Closing of elephant door by welding after completion of work.Repairing /replacement of bulged/damaged skin casing at different section in pent house 1st/2nd pass after removal by cutting and releasing from High Crown plates expansion bellows, straightening and refixing by high pressure welding in 2x500 MW Boiler of BTPS, Anpara. Work involved are as under: (a) Cutting of elephant door at Boiler drum level in pent house after cutting outer cladding and removal of insulation. (b) Cutting of bulged/damaged skin casing plates by grinder/gas cutting set with utmost precaution ensuring no damage to the boiler pressure parts tubes and expansion joints inside the pent house. (c) Removal of damaged skin casing after cutting to outside pent house at boiler drum floor. (d) Skin casing to be cut in full segment length, not in small pieces. (e) Care should be taken of expansion joints, pressure parts tubes sling holes provided in pent house for sky climber rope, while cutting the damaged skin casing. (f) Straightening of damaged skin casing by gas heating process and pressing with jacks/hammers (g) Removal of refractory beneath skin casing above roof tubes for inspection of peg fins, roof tubes and high crown. Any defect observed in roof tubes, high crown or pendent panels should be identified and got inspected by the Engineer In-charge. Repair of peg fins and high crown should be carried out by high pressure welding strictly in accordance to IBR. (h) Providing new refractory and curing the same, allowing at least 24 hrs. to set. (i) Welding of skin casing and sector beam after refractory work is over. (j) Skin casing should be welded by high pressure sequence welding technique as per IBR with Supratherm (spl) electrode and ensure to be leak proof. (k) Closing of elephant door by welding after completion of work.

AI Tender Summary

OUR REF NO 56360391
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 16.82 Lakhs
LAST DATE 23-07-2026
Authority
Authority Name Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited
Work Description Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Thermal Power Plant; Insulation, Refractory Works, Removal Of Accumulated Fly Ash From Inside The Heating Surface And Other Areas Of Boiler And Their Disposal From Boile.. - Complete Insulation Of Pipelines, Pressure Parts Main Boier, Esp, Ducts And Other Associated Equipments Of 2X500 Mw Boiler When New Cladding To Be Provided With 20-24 Gauges (G.I.)/Aluminium Sheet Shall Be Provided By The Department Free Of Cost). Work Includes Fabrication And Fixing Of Cladding Structure One Layer Of Mineral Wool Blankets/Pads Or Calcium Silicate Pipe Section Of Thickness 40/50/60 Mm, Are Provided/Fixed At Site. , Complete Insulation Of Pipelines, Pressure Parts Main Boier, Esp, Ducts And Other Associated Equipments Of 2X500 Mw Boiler When New Cladding To Be Provided With 20-24 Gauges (G.I.)/Aluminium Sheet Shall Be Provided By The Department Free Of Cost). Work Includes Fabrication And Fixing Of Cladding Structure More Than One Layer Of Mineral Wool Blankets/Pads Or Calcium Silicate Pipe Section Of Thickness 40/50/60 Mm, Are Provided/Fixed At Site. , Complete Insulation Of Pipelines, Pressure Parts Main Boier, Esp, Ducts And Other Associated Equipments Of 2X500 Mw Boiler When Old/Removed Cladding Sheets To Be Fixed With The Help Of Self Tapping Screw, Complete Insulation Of Pipelines, Pressure Parts Main Boier, Esp, Ducts And Other Associated Equipments Of 2X500 Mw Boiler When One Layer Of Mineral Wool Blankets/Pads Or Calcium Silicate Pipe Section Of Thickness 40/50/60 Mm, Are Provided Or The Old/Removed But Usable Are Provided/Fixed At Site. , Complete Insulation Of Pipelines, Pressure Parts Main Boier, Esp, Ducts And Other Associated Equipments Of 2X500 Mw Boiler When Old/Removed Cladding To Be Provided With 20-24 Gauges (G.I.)/Aluminium Sheet Shall Be Provided By The Department Free Of Cost). Work Includes Fabrication And Fixing Of Cladding Structure More Than One Layer Of Mineral Wool Blankets/Pads Or Calcium Silicate Pipe Section Of Thickness 40/50/60 Mm, Are Provided Or The Old/Removed But Usable Are Provided/Fixed At Site. , Insulation Of Headers In Pent House/Outside, When More Than One Layer Of Mineral Wool/Blankets/Pads Of Thickness 40/50/60 Mm, Are Provided/Fixed On The Headers In Pent House. Work Involved Are As Under: (A) Dismantling Of Old Damaged Insulating Materials And Shifting The Same To Dumping Yard. (B) Transportation Of New Mineral Wool Blanket/Pads From Central Store To Site Store And Thereafter To 80Mtr. Of Boiler Elevation. (C) Fixing Of Mineral Wool Blankets/Pads And Stitching The Same With G.I. /M.S. /S.S. Wire Holding The Insulation Materials On The Header, Mineral Wool/Winding Wire Etc. Shall Be Provided By The Department Free Of Cost. , Application Of Mineral Wool Blankets/Pads And Fixing With G.I. Wire On H.P. /L.P. Valves Of Boiler. Application Of Insulating Powder, Hard Lag/ Mastic Compound & Finishing/Cladding With G.I./Aluminium Sheets Of 20-24 Gauge Wherever Required As Per Site Requirement Or As Instructed. , Application Of Castable Refractory In Main Boiler/ Pressure Parts Heating Zones. Work Involved Are As Under: (A) Removal Of Old And Damaged Refractory By Chipping Out, Collecting And Shifting The Same To Dumping Yard Or As Instructed. (B) Welding Of S.S. /M.S. Pegs Of Required Size For Reinforcement At Required Distance And Casting New Refractory. Manpower For Transportation The Refractory Materials From Central Stores To Work Site Shall Be Provided By The Contractor. , Application Of Plastic Refractory On Burner Panel Zone , Cleaning And Removal Of Fly Ash/Foreign Materials/Debris Etc. And Their Disposal To Dumping Yard From The Primary Super Heater Chamber Inside The Boiler. , Cleaning And Removal Of Fly Ash/Foreign Materials/Debris Etc. And Their Disposal To Dumping Yard From Economizer Chamber Inside The Boiler , Cleaning And Removal Of Fly Ash/Foreign Materials/Debris Etc. And Their Disposal To Dumping Yard From Gallery Between Re-Heaters And Arch Tube Inside The Boiler. , Cleaning And Removal Of Fly Ash/Foreign Materials/Debris Etc. And Their Disposal To Dumping Yard From Gallery Between Re-Heaters And Arch Tube Inside The Boiler. , Cleaning And Removal Of Fly Ash/Foreign Materials/Debris Etc. And Their Disposal To Dumping Yard From Gallery Between Tertiary Super Heater And Secondary Re-Heater In Pent House. . , Cleaning And Removal Of Fly Ash/Foreign Materials/Debris Etc. And Their Disposal To Dumping Yard From Gallery Between Tertiary Super Heater And Secondary Re-Heater In Pent House. , Cleaning And Removal Of Fly Ash/Foreign Materials/Debris Etc. And Their Disposal To Dumping Yard From Gallery Between Tertiary Re-Heater And Final Super Heater In Pent House. , Cleaning And Removal Of Fly Ash/Foreign Materials/Debris Etc. And Their Disposal To Dumping Yard From Gallery Between Final Super Heater And Primary Super Heater Headers In Pent House. , Cleaning And Removal Of Fly Ash//Foreign Materials/Debris Etc. And Their Disposal To Dumping Yard From Hot Secondary Air Duct From Aph To Wind Box (Left) , Cleaning And Removal Of Fly Ash//Foreign Materials/Debris Etc. And Their Disposal To Dumping Yard From Hot Secondary Air Duct. From Aph To Wind Box (Right) , Cleaning And Removal Of Fly Ash//Foreign Materials/Debris Etc. And Their Disposal To Dumping Yard From Boiler Furnace Wind Box (Left) , Cleaning And Removal Of Fly Ash//Foreign Materials/Debris Etc. And Their Disposal To Dumping Yard From Boiler Furnace Wind Box (Right) , Cleaning And Removal Of Fly Ash//Foreign Materials/Debris Etc. And Their Disposal To Dumping Yard From Interconnecting Duct Of Hot Secondary Air. , Cleaning And Removal Of Fly Ash//Foreign Materials/Debris Etc. And Their Disposal To Dumping Yard From Inlet D Er To Outlet D Er Of Air And Flue Gas Duct Of Primary Aph Including Aph. , Cleaning And Removal Of Fly Ash//Foreign Materials/Debris Etc. And Their Disposal To Dumping Yard From Inlet D Er To Outlet D Er Of Air And Flue Gas Duct Of Secondary Aph Including Aph. , Cleaning And Removal Of Fly Ash/Foreign Materials/Debris/Garbage/Pigeon Shits Etc. From Pent House Roof Of Boiler By Sweeping With Hard Broom/Wire Brush And Their Disposal To Dumping Yard. , Cleaning/Sweeping And Removal Of Fly Ash/Foreign Materials/Debris/Garbage Etc. From Dog House Of Boiler And Their Disposal To Dumping Yard. , Cleaning And Removal Of Fly Ash/Foreign Materials/Debris/Garbage Etc. From S-Panel Of Boiler And Their Disposal To Dumping Yard. , Cleaning And Removal Of Fly Ash/Foreign Materials/Debris/Garbage/Pigeon Shits Etc. From Buck Stay Of First And Second Pass Of Boiler From 11Mtr To 80Mtr And Sweeping With Hard Broom/Wire Brush And Their Disposal To Dumping Yard. , Repairing /Replacement Of Bulged/Damaged Skin Casing At Different Section In Pent House 1St/2Nd Pass After Removal By Cutting And Releasing From High Crown Plates Expansion Bellows, Straightening And Refixing By High Pressure Welding In 2X500 Mw Boiler Of Btps, Anpara. Work Involved Are As Under: (A) Cutting Of Elephant Door At Boiler Drum Level In Pent House After Cutting Outer Cladding And Removal Of Insulation. (B) Cutting Of Bulged/Damaged Skin Casing Plates By Grinder/Gas Cutting Set With Utmost Precaution Ensuring No Damage To The Boiler Pressure Parts Tubes And Expansion Joints Inside The Pent House. (C) Removal Of Damaged Skin Casing After Cutting To Outside Pent House At Boiler Drum Floor. (D) Skin Casing To Be Cut In Full Segment Length, Not In Small Pieces. (E) Care Should Be Taken Of Expansion Joints, Pressure Parts Tubes Sling Holes Provided In Pent House For Sky Climber Rope, While Cutting The Damaged Skin Casing. (F) Straightening Of Damaged Skin Casing By Gas Heating Process And Pressing With Jacks/Hammers (G) Removal Of Refractory Beneath Skin Casing Above Roof Tubes For Inspection Of Peg Fins, Roof Tubes And High Crown. Any Defect Observed In Roof Tubes, High Crown Or Pendent Panels Should Be Identified And Got Inspected By The Engineer In-Charge. Repair Of Peg Fins And High Crown Should Be Carried Out By High Pressure Welding Strictly In Accordance To Ibr. (H) Providing New Refractory And Curing The Same, Allowing At Least 24 Hrs. To Set. (I) Welding Of Skin Casing And Sector Beam After Refractory Work Is Over. (J) Skin Casing Should Be Welded By High Pressure Sequence Welding Technique As Per Ibr With Supratherm (Spl) Electrode And Ensure To Be Leak Proof. (K) Closing Of Elephant Door By Welding After Completion Of Work.
Basic Detail
Tender No GEM/2026/B/7759624
Bidding Type Tender
Location
City Sonbhadra
State Uttar Pradesh
Key Dates
Publish Date 08 Jul 2026
Submission Date 23 Jul 2026
Open Date 23 Jul 2026
Finance
Tender Value 16.82 Lakhs
Tender Fee Ref. Documents
EMD 34000
Exemption Not Available
Document List
81661219-e013-447b-abe5-75897259edb6.pdf
1783497640.xlsx
1783497680.pdf
1783497713.pdf
1783497725.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 08, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 23, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 14 days
Jul 23, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 14 days

Tender Documents

Download All (ZIP) ↓
pdf

81661219-e013-447b-abe5-75897259edb6.pdf

xlsx

1783497640.xlsx

pdf

1783497680.pdf

pdf

1783497713.pdf

pdf

1783497725.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders