Defence Statutory Bodies & Commissions/Committees Closing in 18 days TDR #56358970

Tender For Repair And Painting Of The Steel Furniture And Maintenance Of Charpoy Gi Pipe And Tp Furniture Of Hq Sac (U), 17 Fbsu, 257 Su, 340 Tru Under Ge (Af) Trivandrum

Issued by Statutory Bodies & Commissions/Committees · Thiruvananthapuram, Kerala
Tender Value
32 Lakhs
Estimated cost
Bid Submission
29 Jul 2026
18 days left
EMD
64000
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Thiruvananthapuram → Kerala
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Repair And Painting Of The Steel Furniture And Maintenance Of Charpoy Gi Pipe And Tp Furniture Of Hq Sac (U), 17 Fbsu, 257 Su, 340 Tru Under Ge (Af) Trivandrum

BOQ

Name of Work:- REPAIR AND PAINTING OF THE STEEL FURNITURE AND MAINTENANCE OF CHARPOY GI PIPE AND TP FURNITURE OF HQ SAC (U), 17 FBSU, 257 SU, 340 TRU UNDER GE (AF) TRIVANDRUM
Sl. No. Item Description
1REPAIRS TO STEEL FURNITURES:- General Note to all items mentioned below: The repairs to furniture items shall be done in accordance with BOQ, particular Spn and drawing. The exact dimensions of furniture shall favourably be matched after the repair work, single item of furniture may require multiple BOQ items for completing the entire repair works. However while doing the repair work any small repair work which are essential for the repair work shall deemed to be included in the unit rate quoted to get the furniture in its original design and dimensions. The tenderers are fully be aware of the design of furniture exact repair work to be carried out .
2ALMIRAH LARGE STEEL,FD- 1031 / TP
3Removing UNSV door shutter carefully by unriveting the hinges,S&F new door shutter made of 1 mm thick MS sheet of same size and shape duly fixed to almirah large steel with new 80mm long MS hinge. Complete all as specified , directed and shown on drawing.
4Removing UNSV lock from shutters of almirah large steel;S&F new 6 lever lock with duplicate keys.Complete all as specified , directed and shown on drawing..Make of Locks-Godrej/Harrison/Link
5Removing UNSV handle from almirah steel large ,S&F new 130mm long chromium plated handle to steel shutters ,Complete all as specified , directed and shown on drawing.
6Removing UNSV/damaged shelf carefully by removing the rivets and welding spots,S&F new shelf made of 1 mm thick MS sheet of same size and shape. Complete all as specified , directed and shown on drawing.
7Removing UNSV/damaged bottom portion carefully by removing rivets and welding spots and S&F new bottom made of 1 mm thick MS sheet of same size and shape by welding .Complete all as specified , directed and shown on drawing.
8Removing UNSV leg from bottom of almirah carefully by unriveting and using hand held cutting machine without damaging the other parts.S&F new leg made of 1mm thick MS sheet to the existing place through welding and riveting.Complete all as specified , directed and shown on drawing.
9Spot gas welding / Continous gas welding on all broken joints in lengths 1 CM Complete all as specified , directed and shown on drawing.
10Material and labour for painting each almirah by peeling out the old paint by applying paint remover solution,filling metal putty to the uneven surfaces and sanding it to make the surface smooth then wipe out the surface and remove the dust with a fine cloth. One coat of Hammer tone paint to be done as per shade approved in each item shall be applied externally and internally to each article after applying and drying one coat of metal primer. The painting to each article shall only be carried out by spray machine onlyComplete all as specified , directed and shown on drawing.
11ALMIRAH STEEL MEDIUM WITH SHELVES,FD-67(M)/1032
12Removing UNSV door shutter carefully by unriveting the hinges,S&F new door shutter made of 1 mm thick MS sheet of same size and shape duly fixed to almirah large steel with new 80mm long MS hinge. Complete all as specified , directed and shown on drawing.
13Removing UNSV lock from shutters of almirah large steel;S&F new 6 lever lock with duplicate keys. Complete all as specified , directed and shown on drawing.Make of Locks-Godrej/Harrison/Link
14Removing UNSV handle from the almirah steel large, S&F new 130mm long chromium plated handle to steel shutters ,Complete all as specified , directed and shown on drawing.
15Removing UNSV/damaged shelf carefully by removing the rivets and welding spots,S&F new shelf made of 1 mm thick MS sheet of same size and shape. Complete all as specified , directed and shown on drawing.
16Removing UNSV/damaged bottom portion carefully by removing rivets and welding spots and S&F new bottom made of 1 mm thick MS sheet of same size and shape. Complete all as specified , directed and shown on drawing.
17Removing UNSV leg from bottom of almirah carefully by unriveting and using hand held cutting machine without damaging the other parts.S&F new leg made of 1mm thick MS sheet to the existing place through welding and riveting.Complete all as specified , directed and shown on drawing.
18Spot gas welding / Continous gas welding on all broken joints in lengths 1 CM Complete all as specified , directed and shown on drawing.
19Material and labour for painting each almirah by peeling out the old paint by applying paint remover solution,filling metal putty to the uneven surfaces and sanding it to make the surface smooth then wipe out the surface and remove the dust with a fine cloth.Two coats of Hammer tone paint to be done as per shade approved in each item shall be applied externally and internally to each article after applying and drying one coat of metal primer. The painting to each article shall only be carried out by spray machine only Complete all as specified , directed and shown on drawing.
20TABLE OFFICE OFFICER STEEL,FD-1003 / 84M
21Removing UNSV top; S&F new top of size 1680mmx870mm made of 18mm thick prelaminated MDF board exterior grade both side laminated with same shade duly providing 4mm thick teak wood edging all around duly fixed with adhesive and headless nails . Complete all as specified , directed and shown on drawing.
22Removing the existing unservicable /rusted drawer ; S&F new drawer made of 1mm MS sheet as per size and dimension with 100 mm long chrome plated handle fixed at front.Complete all as specified , directed and shown on drawing.
23Removing UNSV lock from drawers and shutters ;S&F new 6 lever lock with duplicate keys. Complete all as specified , directed and shown on drawing.Make of Locks-Godrej/Harrison/Link
24Removing the old broken PVC shoes from the legs of table,S&F new PVC shoes of size 25mmx25mm having metal washers fitted inside at bottom Complete all as specified , directed and shown on drawing.
25Spot gas welding / Continous gas welding on all broken joints in lengths 1 cm Complete all as specified , directed and shown on drawing.
26Material and labour for painting each table office officer steel by peeling out the old paint by applying paint remover solution,filling metal putty to the uneven surfaces and sanding it to make the surface smooth then wipe out the surface and remove the dust with a fine cloth. One Coat of Hammer tone paint to be done as per shade approved in each item shall be applied externally and internally to each article after applying and drying one coat of metal primer. The painting to each article shall only be carried out by spray machine only Complete all as specified , directed and shown on drawing.
27TABLE OFFICE CLERK STEEL,FD-84(M)/1004
28Removing UNSV top carefully;S&F new top of size 1200mmx610mm made of 18mm thick prelaminated MDF board exterior grade both side laminated with same shade duly providing 4mm thick teak wood edging all around fixed with adhesive and headless nails. Complete all as specified , directed and shown on drawing.
29Removing the existing unservicable /rusted drawer ; S&F new drawer made of 1mm MS sheet as per size and dimension with 100 mm long chrome plated handle fixed at front. Complete all as specified , directed and shown on drawing.
30Removing UNSV lock from drawers and shutters ;S&F new 6 lever lock with duplicate keys. Complete all as specified , directed and shown on drawing.Make of Locks-Godrej/Harrison/Link
31Removing the old broken PVC shoes from the legs of table ,S&F new PVC shoes of size 25mmx25mm having metal washers fitted inside at bottom Complete all as specified , directed and shown on drawing.
32Spot gas welding / Continous gas welding on all broken joints in lengths 1 CM Complete all as specified , directed and shown on drawing.
33Material and labour for painting each table office clerk steel by peeling out the old paint by applying paint remover solution,filling metal putty to the uneven surfaces and sanding it to make the surface smooth then wipe out the surface and remove the dust with a fine cloth. One coat of Hammer tone paint to be done as per shade approved in each item shall be applied externally and internally to each article after applying and drying one coat of metal primer. The painting to each article shall only be carried out by spray machine only Complete all as specified , directed and shown on drawing.
34TABLE STEEL 900X900X760MM,FD-1009
35Removing UNSV top from table steel carefully;S&F new top of size 900mmx900mm made of 18mm thick prelaminated MDF board exterior grade both side laminated with same shade duly providing 4mm thick teak wood edging all around fixed with adhesive and headless nails. Complete all as specified , directed and shown on drawing.
36Removing UNSV leg from the table steel carefully by cutting the welded ends with hand held machine and S&F new leg made of MS Square tube 25mmx25mm of wall thickness 1.6mm by welding to the exact place and position,The welded surface shall also be grinded to make the spots and surface smooth Complete all as specified , directed and shown on drawing.
37Removing UNSV top rail from the table carefully by cutting the welded ends with hand held machine and supply and fix new rail made of MS Square tube 25mmx25mm of wall thickness 1.6mm by welding to the exact place and position,The welded surface shall also be grinded to make the spots and surface smooth Complete all as specified , directed and shown on drawing.
38Supply and fix new PVC shoe suitable to leg after removing UNSV shoe Complete all as specified , directed and shown on drawing.
39Material and labour for painting each table steel by peeling out the old paint by applying paint remover solution,filling metal putty to the uneven surfaces and sanding it to make the surface smooth then wipe out the surface and remove the dust with a fine cloth. One coat of Hammer tone paint to be done as per shade approved in each item shall be applied externally and internally to each article after applying and drying one coat of metal primer. The painting to each article shall only be carried out by spray machine only Complete all as specified , directed and shown on drawing.
40TABLE STEEL 900X600X760MM,FD-1008
41Removing UNSV top from table steel carefully;S&F new top of size 900mmx600mm made of 18mm thick prelaminated MDF board exterior grade both side laminated with same shade duly providing 4mm thick teak wood edging all around fixed with adhesive and headless nails. Complete all as specified , directed and shown on drawing.
42Removing UNSV leg from the table steel carefully by cutting the welded ends with hand held machine and S&F new leg made of MS Square tube 25mmx25mm of wall thickness 1.6mm by welding to the exact place and position,The welded surface shall also be grinded to make the spots and surface smooth Complete all as specified , directed and shown on drawing.
43Removing UNSV top rail from the table carefully by cutting the welded ends with hand held machine and supply and fix new rail made of MS Square tube 25mmx25mm of wall thickness 1.6mm by welding to the exact place and position,The welded surface shall also be grinded to make the spots and surface smooth Complete all as specified , directed and shown on drawing.
44Removing the existing unservicable /rusted drawer ; S&F new drawer made of 1mm MS sheet as per size and dimension with 100 mm long chrome plated handle fixed at front. Complete all as specified , directed and shown on drawing.
45Supply and fix new PVC shoe suitable to leg after removing UNSV shoe complete all as specified, as directed and as shown on drawing.
46Material and labour for painting each table steel by peeling out the old paint by applying paint remover solution,filling metal putty to the uneven surfaces and sanding it to make the surface smooth then wipe out the surface and remove the dust with a fine cloth. One coat of Hammer tone paint to be done as per shade approved in each item shall be applied externally and internally to each article after applying and drying one coat of metal primer. The painting to each article shall only be carried out by spray machine only Complete all as specified , directed and shown on drawing.
47TABLE STEEL W/O DRAWER 900X600X760MM,FD-1007
48Removing UNSV top from table steel carefully;S&F new top of size 900mmx600mm made of 18mm thick prelaminated MDF board exterior grade both side laminated with same shade duly providing 4mm thick teak wood edging all around fixed with adhesive and headless nails. Complete all as specified , directed and shown on drawing.
49Removing UNSV leg from the table steel carefully by cutting the welded ends with hand held machine and S&F new leg made of MS Square tube 25mmx25mm of wall thickness 1.6mm by welding to the exact place and position,The welded surface shall also be grinded to make the spots and surface smooth Complete all as specified , directed and shown on drawing.
50Removing UNSV top rail from the table carefully by cutting the welded ends with hand held machine and supply and fix new rail made of MS Square tube 25mmx25mm of wall thickness 1.6mm by welding to the exact place and position,The welded surface shall also be grinded to make the spots and surface smooth Complete all as specified , directed and shown on drawing.
51Supply and fix new PVC shoe suitable to leg after removing UNSV shoe Complete all as specified , directed and shown on drawing.
52Material and labour for painting each table steel by peeling out the old paint by applying paint remover solution,filling metal putty to the uneven surfaces and sanding it to make the surface smooth then wipe out the surface and remove the dust with a fine cloth. One coat of Hammer tone paint to be done as per shade approved in each item shall be applied externally and internally to each article after applying and drying one coat of metal primer. The painting to each article shall only be carried out by spray machine only Complete all as specified , directed and shown on drawing.
53CHAIR REVOLVING EXECUTIVE TYPE HIGH BACK: TP
54Removing the existing torn out leatherette, pressed foam cushion,elastic webbing tape seat and back by unscrewing the seat and back from frame of chair carefully.S&F new seat and back made by using 40 density foam sheets of existing thickness,new webbing tape duly covered with new leatherette of approved colour and texture of rate not less than 500 per mtr.The fixing of leatherette shall be done by using heavy duty gun tacker.The seat and back shall also be covered with plastic transparent film.Complete all as specified and as directed.
55Removing the existing torn out leatherette cloth from seat and back of chair carefully.S&F new leatherette of approved colour and texture to seat and back of chair to restore the chair in original shape ,the rate of cloth shall not be less than 800 per mtr.The fixing of cloth shall be done by using heavy duty gun tacker.Complete all as specified and as directed.
56Removing old unserviceable arm rest of chair and S&F new arm of same shape and size ,made of black integral skin polyurethane with 75-85 shore 'Á ' hardness & reinforced with MS insert all as specified and directed .
57Removing unserviceable castor twin wheels and S&F new castor twin wheel suitable for chair computer Complete all as specified , directed and shown on drawing.
58Removing unserviceable 5 spokes stainless steel adjustable pedestal assembly, S&F new 5 spokes stainless steel adjustable pedestal assembly to chair computer all as specified and directed .
59Removing unserviceable hydraulic gas lift cylinder of chair ,S&F new hydraulic gas lift cylinder to chair.Complete all as specified , directed and shown on drawing.
60Painting to all steel portion of chair with one coat of synthetic enamel black paint after cleaning,dusting and scratching the entire metal surface of chair with sand paper ,making surface neat and smooth Complete all as specified , directed and shown on drawing.
61TABLE COMPUTER ,TP
62Removing UNSV top from table computer carefully;S&F new top made of 18mm thick prelaminated MDF board exterior grade both side laminated with same shade duly providing 4mm thick teak wood edging all around fixed with adhesive and headless nails. Complete all as specified , directed and shown on drawing.
63Removing the existing unservicable key board of table computer by removing the unsv telescopic channel.supply and fix key board attached with new telescopic channel made out of 18mm thick prelaminated MDF board exterior grade both side laminated with same shade duly providing 4mm thick teak wood edging all around fixed with adhesive and headless nails. Complete all as specified , directed and shown on drawing.
64Removing the existing unservicable mouse pad board complete from Table computer and supply and fix new mouse tray18mm thick prelaminated MDF board exterior grade both side laminated with same shade duly providing 4mm thick teak wood edging all around fixed with adhesive and headless nails. Complete all as specified , directed and shown on drawing.
65Removing the existing unservicable CPU stand part complete from Table computer and supply and fix new CPU stand made of 18mm thick prelaminated MDF board exterior grade both side laminated with same shade duly providing 4mm thick teak wood edging all around fixed with adhesive and headless nails.Complete all as specified , directed and shown on drawing.
66Removing UNSV/damaged drawer complete from Table computer and supply and fix new drawer made of 18mm thick prelaminated MDF board exterior grade both side laminated with same shade duly providing 4mm thick teak wood edging all around fixed with adhesive and headless nails.The drawer shall be provided with decorative knob. Complete all as specified , directed and shown on drawing.
67CHAIR AUDITORIUM PUSH BACK, TP
68Removing the existing torn out tapestry cloth ,pressed foam cushion,elastic webbing tape,PVC lipping from seat and back by unscrewing the seat and back from frame of chair carefully.S&F new seat and back made by 40 density foam sheets of existing thickness, new webbing tape, new PVC lipping duly covered with new tapestry cloth / LEATHERETTE GOOD QUALITY of approved colour and texture of rate not less than 1000 per mtr.The fixing of cloth shall be done by using heavy duty gun tacker.The seat and back shall also be covered with plastic transparent film. Complete all as specified , directed and shown on drawing.
69Removing old unserviceable arm rest of chair and S&F new arm of same shape and size ,made of black integral skin polyurethane with 75-85 shore 'Á ' hardness & reinforced with MS insert all as specified and directed .
70Painting to all steel portion of chair with one coat of synthetic enamel black paint after cleaning,dusting and scratching the entire metal surface of chair with sand paper ,making surface neat and smooth and fix it back in the row of chairs Complete all as specified , directed and shown on drawing.
71CHARPOY GI PIPE WITH PLY TOP, FD-220 / 220 ®
72Taking out existing unserviceable / broken plywood from the charpoy GI pipe by unscrewing nut, washer and flat iron. Tightening each part of the entire frame of charpoy by using pipe wrench and supply and fixing new 12mm thick plywood BWR grade-AAA made of size 1980mm x 900mm fixed over the GI pipe frame and fixing 3 components (i.e- ply, flat iron and rail) with new GI nylon insert nut, bolt and washers 8mm dia 62mm to 65mm long Complete all as specified , directed and shown on drawing.
73CHAIR VERANDAH:-, FD-256, FD/MAP-II/06
74Spot gas welding to broken parts/joints of chairs Complete all as specified , directed and shown on drawing.
75Removing of existing torn out/unserviceable plastic cane from chair verandah and recanning the chair fully both seat and back with new plastic cane of virgin quality white, half round of size 4mm wide and 0.60 mm thick.complete all as specified and shown on drawing.The canning shall only be done after painting the chair Complete all as specified , directed and shown on drawing.
76Removing the old broken shoes of chairs and Supply and Fixing best quality new PVC shoes to the legs of chair Complete all as specified , directed and shown on drawing.
77Removing the existing unserviceable/broken PVC seat and back from the chair,supply and fixing new PVC seat and back 4mm thick to the chair verandah MAP after providing one flat iron of size 20mmx5mm in support of PVC seat at centre between two sides through proper welding .The PVC seat shall got approved from GE before supply.The PVC seat shall be fied only after painting the chair Complete all as specified , directed and shown on drawing.
78Painting the frame of the chairs by two coats of synthetic enamel white of approved quality paint after prepartion of steel surface by sanding with sand emery paper and dusting the surface with clean cloth.The chair frame shall be made smooth by applying metal putty wherever required Complete all as specified , directed and shown on drawing.
79CHAIR STEEL TUBULAR WITH ARM:FD-75(M)
80Scratching the entire frame of chair and applying one coat of synthetic enamel paint after preparation of surfaces by removing the old paint with sand emery paper. Complete all as specified and as directed.
81Remvoing the old unserviceable and broken MS flat and supply and fixing MS flat of size 25mmx4mm welded beneath in between the width of the chair for support of seat Complete all as specified , directed and shown on drawing.
82Removing the old unserviceable seat from the frame of the chair. Supply and fixing new seat made of teak wood duly polished in natural shade including cane work in godrej pattern, fitting in position with 04 nos of nut bolts and washers of length 60-65mm Complete all as specified , directed and shown on drawing.
83Removing the old unserviceable back from the frame of the chair. Supply and fixing new back made of teak wood duly polished in natural shade including cane work in godrej pattern, fitting in position with 04 nos of nut bolts and washers of length 60-65mm Complete all as specified , directed and shown on drawing.
84Removing the old unserviceable arm and supply and fixing new arm of 1st class teak wood as per drg Complete all as specified , directed and shown on drawing.
85Removing the old unserviceable Hard rubber shoes and supply and fixing new Hard rubber shoes as per drg Complete all as specified , directed and shown on drawing.
86Removing the old unserviceable rubber caps and supply and fixing new rubber caps as per drg Complete all as specified , directed and shown on drawing.
87CHAIR STEEL TUBULAR WITHOUT ARM: FD-75(M)
88Scratching the entire frame of chair and applying one coat of synthetic enamel paint after preparation of surfaces. Complete all as specified and as directed .
89Removing the old unserviceable and broken MS flat and supply and fixing MS flat of size 25mmx4mm welded beneath in between the width of the chair for support of seat Complete all as specified , directed and shown on drawing.
90Removing the old unserviceable seat from the frame of the chair. Supply and fixing new seat made of teak wood duly polished in natural shade including cane work in godrej pattern, fitting in position with 04 nos of nut bolts and washers of length 60-65mm Complete all as specified , directed and shown on drawing.
91Removing the old unserviceable back from the frame of the chair. Supply and fixing new back made of teak wood duly polished in natural shade including cane work in godrej pattern, fitting in position with 04 nos of nut bolts and washers of length 60-65mm Complete all as specified , directed and shown on drawing.
92Removing the old unserviceable Hard rubber shoes and supply and fixing new Hard rubber shoes as per drg Complete all as specified , directed and shown on drawing.
93Removing the old unserviceable rubber caps and supply and fixing new rubber caps as per drg Complete all as specified , directed and shown on drawing.
94CHARPOY IP HARD TOP,FD/MAP-II/01
95Removing of old unserviceable Top ,Supply and fixing new top made of 12mm thick BWR Plywood grade-AA of size 1980mmx900mm fixed 12x Nos of 50mm long 8mm dia flat head nut , bolts and washers. Complete all as specified , directed and shown on drawing.
96Spot gas welding / Continous gas welding on all broken joints in lengths 1cm Complete all as specified , directed and shown on drawing.
97Material and labour for painting each Charpoy by peeling out the old paint by applying paint remover solution,filling metal putty to the uneven surfaces and sanding it to make the surface smooth then wipe out the surface and remove the dust with a fine cloth. One coat of Hammer tone paint to be done as per shade approved in each item shall be applied externally and internally to each article after applying and drying one coat of metal primer. The painting to each article shall only be carried out by spray machine only Complete all as specified , directed and shown on drawing.
98CHARPOY MS SQUARE PIPE PLYTOP, TD/65/06
99Removing of old unserviceable Top ,Supply and fixing new top made of 12mm thick BWR Plywood grade-AA of size 1980mmx900mm fixed 12x Nos of 50mm long 8mm dia flat head nut , bolts and washers. Complete all as specified , directed and shown on drawing.
100Spot gas welding / Continous gas welding on all broken joints in lengths 1 CM Complete all as specified , directed and shown on drawing.
101Material and labour for painting each Charpoy by peeling out the old paint by applying paint remover solution,filling metal putty to the uneven surfaces and sanding it to make the surface smooth then wipe out the surface and remove the dust with a fine cloth. One coat of Hammer tone paint to be done as per shade approved in each item shall be applied externally and internally to each article after applying and drying one coat of metal primer. The painting to each article shall only be carried out by spray machine only Complete all as specified , directed and shown on drawing.
102CHAIR REVOLVING, TP
103Removing the existing torn out tapestry cloth ,pressed foam cushion,elastic webbing tape,pVC lipping from seat and back by unscrewing the seat and back from frame of chair carefully.S&F new seat and back made by using 60mm thick 40 density foam sheets,new webbing tape,new PVC lipping duly covered with new tapestry cloth of approved colour and texture of rate not less than 400 per mtr.The fixing of cloth shall be done by using heavy duty gun tacker.The seat and back shall also be covered with plastic transparent film.Complete all as specified , directed and shown on drawing.
104Removing the existing torn out tapsetry cloth from seat and back of chair carefully after removing the PVC lipping.S&F new tapestry cloth of approved colour and texture to seat and back of chair along with PVC lipping to restore the chair in original shape ,the rate of cloth shall not be less than 400 per mtr.The fixing of cloth shall be done by using heavy duty gun tacker.Complete all as specified and as directed.
105Removing old unserviceable arm rest of chair and S&F new arm of same shape and size ,made of black integral skin polyurethane with 75-85 shore 'Á ' hardness & reinforced with MS insert all as specified and directed .
106Removing unserviceable castor twin wheels and S&F new castor twin wheel suitable for chair revolving godrej Complete all as specified , directed and shown on drawing.
107Removing unserviceable pedestal assembly,S&F new pedestal assembly having five arms with twin wheel castor wheels having wheel base not less than 70 cms.Complete all as specified , directed and shown on drawing.
108Removing unserviceable hydraulic gas lift cylinder of chair ,S&F new hydraulic gas lift cylinder to chair.Complete all as specified , directed and shown on drawing.
109Painting to all steel portion of chair revolving with one coat of synthetic enamel black paint after cleaning,dusting and scratching the entire metal surface of chair with sand paper ,making surface neat and smooth.Complete all as specified , directed and shown on drawing.
110CHAIR COMPUTER REVOLVING, TP
111Removing the existing torn out tapestry cloth ,pressed foam cushion,elastic webbing tape,pVC lipping from seat and back by unscrewing the seat and back from frame of chair carefully.S&F new seat and back made by using 60mm thick 40 density foam sheets,new webbing tape,new PVC lipping duly covered with new tapestry cloth of approved colour and texture of rate not less than 400 per mtr.The fixing of cloth shall be done by using heavy duty gun tacker.The seat and back shall also be covered with plastic transparent film.Complete all as specified and as directed.
112Removing the existing torn out tapsetry cloth from seat and back of chair carefully after removing the PVC lipping.S&F new tapestry cloth of approved colour and texture to seat and back of chair along with PVC lipping to restore the chair in original shape ,the rate of cloth shall not be less than 400 per mtr.The fixing of cloth shall be done by using heavy duty gun tacker.Complete all as specified and as directed.
113Removing old unserviceable arm rest of chair and S&F new arm of same shape and size ,made of black integral skin polyurethane with 75-85 shore 'Á ' hardness & reinforced with MS insert all as specified and directed .
114Removing unserviceable castor twin wheels and S&F new castor twin wheel suitable for chair revolving godrej. Complete all as specified , directed and shown on drawing.
115Removing unserviceable pedestal assembly,S&F new pedestal assembly having five arms with twin wheel castor wheels having wheel base not less than 70 cms.Complete all as specified , directed and shown on drawing.
116Removing unserviceable hydraulic gas lift cylinder of chair ,S&F new hydraulic gas lift cylinder to chair.Complete all as specified , directed and shown on drawing.
117Painting to all steel portion of chair revolving with one coat of synthetic enamel black paint after cleaning,dusting and scratching the entire metal surface of chair with sand paper ,making surface neat and smooth.Complete all as specified , directed and shown on drawing.
118CHAIR WRITING ,FD/E6/MAP/12, TP
119Removing the existing torn out tapestry cloth ,pressed foam cushion,elastic webbing tape,pVC lipping from seat and back by unscrewing the seat and back from frame of chair carefully.S&F new seat and back made by using 60mm thick 40 density foam sheets,new webbing tape,new PVC lipping duly covered with new tapestry cloth of approved colour and texture of rate not less than 400 per mtr.The fixing of cloth shall be done by using heavy duty gun tacker.The seat and back shall also be covered with plastic transparent film.Complete all as specified , directed and shown on drawing.
120Removing the existing torn out tapsetry cloth from seat and back of chair carefully after removing the PVC lipping.S&F new tapestry cloth of approved colour and texture to seat and back of chair along with PVC lipping to restore the chair in original shape ,the rate of cloth shall not be less than 400 per mtr.The fixing of cloth shall be done by using heavy duty gun tacker.Complete all as specified , directed and shown on drawing.
121Removing old unserviceable arm rest of chair and S&F new arm of same shape and size ,made of black integral skin polyurethane with 75-85 shore 'Á ' hardness & reinforced with MS insert all as specified and directed .
122Spot gas welding / Continous gas welding on all broken joints in lengths 1 CM Complete all as specified , directed and shown on drawing.
123Painting to all steel portion of chair writing with one coat of synthetic enamel black paint after cleaning,dusting and scratching the entire metal surface of chair with sand paper ,making surface neat and smooth Complete all as specified , directed and shown on drawing.
124BED PLY STEEL TOP (FD/E6/MAP/08(R)
125Removing of old unserviceable PVC Shoes,Supply and fixing new High quality hard PVC shoes of size 38mm x 38mm,Complete all as specified , directed and shown on drawing.
126Removing of old unserviceable head board ,Supply and fixing in position with new cut piece at head board of size 638mm x 201mm made of 18mm thick prelaminated MDF board with 2mm thick PVC beading alround its edges duly fixed with suitable wooden screw.Complete all as specified , directed and shown on drawing.
127Removing of old unserviceable prelaminated particle board from foot board,Supply and fixing in position with new cut piece at foot board of size 638mmx314mm made of 18mm thick prelaminated MDF board with 2mm thick PVC beading alround its edges duly fixed with suitable wooden screw Complete all as specified , directed and shown on drawing.
128Removing of old unserviceable ply top,Supply and fixing in position with new top of 12mm thick Plywood BWR grade -AA of size 1974mm x 824mm duly fixed with 12 x Nos of 50mm long 8mm dia flat head nut , bolts and washers.Complete all as specified , directed and shown on drawing.
129Spot gas welding / Continous gas welding on all broken joints in lengths 1 CM Complete all as specified , directed and shown on drawing.
130Painting the frame of the Bed Ply Top Steel with one coat of black hammer tone paint with spray machine of approved quality after preparation of steel surface by sanding with sand emery paper and dusting the surface with clean cloth. The Bed Ply Top Steel frame shall be made smooth by applying metal putty on etched surface only where required Complete all as specified , directed and shown on drawing.
131Material and labour for painting to articles of steel furniture by adhering to following steps,Complete all as specified , directed and shown on drawing. :-a) The existing surface of each steel article shall be made smooth by peeling out the old paint by applying paint remover solution,filling metal putty to the uneven surfaces and sanding it again to make the surface smooth then wipe out the surface and remove the dust with a fine cloth.Two coats of Hammer tone paint to be done as per shade approved in each item shall be applied externally and internally to each article after applying and drying one coat of metal primer. b) The painting to each article shall only be carried out by spray machine only.c) The work will be excecuted at BSO FY/various units locations/residential accn or inside/outside restricted area as per user requirement.
132Almirah Large steel / Storewell, TP
133Almirah med steel with shelves / Storewell, TP
134Almirah small steel / Storewell, TP
135Book Case large Steel, FD-90M /1028/ 69 / TP
136Rack 6 Tier Steel Adjustable, FD- 106 / 106(M), 1038, TP
137Side rack with tray 3 spaces, FD-1023
138Stool Steel, FD-81 (M) Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56358970
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE 32 Lakhs
LAST DATE 29-07-2026
Authority
Authority Name Military Engineer Services
Work Description Tender for Repair And Painting Of The Steel Furniture And Maintenance Of Charpoy Gi Pipe And Tp Furniture Of Hq Sac (U), 17 Fbsu, 257 Su, 340 Tru Under Ge (Af) Trivandrum
Basic Detail
Tender No 8635
Bidding Type Tender
Location
City Thiruvananthapuram
State Kerala
Key Dates
Publish Date 08 Jul 2026
Submission Date 29 Jul 2026
Open Date 31 Jul 2026
Finance
Tender Value 32 Lakhs
Tender Fee 500
EMD 64000
Exemption Available
Document List
7fda5f21-5ade-48d8-9e39-d8fdbc9d0fba.html
BOQ_870413.xls
ps.pdf
Tendernotice_1 (4).pdf
tenderpgs.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 08, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 29, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 18 days
Jul 31, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 20 days

Tender Documents

Download All (ZIP) ↓
html

7fda5f21-5ade-48d8-9e39-d8fdbc9d0fba.html

xls

BOQ_870413.xls

pdf

ps.pdf

pdf

Tendernotice_1 (4).pdf

pdf

tenderpgs.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders