Tender For Construction Of Ht/Lt Line And Erection Of Distribution Transformer (Dtr) For Release Of New Connections Under 33/11 Kv Sub-Station D.P.H. Lohiyahad, Under Head Uerc / Capital S.I. Scheme, Including All Associated Works As Per Tender Speci
Tender Overview
Project Description
Tender for Construction Of Ht/Lt Line And Erection Of Distribution Transformer (Dtr) For Release Of New Connections Under 33/11 Kv Sub-Station D.P.H. Lohiyahad, Under Head Uerc / Capital S.I. Scheme, Including All Associated Works As Per Tender Specification.( Rates Quoted Without Gst) (Gst Will Paid Extra)
BOQ
| Sl. No. | Item Description |
| 1 | Work as per UPCL norms/ RESPO. |
| 2 | Erection of earthing rod complete in all respects as per UPCL specification |
| 3 | Fabrication of steel work including cutting, bending, welding etc. complete |
| 4 | Excavation of pit for stay set in all types of soil including dressing and disposal |
| 5 | Erection of LT stay set complete with all fittings as per specification |
| 6 | Erection of 11 KV stay set complete in all respects as per approved drawing |
| 7 | Grouting of stay set with cement concrete including curing complete |
| 8 | Excavation of pit for pole in all types of soil including disposal of earth |
| 9 | Erection of single PCC pole including alignment and fixing complete |
| 10 | Erection of PCC double pole structure complete with fittings and alignment |
| 11 | Grouting of pole with cement concrete including backfilling and compaction |
| 12 | Muffing of pole with cement concrete including finishing and curing |
| 13 | Dismantling of 16 KVA distribution transformer including safe lowering |
| 14 | Dismantling of 25 KVA distribution transformer complete in all respects |
| 15 | Dismantling of 63 KVA distribution transformer including handling and stacking |
| 16 | Dismantling of 100 KVA distribution transformer complete |
| 17 | Dismantling of 160 KVA distribution transformer including shifting |
| 18 | Dismantling of 250 KVA distribution transformer complete as directed |
| 19 | Dismantling of 400 KVA distribution transformer including loading/unloading |
| 20 | Installation of HT PRMC complete with all accessories |
| 21 | Installation of LT PRMC including termination and testing |
| 22 | Laying of 11 KV underground XLPE cable in trench with bedding and backfilling |
| 23 | Installation of 100 KVA DTR on pole structure complete |
| 24 | Installation of 63 KVA DTR on pole structure complete |
| 25 | Installation of 25 KVA DTR on pole structure complete |
| 26 | Installation of 100 KVA DTR on plinth including foundation work |
| 27 | Installation of 25 KVA DTR on plinth complete in all respects |
| 28 | Laying of Weasel conductor in HT line including stringing and sagging |
| 29 | Erection of 3 Phase 4 Wire LT line with Weasel conductor |
| 30 | Erection of 1 Phase 2 Wire LT line with Weasel conductor |
| 31 | Providing guarding of LT/11 KV line complete with safety arrangement |
| 32 | Providing T-off connection on 11 KV line complete with jumpering |
| 33 | Fixing of 11 KV XLPE jointing kit including testing and commissioning |
| 34 | Cartage of PCC poles (51–70 km lead) including loading/unloading |
| 35 | Cartage of petty material (51–70 km lead) |
| 36 | Cartage of 16/25 KVA DTR (51–70 km lead) |
| 37 | Cartage of 16/25 KVA DTR (71–100 km lead) |
| 38 | Cartage of 63 KVA DTR (51–70 km lead) |
| 39 | Cartage of 100 KVA DTR (51–70 km lead) |
| 40 | Cartage of 400/500 KVA DTR (51–70 km lead) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 14 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 14 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender