Public Administrative Department Local Bodies Closing in 6 days TDR #56354232

Tender For Mechanical And Electrical Repair Works Of Pumps, Motors, Transformers, Starters, Substations, Control Panels, Etc. From The Water Supply Department Of Chiplun Municipal Council On An Annual Rate Contract Basis.

Issued by Local Bodies · Ratnagiri, Maharashtra
Tender Value
20 Lakhs
Estimated cost
Bid Submission
15 Jul 2026
6 days left
EMD
20000
Bank guarantee accepted
Document Fee
3000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Ratnagiri → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Mechanical And Electrical Repair Works Of Pumps, Motors, Transformers, Starters, Substations, Control Panels, Etc. From The Water Supply Department Of Chiplun Municipal Council On An Annual Rate Contract Basis.

BOQ

Name of Work:- mechanical and electrical repair works of pumps, motors, transformers, starters, substations, control panels, etc. from the water supply department of Chiplun Municipal Council on an annual rate contract basis.
Sl. No. Item Description
1LED lamp 18 W
2LED lamp 35 W
3LED lamp 50 W
420W LED Tube light fitting (4 feet in length)
5LED Street light fitting 40W- 50 W IP65 &IK08 class
6Street light bracket made from 25 mm dia
72 core 6 sq. mm. aluminium
8Grease
9Gland Rope
10Supplying & erecting crimping type aluminium lugs for cable 70 sq mm complete
11Supplying & erecting crimping type aluminium lugs for cable 95 sq mm completecomplete
12Supplying & erecting crimping type aluminium lugs for cable 120 sq mm complete
13Supplying & erecting crimping type aluminium lugs for cable 185 sq mm complete
14Supplying & erecting crimping type aluminium lugs for cable 240 sq mm complete
15Supplying & erecting crimping type aluminium lugs for cable 300 sq mm complete
16Supplying, erecting & terminating 4 core 70 sq. mm. aluminium armoured cable
17Supplying, erecting & terminating 4 core 95 sq. mm. aluminium armoured cable
18Supplying, erecting & terminating 4 core 120 sq. mm. aluminium armoured cable
19Supplying, erecting & terminating 4 core 185 sq. mm. aluminium armoured cable
20Supplying, erecting & terminating 4 core 240 sq. mm. aluminium armoured cable
21Supplying, erecting & terminating 4 core 300 sq. mm. aluminium armoured cable
22Rewinding of electric motor of 1 H.P. three phase upto 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year. (The dismantled material shall be retained by the contractor.)
23Rewinding of electric motor of 2 H.P. three phase upto 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year. (The dismantled material shall be retained by the contractor.)
24Rewinding of electric motor of 3 H.P. three phase upto 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year. (The dismantled material shall be retained by the contractor.)
25Rewinding of electric motor of 5 H.P. three phase upto 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year. (The dismantled material shall be retained by the contractor.)
26Rewinding of electric motor of 10 H.P. three phase upto 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year. (The dismantled material shall be retained by the contractor.)
27Rewinding of electric motor of 60 H.P. three phase upto 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year. (The dismantled material shall be retained by the contractor.)
28Rewinding of electric motor of 200 H.P. three phase upto 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year. (The dismantled material shall be retained by the contractor.)
29Rewinding of electric motor of V.T. 120 H.P. three phase upto 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year. (The dismantled material shall be retained by the contractor.)
30Rewinding of electric motor of V.T. 150 H.P. three phase upto 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year. (The dismantled material shall be retained by the contractor.)
31Rewinding of electric motor of V.T. 170 H.P. three phase upto 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year. (The dismantled material shall be retained by the contractor.)
32Rewinding of submersible pump motor of 5 HP with coated copper wires & overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year. (The dismantled material shall be retained by the contractor.)
33Rewinding of submersible pump motor of 17.5 HP with coated copper wires & overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year. (The dismantled material shall be retained by the contractor.)
34Servicing, varnishing and greasing of 60 H.P. Motor
35Servicing, varnishing and greasing of 120 H.P. Motor
36Servicing, varnishing and greasing of 150 H.P. Motor
37Servicing, varnishing and greasing of 170 H.P. Motor
38Servicing, varnishing and greasing of 200 H.P. Motor
39Replacing the existing bearing of approved make for electric motor of 1 H.P. of all types with due alignment of the shaft and tested.
40Replacing the existing bearing of approved make for electric motor of 2 H.P. of all types with due alignment of the shaft and tested.
41Replacing the existing bearing of approved make for electric motor of 7.5 H.P. of all types with due alignment of the shaft and tested.
42Replacing the existing bearing of approved make for electric motor of 10 H.P. of all types with due alignment of the shaft and tested.
43Replacing the existing bearing of approved make for electric motor of 12.5H.P. of all types with due alignment of the shaft and tested.
44Replacing the existing bearing of approved make for electric motor of 17.5H.P. of all types with due alignment of the shaft and tested.
45Replacing the existing bearing of approved make for electric motor of 60 H.P. of all types with due alignment of the shaft and tested.
46Replacing the existing bearing of approved make for electric motor of 120 H.P. of all types with due alignment of the shaft and tested.
47Replacing the existing bearing of approved make for electric motor of 150 H.P. of all types with due alignment of the shaft and tested.
48Replacing the existing bearing of approved make for electric motor of 170 H.P. of all types with due alignment of the shaft and tested.
49Replacing the existing bearing of approved make for electric motor of 200 H.P. of all types with due alignment of the shaft and tested.
50Replacing the existing bearing of approved make for pump of 5 H.P. of all types with due alignment of the shaft and tested.
51Replacing the existing bearing of approved make for pump of 12.5 H.P. of all types with due alignment of the shaft and tested.
52Replacing the existing bearing of approved make for pump of 17.5 H.P. of all types with due alignment of the shaft and tested.
53Replacing the existing bearing of approved make for pump of 60 H.P. of all types with due alignment of the shaft and tested.
54Replacing the existing bearing of approved make for pump of120 H.P. of all types with due alignment of the shaft and tested.
55Replacing the existing bearing of approved make for pump of 150 H.P. of all types with due alignment of the shaft and tested.
56Replacing the existing bearing of approved make for pump of 170 H.P. of all types with due alignment of the shaft and tested.
57Replacing the existing bearing of approved make for pump of 200 H.P. of all types with due alignment of the shaft and tested.
58Supplying and erecting Starter for 0.75 H.P.Motor
59Supplying and erecting Starter for 1.5 H.P.Motor
60Supplying and erecting Starter for 3.5 H.P.Motor
61Supplying and erecting Starter for 5 H.P.Motor
62Supplying and erecting contactor for star Delta Motor Starter of 60 H.P.
63Supplying and erecting contactor for star Delta Motor Starter of 150 H.P.
64Supplying and erecting contactor for star Delta Motor Starter of 170 H.P. to 200 H.P. AX300-30
65Supplying, erecting & marking MCCB of 630A DN-3 4 P
66Supplying, erecting & marking MCCB of 800A T6N 4 P
67Supplying & erecting relay for Star Delta Motor Starter of 120 H.P.
68Supplying & erecting relay for Star Delta Motor Starter of 150 H.P.
69Supplying & erecting relay for Star Delta Motor Starter of 170 H.P.
70Supplying & erecting relay for Star Delta Motor Starter of 200 H.P.
71Supplying & erecting timer for Star Delta Motor Starter of all H.P.
72Supplying & erecting of any size electrolyte copper patti or bar in bus bar chamber in panel or any other purpose, 500V with require capacity with 99.9% copper purity with fixing arrangement (like lug or bottle type lug) to both the end with high grade polyolefin insulation sleeve.
73Supplying & erecting of any size electrolyte copper patti or bar in bus bar chamber in panel or any other purpose, 500 V with require capacity with 99.9% copper purity with fixing arrangement (like lug or bottle type lug) to both the end with high grade polyolefin insulation sleeve.
74Supplying and erecting copper strip of required size used for earthing on wall and/or any other purpose with necessary copper clamps fixed on wall painted with bituminous paint in an approved manner with joints required.
75Supplying and erecting current transformer coil with insulation
76Supplying and erecting of digital voltmeter of all type starter
77Supplying and erecting of digital ammeter of all type starter
78Providing, erecting pressure gauge of hquied range complete with syphone tube, isolating vock suitable for 12 mm dia G.Z. pipe and oil changing of all
79Rewinding and oil changing of all starter auto transformer
80Supplying and electing Auto transformer of all starter.
81Servicing & greasing of AB switch
82Supplying and erecting 200 amp main switch
83Supplying and erecting 250 amp main switch
84Supplying and erecting 400 amp main switch
85Fuse wire 100 amp 60 gauge
86Supplying and erecting of backlight plate
87Supplying and erecting base plate 200 amp
88Supplying and erecting of contractor kit of all starter
89Supplying and erecting of OCB
90Supplying and erecting of OCB coil
91Supplying and erecting of moving tip contact assembly
92Supplying and erecting of moving tip contractor
93Supplying and erecting of 200 amp IC cut –out witch
94Supplying and erecting of transformer packing
95Supplying and erecting of HT/LT stud
96Supplying and erecting of air breather
97Supplying and erecting bank of all polyproistence capacitors
98Supplying, erecting and giving test and trail of 60 H.P. Stuffing box
99Supplying, erecting and giving test and trail of 120 H.P. Stuffing box
100Supplying, erecting and giving test and trail of 150 H.P. Stuffing box
101Supplying, erecting and giving test and trail of 170 H.P. Stuffing box
102Supplying, erecting and giving test and trail of 200 H.P. Stuffing box
103Supplying, erecting and giving test and trail of 60 H.P. shaft
104Supplying, erecting and giving test and trail of 120 H.P. shaft
105Supplying, erecting and giving test and trail of 150 H.P. shaft
106Supplying, erecting and giving test and trail of 170 H.P. shaft
107Supplying, erecting and giving test and trail of 200 H.P. shaft
108Supplying, erecting and giving test and trail of 60 H.P.connection plate
109Supplying, erecting and giving test and trail of 120 H.P.connection plate
110Supplying, erecting and giving test and trail of 150 H.P.connection plate
111Supplying, erecting and giving test and trail of 170 H.P.connection plate
112Supplying, erecting and giving test and trail of 200 H.P.connection plate
113Supplying, erecting and giving test and trail of gland sleeve of all pump
114Supplying, erecting alighnment and giving test and trail of Ampiler Sleeve 10 to 17 H.P. Submercible pump.
115Supplying, erecting alighnment and giving test and trail of tyre coupling 60 H.P.pump
116Supplying, erecting alighnment and giving test and trail of coupling 200 H.P.pump
117Supplying, erecting alighnment and giving test and trail of coupling bush stud 200 H.P.pump
118Spider Bush for 150 Hp Pump
119Alighnment of pump motor of 200 HP
120Supplying and erecting of lock of panel, starter etc
121Oil paper
122Dismantling of 10 H.P. Pump
123Dismantling of 17.5 H.P. Pump
124Dismantling of 60 H.P. Pump
125Dismantling of 120 H.P. Pump
126Dismantling of 150 H.P. Pump
127Dismantling of 170 H.P. Pump
128Dismantling of 200 H.P. Pump
129Assembling with over oiling of 10 H.P.Pump
130Assembling with over oiling of 17.5 H.P.Pump
131Assembling with over oiling of 60 H.P.Pump
132Assembling with over oiling of 120 H.P.Pump
133Assembling with over oiling of 150 H.P.Pump
134Assembling with over oiling of 170 H.P.Pump
135Assembling with over oiling of 200 H.P.Pump
136Pole clamp MS flat for pole or pipe with nut bolts
137Nut Bolts TVS
138Supply of 3307 A bearing for College Pump
139Supply of 6307 2Z bearing for College Pump
140Supply of NU 320 ECM C3 Filter Motor bearing 200 hp pump house Kherdi
141Supply of 7322 BECBM Malewadi motor bearing 150 hp Pump
142Supply of 6318 C3 bearing for filter 200 hp pump
143Supply of 7320 BECBM bearing for 150 HP Gowalkot
144Supply of NU 313 ECM bearing for Filter pump house
145Supply of 6316 C3 bottam bearing Kherdi pump
146Supply of 6318 C3 Bottam bearing Kherdi filter
147Supply of 6308 2Z bearing for College Motor
148Supply of 6309 2Z bottam Bearing Malewadi
149Supply of 10 Hp submercible pump Thirst Bearing
150Providing & erecting floor/wall mounting, MCCB panel board, with door, suitable for four pole incoming 400A, 2 ways four pole outgoing, up to 100 A MCCBs on iron frame, as per specification no. SW-SWR/MCCBPB. (Excluding MCCBs) PWD DSR (2022-23) 5-7-6
151Providing & erecting floor/wall mounted MCCB panel board, with door, suitable for four pole incoming 250A, 2 ways four pole outgoing, up to 100 A MCCBs on iron frame, as per specification no SW-SWR/MCCBPB. (Excluding MCCBs) PWD DSR (2022-23) 5-7-1
152Supplying and topping up filtered transformer oil of approved make with test certificate PWD DSR (2022-23) 5-7-2
153Filteration of Transformer oil on site till satisfactory test results PWD DSR (2022-23) 5-7-1
15410 HP Submersible Pump 150 mm dia (with Bronze / Stainlesssteel(CF8M) Impeller) up to 12 stages MJP SSR 2023-24 PM 1-2-10
155Supplying & erecting four pole ON LOAD change over switch, 415V, 400A, open execution having staggered termination, phase barrier, shroud termination and terminal cover along with auxiliary contacts and ready to upgrade with fuseprotection kit, rotary handle, operational current category AC23A complying toIS/IEC 60947-3 Part-1/3. PWD DSR (2022-23) 5-1-8
156Supplying & erecting four pole ON LOAD change over switch, 415V, 200A, open execution having staggered termination, phase barrier, shroud termination and terminal cover along with auxiliary contacts and ready to upgrade with fuseprotection PWD DSR (2022-23) 5-1-6
157Supplying & erecting flat flexible 3 core 6 sq.mm PVC sheathed submersible type copper cable suitably clamped at fixed intervals with column pipe assembly complete. PWD DSR (2022-23) 12-4-10
158Providing earthing with copper earth plate size 60 x 60 x 0.315 cm with funnel with a wire mesh for watering and brick masonry block C.l. cover with minimum 25 kg Carbon based environment friendly back fill Ground Enhancing compoundcomplete with all materials, testing & recording the results as per specification no ESE -LA PWD DSR (2022-23) 9-1-6
159Supplying & recting submersible pump set suitable for erection on open well of 3.75 KW/5HP with 415V 50C/S AC supply, having delivery head from 36 to 18 m and discharge from 400 to 1000 litres per minute & pipe of suction 80mm/delivery 80 mm diameter erecting with necessary H type Clamps as per Specification no. WP-OSP MJP SSR 2023-24 1-1-5
160Supplying & erecting D.O.L Starter suitable for 415 V, 3 phase 50 cycles with no volt coil and overload element with necessary materials and connected to supply PWD DSR (2022-23) 2-4-3 Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56354232
AUTHORITY Local Bodies
TENDER VALUE 20 Lakhs
LAST DATE 15-07-2026
Authority
Authority Name Directorate Of Municipal Administration
Work Description Tender for Mechanical And Electrical Repair Works Of Pumps, Motors, Transformers, Starters, Substations, Control Panels, Etc. From The Water Supply Department Of Chiplun Municipal Council On An Annual Rate Contract Basis.
Basic Detail
Tender No CMC/Water Supply/56/2026-27
Bidding Type Tender
Location
City Ratnagiri
State Maharashtra
Key Dates
Publish Date 08 Jul 2026
Submission Date 15 Jul 2026
Open Date 16 Jul 2026
Finance
Tender Value 20 Lakhs
Tender Fee 3000
EMD 20000
Exemption Not Available
Document List
Tendernotice_1 (27).pdf
6f255935-be4c-4736-aed9-2c554ece5bef.html
BOQ_2255520.xls
NIT56.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 08, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 15, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 6 days
Jul 16, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 7 days

Tender Documents

Download All (ZIP) ↓
pdf

Tendernotice_1 (27).pdf

html

6f255935-be4c-4736-aed9-2c554ece5bef.html

xls

BOQ_2255520.xls

pdf

NIT56.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders