Tender For General- M&M Festival 1202-Sdp Sabarimala Envtl -Operation And Overhauling Of Sewage Treatment Plant For Monthly Pooja And Temple Opening Days From September 2026 To October 2027 Including M&M Festival Of 1202 Me -General Civil Work
Tender Overview
Project Description
Tender for General- M&M Festival 1202-Sdp Sabarimala Envtl -Operation And Overhauling Of Sewage Treatment Plant For Monthly Pooja And Temple Opening Days From September 2026 To October 2027 Including M&M Festival Of 1202 Me -General Civil Work
BOQ
| Sl. No. | Item Description |
| 1 | Appendix-I Overhauling STP & Replacement of Defective equipments |
| 2 | OD61068/2026-2027:Supply, installation, and calibration of level sensors in the equalization tank, ensuring accurate and reliable measurement of liquid levels under varying operating conditions. The task also involves integrating these sensors with the existing SCADA (Supervisory Control and Data Acquisition) system so that real-time readings are available for monitoring, alarms, and process control. Proper installation will cover mechanical mounting, electrical connections, and signal cabling, followed by calibration to verify precision and consistency of measurements. Once integrated, the SCADA system should display and record sensor data, Additionally, the supplied sensors will be backed by a minimum 12 month manufacturers warranty, covering defects in materials and workmanship to guarantee performance and reliability. |
| 3 | OD61069/2026-2027:Supply and installation of starter for 35 hp three-phase submersible pump fully automatic star delta (FASD) unit designed for 415v, 50hz ac operation. The starter must be equipped with an adjustable thermal or electronic overload relay, typically within the 30a to 50a range, and must include a triple pole mcb or mccb rated at 100a for robust short-circuit protection. Essential safety features should include a built-in single phasing preventer (spp), phase reversal protection, and under-voltage/over-voltage cutouts to safeguard the motor during power fluctuations. The unit must be housed in a durable, powder-coated, dust-proof enclosure with an ip54 or higher rating, featuring integrated monitoring instruments such as an ammeter and voltmeter. All components must comply with IS/IEC 60947 standards and be backed by a minimum 12-month manufacturer warranty |
| 4 | OD393155/2025-2026:Labour charges for checking and carrying out necessary repairs of the SCADA system at STP Sabarimala include comprehensive inspection and servicing to ensure perfect and trouble free operation of all switches, pumps, motors, valves, and visual monitors connected to the treatment plant. The scope covers preventive maintenance such as calibration of sensors, troubleshooting of alarms, rectification of communication faults, and updating of SCADA software as required. It also includes immediate attention to breakdowns of equipment controlled via SCADA, correction of logic errors, and verification of interlocks and safety circuits. The rate further covers all software related repairs and continuous support throughout the festival period, ensuring uninterrupted and reliable functioning of the STP under the direction of the Engineer in Charge. |
| 5 | OD393157/2025-2026:Blower Overhauling charges as per the direction of Engineer in charge, including dismantling, inspection, cleaning, replacement of worn parts, changing of lubricating oil, changing of belts, reassembly, and testing to ensure proper performance |
| 6 | OD393158/2025-2026:Blower Starter Service (Blower 2 & 3) 75 kW / 100 HP, including isolation, inspection, cleaning, servicing/replacement of contactors, relays, overload protection, wiring checks, lubrication, testing, commissioning, and submission of service report as per the direction of Engineer-in-Charge. |
| 7 | OD393159/2025-2026:Decanter movement mechanism and gear system overhauling & servicing charges, including dismantling, inspection, cleaning, replacement of worn parts, lubrication with grease , reassembly, testing, and commissioning as per the direction of Engineer-in-Charge |
| 8 | OD393163/2025-2026:Submersible Pump Set (35 HP) Overhauling & Servicing Charges including dismantling, inspection, replacement of worn parts, electrical testing, reassembly, installation, and commissioning |
| 9 | OD62788/2026-2027:Overhauling of safety level sensors which involves inspection of the magnetic sensor and control relay for wear, damage, or malfunction; cleaning of the sensor and relay components to remove dust, debris, or contaminants; testing of the 24 VDC PNP NO magnetic sensor and the 14-pin control relay with relay base to verify proper functionality; and replacement of faulty parts, including the relay or sensor, with compatible components as required. |
| 10 | Appendix-II Part A -Monthly Pooja 2026 september to 0ctober 2026 Operation of STP 20 days |
| 11 | OD393169/2025-2026:Operators ( SCADA ) (Should be a diploma /ITI holder (minimum) and have a minimum of one year of experience in the operation of sewage treatment plants or Effluent treatment plants. Should be familiar with the concept of anaerobic and aerobic water treatment processes. An educational certificate, as well as an experience certificate of the operators, should be submitted by the contractor. Days 4 Operator per day(2Nos /shift) 20 days |
| 12 | OD33841/2026-2027:Supply of hypochlorite80GPL(50 Litre per day) for 20 days 1000 litres (Actual consumption as per site condition) |
| 13 | Appendix II Part-B M&M Festival 1202ME (Operation of of STP For 75 days) |
| 14 | OD34062/2026-2027:A technician (electrical) should be a certified electrician and should be able to rectify the issue in blowers, pump sets, and other electrical components with any delay (1 no./day). |
| 15 | OD34066/2026-2027:Operators ( SCADA ) (Should be a diploma /ITI holder (minimum) and have a minimum of one year of experience in the operation of sewage treatment plants or Effluent treatment plants. Should be familiar with the concept of anaerobic and aerobic water treatment processes. An educational certificate, as well as an experience certificate of the operators, should be submitted by the contractor. 6 Operator per day( 2Nos /shift) 3 shift 75 days |
| 16 | OD34070/2026-2027:Supply of hypochlorite 80 GPL (200 liters per day) for 75 days, liters (Actual consumption as per site condition) (75*200=15000) |
| 17 | Appendix II Part-C Monthly pooja 2027 february to October operation of stp for 87 days |
| 18 | OD40934/2026-2027:Operators ( SCADA ) (Should be a diploma /ITI holder (minimum) and have a minimum of one year of experience in the operation of sewage treatment plants or Effluent treatment plants. Should be familiar with the concept of anaerobic and aerobic water treatment processes. An educational certificate, as well as an experience certificate of the operators, should be submitted by the contractor. Days 4 Operator per day(2Nos /shift) 85 days |
| 19 | OD40952/2026-2027:Supply of hypochlorite 80 GPL (50 litres per day) (actual consumption as per site condition) |
| 20 | Appendix III -Changing the damaged pipeline |
| 21 | 10.25.2:Item Shifted to Sub head 14 as item 14.73Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 22 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work |
| 23 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil |
| 24 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 25 | OD62106/2026-2027:Providing and fixing PVC pipes including fixing the pipe with clamps/clips at 1.00 m spacing. This includes jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 160 mm dia 6 Kgf/cm2 - External work - Exposed on wall(Data based on 50.18.9.19.2) |
| 26 | OD62249/2026-2027:Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement - 150 mm dia long Bend (6 kgf) |
| 27 | OD62582/2026-2027:Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement - 150 mm dia Bend 45 degree (6 kgf) |
| 28 | Appendix IV wires for changing Starters of Submercible pumps to SCADA room |
| 29 | OD62545/2026-2027:24/0.20 sqmm three core ISI Marked FR LS PVC sheathed round copper conductor cable |
| 30 | OD62546/2026-2027:495/0.30 sqmm three core ISI Marked FR LS PVC sheathed flat copper conductor cable Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 11 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 12 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender