Tender For Repair/ Maintenance To Runway,Taxi Track, Main Dispersal, , Joint Filling , Crack Repair, Repair To Runway Drain And Other Connected Work At Af Stn Gorakhpur Under Ge(Af) Gorakhpur.
Tender Value
35 Lakhs
Estimated cost
Bid Submission
27 Jul 2026
18 days left
EMD
70000
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Gorakhpur → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Repair/ Maintenance To Runway,Taxi Track, Main Dispersal, , Joint Filling , Crack Repair, Repair To Runway Drain And Other Connected Work At Af Stn Gorakhpur Under Ge(Af) Gorakhpur.
BOQ
| Sl. No. | Item Description |
| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Garrison Engineer (AF) Gorakhpur Name of Work: Repair/ maint to Runway,Taxi track, Main Dispersal, , joint filling , crack repair, repair to Runway drain and other connected work at AF Stn Gorakhpur under GE(AF) Gorakhpur. Contract No.: GE(AF)/GKP/E-26 OF 2026-27 File No. 9464/E8 Serial Page No.15 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Description of item Item Code / Make Quantity Units Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e. DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit, if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes inRs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | Material and Labour for preparation of old painted concrete/bitumen surfaces with washing down soap water of runway, taxi track road for painting with cold retro-reflective paint including spreading of 500micron size glass beads (350gms/Sqm) by using mechanical mode of application as lines, dashes, arrows, letters applying one coat of runway road marking paint aqua based retroreflective type golden, yellow, black, orange or white colour as approved by Garrison Engineer to give uniform finish complete all as specified and directed. Make: Asian Paint Apcotrak-WBR or equivalentNote :- (i) Masking tape/ steel/ wooden frame or template should be used on edges of paints before painting work and removed the masking tape after paint is applied where ever required and as directed by Engineer-in-Charge. The contractor has to ensure that, the lines, dashes etc marked with paint shall be in proper shape and finish as required. Any errorneous marking shall be make good by the contractor on his own cost and nothing extra shall be paid on this account. |
| 3 | Material and Labour for preparation of old painted concrete/bitumen surfaces with washing down soap water of runway, taxi track road for painting with mechanical mode of application as lines, dashes, arrows, letters and applying one coat of runway road marking paint aqua based golden, yellow, black, orange or white colour as approved by Garrison Engineer to give uniform finish complete all as specified and directed. Note :- (i) Masking tape/ steel/ wooden frame or template should be used on edges of paints before painting work and removed the masking tape after paint is applied where ever required and as directed by Engineer-in-Charge. The contractor has to ensure that, the lines, dashes etc marked with paint shall be in proper shape and finish as required. Any errorneous marking shall be make good by the contractor on his own cost and nothing extra shall be paid on this account. |
| 4 | M&L for preparing of existing concrete surfaces / plastered / unplastered surface of wall and applying one coat of synthetic enamel paint in red and white with alternate square/ rectangular panel in runway / link / dispersal / PQC/ side wall area all as directed by Engineer-in Charge. |
| 5 | M&L for one coat of black synthetic enamel paint on three sides of DTGM (1.20 x 1.50 Mtr) installed in airfield area consisiting of black synthetic enamel paint background and red colour high intensity retro reflective tape numerical/alphabet letter (150mm width and 1000mm height) on two sides complete all as specified and directed. |
| 6 | Cutting of existing Runway/taxi tracks at cracks and at spalled edges mechanical tools making groove at edges cleaning through air blower/air blastisng and applying propriety primer on the cleaned surfaces to obtain tack and finally filling in ELASTOMERIC CONCERETE of make Choksey Chemicals/CIPY/BASF or equivalent (prepared by mixing part A, part B and adding fiberglass sand all as per manufactureres instructions) and properly mixing in purpose made mixer plant electrically operated) to obtain a homogeneous mix and finally tooling the surface with hand tools to obtain a grooved textured finish. Note: (i) The rate shall include for providing masking tape at joints and form work required if any at spalled joints edges. (ii) The quoted rate deemed to include for making good the disturbed joint filling around the area where material is applied. (iii) All material shall only be procured directly from manufacturer. |
| 7 | Supplying, and fix in repair visible retro-reflective sign boards of made from 3 mm thick engineering grade plastic (acrylic sheet) having monolithic structure to withstand temprature variations from cold environment to sweltering hot conditions and to withstand high velocity winds frmaed and braced with 50 mm dia PVC pipe best quality to with stand high ground level with best quality structure including fixing of the same in existing post hole as required, including providing / applying weather resistance coating, providing and pasting of new numerals/alpahbets with retro reflective tape cutting it as computer plotter etc complete all as specified and directed by Garrison Engineer/ Engr-in-Charge. |
| 8 | M&L for forming contraction (Dummy) joints 65mm deep and 10mm wide filled with sealing compound Grade 'B', complete all asspecified and directed.Note :-1. Material obtained from removing of existing filled up materials shall be removed from out side MOD land. 2. Rates are including for cleaning,cutting of existing treatment by machinical means like compressed air and machnical cutting of joints |
| 9 | M & L for forming construction joints 30 mm deep and 10 mm wide filled with sealing compound Grade 'B', complete as specified and directedNote :-1. Material obtained from removing of existing filled up materials shall be removed from out side MOD land. 2. Rates are including for cleaning,cutting of existing treatment by machinical means like compressed air and machnical cutting of joints |
| 10 | M&L for forming 20mm thick expansion joints filled with pre-formed bituminous filler and top 30mm primed and sealed with sealing compound Grade 'B', complete all asspecified and directed.Note :-1. Material obtained from removing of existing filled up materials shall be removed from out side MOD land. 2. Rates are including for cleaning,cutting of existing treatment by machinical means like compressed air and machnical cutting of joints |
| 11 | Cutting of grass, bush, weeds/ vegetation by using mechanical means like tractor with Straw Reeper alongwith grass Collecting trolley and cutting 50 mm to 100 mm or above Straw Reeper where ever required including collecting the grass through mechanical tools like grass collecing Trolley and removing material obtain from cutting/cleaning (both side) up to 100m from the concrete edges. Size of Straw Reeper attached with tractor and Trolley shall be 5-6 feet, complete all as specified and directed. Note:- (i) Contractor will arrange his own mechanical straw reeper (set of one tractor with Straw Reeper alongwith grass Collecting trolley) with POL & MT driver. (ii) The quoted rate by contractor is including of all T&P, POL and operator mentioned above.(iii). On requirement contractor shall arrange more than one tractor with Straw Reeper alongwith grass Collecting trolley per day as per order and T&P should not be more than 5 year vintage. Also T&P should be at par with AirForce Requirement, if not the same can be modified to meet the requirement of the Stn. |
| 12 | Material and labour for cutting of grass, shurbs, vegetation, bush, weed by brush cutter operated slasher where ever required including cleaning the both sides edges of runway / PTT removing of materials obtained from cutting to out side of MOD land complete all as specified and directed by Garrison Engineer/ Engr-in-Charge.Note :- (i) The contractor shall arrange atleast two brush cutter machine alongwith operator and one helper for each brush cutter including POL etc. The working hours shall be counted for each brush cutter seperately.(ii) Site/area of grass cutting shall be handed over as and when on requirement basis. Contractor shall start the work immediately whenever site is handed over to him.(iii) A log book shall be maintained by JE(Civil) and the same shall be signed by Engineer-in-Charge & contractor daily for the purpose of calculating daily working hours which shall be actual mode of payment. |
| 13 | Cutting/Scarping grass, bush, weeds or vegetation on the edges of runway/PTT/roads manually and removing material out side MOD land obtained from cutting and cleaning both side runway, PTT, near DTGM board complete all as specified and directed. Note :- (i) Grass shall be cut and finished 10 mm to 25 mm above the existing ground level.(ii) All foreign materials (stone pieces etc) obtained during cutting of grass shall be removed from out side MOD land.(iii) Materials obtained from cutting of grass shall be removed out side of MOD land |
| 14 | M&L for repair to broken/ demage portion of concrete slab or pavement ofsurface area not exc. 1.00 Sqm by cutting damaged portion to slab/ spoil edges totriangular/ rectangular cross section and removing all loose and foreign materials and depositing the same to out side MoD land and cleaning the surface by compressed air toremove all dust, durt etc and washing with hydrochloric acid and filling epoxy resin mortar after application of epoxy primer as permanufacture instructions bull nosing the edges complete all as specified and directed.Note:- Material obtained from damaged portion to concrete slab shall be removed from outside MoD land. |
| 15 | M&L for repair to broken/ demage portion of concrete slab or pavement ofsurface area exc. 1.00 Sqm by cutting damaged portion to slab/ spoil edges totriangular/ rectangular cross section and removing all loose and foreign materials and depositing the same to out side MoD land and cleaning the surface by compressed air toremove all dust, durt etc and washing with hydrochloric acid and filling epoxy resin mortar after application of epoxy primer as permanufacture instructions bull nosing the edges complete all as specified and directed.Note:- Material obtained from damaged portion to concrete slab shall be removed from outside MoD land. |
| 16 | Ploughing of Soft Ground Arrestor (SGA) area with tractor of minimum 30 HP capacity alongwith Cultivator/ other tools for depth not less than 25cm complete all as specified and directed. Note:- (i) Contractor will arrange his own Tractor and cultivator with POL & MT driver as per requirement of Air Field. The requirement shall be intimated to contractor in advance. (ii) The rate quoted rate by contractor is including of all T&P, POL and operator mentioned above.(iii). T&P should not be more than 5 year vintage. Also T&P should be at par with AirForce Requirement, if not the same can be modified to meet the requirement of the Stn. |
| 17 | Material and labour for removal of down filled earth from drain and cleaning the bottom and side drain from mud vegetation and preapared the surface for smooth flow of water etc and removing the roots ,vegetation and mud up to 50 mtr from the periphery of the area complete all as directed by Garrison Engineer/ Engr-in-Charge. Note :- To determine the depth of sludge levels initially and after cleaning of drain shall be taken and recorded in MB duly signed by, Garrison Engineer, Engineer - in Charge and contractor. Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 07, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedJul 27, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 18 daysJul 30, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 21 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender