Supply Of Supply, installation and commissioning of CNC under floor wheel lathe (BG) with Shed , Shunter plus Winch machine on Turnkey basis as per section-I and II of Specification No. IR/CNC-UFWL(BG)/2026
Tender Overview
Project Description
Supply Of supply, installation and commissioning of cnc under floor wheel lathe (bg) with shed , shunter plus winch machine on turnkey basis as per section-i and ii of specification no. ir/cnc-ufwl(bg)/2026 , supply, installation and commissioning of cnc under floor wheel lathe (bg) with shed , shunter plus winch machine on turnkey basis as per section-i and ii of specification no. ir/cnc-ufwl(bg)/2026 [ warr anty period: 24 months after the date of delivery ] ] , foundation, installation, testing , commissioning and proving test etc has to be done by successf ul bidder as per clause 11 and 12 of section-ii of specification no. ir/cncufwl(bg)/2026 ] , concomitant works to be carried out by successful bidder as per clause-4.2.2 of section- i of spe cification no. ir/cnc-ufwl(bg)/2026 ] , preventive maintenance during 1st & 2nd year of warranty period has to be done by the successf ul bidder ] , all concomitant accessories has to be supplied by successful bidder as per clause-4.2 ( 4.2.1.1 t o 4.2.1.20 ) of section-i of specification no. ir/cnc-ufwl(bg)/2026. [ warranty period: 24 months after the d ate of delivery ] ]
BOQ
| Sl. No. | Item Description |
|---|---|
| 1 | Supply, installation and commissioning of CNC under floor wheel lathe (BG) with Shed , Shunter plus Winch machine on Turnkey basis as per section-I and II of Specification No. IR/CNC-UFWL(BG)/2026 [ Warr anty Period: 24 Months after the date of delivery ] ] |
| 2 | Foundation, Installation, Testing , commissioning and proving test etc has to be done by successf ul bidder as per Clause 11 and 12 of Section-II of Specification No. IR/CNCUFWL(BG)/2026 ] |
| 3 | Concomitant works to be carried out by successful bidder as per Clause-4.2.2 of Section- I of Spe cification No. IR/CNC-UFWL(BG)/2026 ] |
| 4 | Preventive Maintenance during 1st & 2nd year of Warranty Period has to be done by the successf ul bidder ] |
| 5 | All concomitant accessories has to be supplied by successful bidder as per Clause-4.2 ( 4.2.1.1 t o 4.2.1.20 ) of Section-I of Specification No. IR/CNC-UFWL(BG)/2026. [ Warranty Period: 24 Months after the d ate of delivery ] ] |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 22 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender