Power Government Departments Closing in 3 days TDR #56341986

Tender For Tender For Repair And Replacement Of 11 Kv Ht Line At Various Locations In Section Sach And Shour Esd Sach Pved Killar Op Circle Hpsebl Dalhousie.

Issued by Government Departments · Chamba, Himachal Pradesh
Tender Value
9.92 Lakhs
Estimated cost
Bid Submission
15 Jul 2026
3 days left
EMD
9924
Bank guarantee accepted
Document Fee
590
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Chamba → Himachal Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Tender For Repair And Replacement Of 11 Kv Ht Line At Various Locations In Section Sach And Shour Esd Sach Pved Killar Op Circle Hpsebl Dalhousie.

BOQ

Name of Work:- Tender for repair and replacement of 11 KV HT line at various locations in section Sach and Shour ESD Sach PVED Killar OP circle HPSEBL Dalhousie.
Sl. No. Item Description
1Supply Part-Tender for R/R of 11kV HT Line from 2x450 KW MHEP sach to village parmar Bhatori damaged due to heavy snowfall and landslides in (E) Section sach under Electrical Sub-Division HPSEBL sach.
2ACSR conductor 6/1/3.35mm (Rabbit)
3Steel Tubular Pole 9 Mtr Long
4RCC Muff with Concrete Filling
5Cross Arm [ Channel Iron (100×50×6mm],Length: 1270mm i/c tolerance of 100 mm either side)× 2 structure
6Angle Iron (50×50×6mm), Length: 750mm×2 No×2 structures
7Pole Top Bracket [MSCI:100*×50*×6mm-100mm
811kV Pin Insulators (Porcelain,12kV,10KN):3 No per pole structure
9Belt set -MS Angle Iron :50×50×6 Length:1800mm×2 No
10X-Bracing Set -MS Angle Iron 50×50×6, length:2125mm×2No
11X-Arm (Horizontal)-MS Channel Iron C type: 100×50×6 Length:2340mm×2 No]
12Discs insulator sets on Dead End structures complete in all respect
13Stay set complete in all respect
14Stay wire (7/3.15mm) (10.0kg per stay set)
15Half clamps:
16Full clamps:
17Danger Plate (250×200×1.6mm)
18Nuts and Bolts of various sizes
19Red Oxide paint
20Aluminium Paint
21Removal of old conductor from insulator & De-Stringing (420 + 5110) = 5530
22Erection of tilted S/T pole 9 mtr. Long
23Re-sagging, stringing & binding insulator of conductor size (50 mm) (10011 + 638) = 10649
24Erection Part-Tender for R/R of 11kV HT Line from 2x450 KW MHEP sach to village parmar Bhatori damaged due to heavy snowfall and landslides in (E) Section sach under Electrical Sub-Division HPSEBL sach.
25ACSR conductor 6/1/3.35mm (Rabbit)
26Steel Tubular Pole 9 Mtr Long
27RCC Muff with Concrete Filling
28Cross Arm [ Channel Iron (100×50×6mm],Length: 1270mm i/c tolerance of 100 mm either side)× 2 structure
29Angle Iron (50×50×6mm), Length: 750mm×2 No×2 structures
30Pole Top Bracket [MSCI:100*×50*×6mm-100mm
3111kV Pin Insulators (Porcelain,12kV,10KN):3 No per pole structure
32Belt set -MS Angle Iron :50×50×6 Length:1800mm×2 No
33X-Bracing Set -MS Angle Iron 50×50×6, length:2125mm×2No
34X-Arm (Horizontal)-MS Channel Iron C type: 100×50×6 Length:2340mm×2 No]
35Discs insulator sets on Dead End structures complete in all respect
36Stay set complete in all respect
37Stay wire (7/3.15mm) (10.0kg per stay set)
38Half clamps:
39Full clamps:
40Danger Plate (250×200×1.6mm)
41Nuts and Bolts of various sizes
42Red Oxide paint
43Aluminium Paint
44Removal of old conductor from insulator & De-Stringing (420 + 5110) = 5530
45Erection of tilted S/T pole 9 mtr. Long
46Re-sagging, stringing & binding insulator of conductor size (50 mm) (10011 + 638) = 10649
47Supply Part-Tender for R/R of 11kV HT Line from Shour to Purthi damaged due to heavy snowfall and landslides in (E) Section Shour under Electrical Sub-Division HPSEBL Sach.
48ACSR conductor 6/1/3.35mm (Rabbit)
49Steel Tubular Pole 9 Mtr Long
50RCC Muff with Concrete Filling
51Cross Arm [ Channel Iron (100×50×6mm],Length: 1270mm i/c tolerance of 100 mm either side)× 2 structure
52Angle Iron (50×50×6mm), Length: 750mm×2 No×2 structures
53Pole Top Bracket [MSCI:100*×50*×6mm-100mm
5411kV Pin Insulators (Porcelain,12kV,10KN):3 No per pole structure
55Belt set -MS Angle Iron :50×50×6 Length:1800mm×2 No
56X-Bracing Set -MS Angle Iron 50×50×6, length:2125mm×2No
57X-Arm (Horizontal)-MS Channel Iron C type: 100×50×6 Length:2340mm×2 No]
58Discs insulator sets on Dead End structures complete in all respect
59Stay set complete in all respect
60Stay wire (7/3.15mm) (10.0kg per stay set)
61Half clamps:
62Full clamps:
63Danger Plate (250×200×1.6mm)
64Nuts and Bolts of various sizes
65Red Oxide paint
66Aluminium Paint
67Removal of old conductor from insulator & De-Stringing (420 + 5110) = 5530
68Erection of tilted S/T pole 9 mtr. Long
69Re-sagging, stringing & binding insulator of conductor size (50 mm) (10011 + 638) = 10649
70Errection Part-Tender for R/R of 11kV HT Line from Shour to Purthi damaged due to heavy snowfall and landslides in (E) Section Shour under Electrical Sub-Division HPSEBL Sach.
71ACSR conductor 6/1/3.35mm (Rabbit)
72Steel Tubular Pole 9 Mtr Long
73RCC Muff with Concrete Filling
74Cross Arm [ Channel Iron (100×50×6mm],Length: 1270mm i/c tolerance of 100 mm either side)× 2 structure
75Angle Iron (50×50×6mm), Length: 750mm×2 No×2 structures
76Pole Top Bracket [MSCI:100*×50*×6mm-100mm
7711kV Pin Insulators (Porcelain,12kV,10KN):3 No per pole structure
78Belt set -MS Angle Iron :50×50×6 Length:1800mm×2 No
79X-Bracing Set -MS Angle Iron 50×50×6, length:2125mm×2No
80X-Arm (Horizontal)-MS Channel Iron C type: 100×50×6 Length:2340mm×2 No]
81Discs insulator sets on Dead End structures complete in all respect
82Stay set complete in all respect
83Stay wire (7/3.15mm) (10.0kg per stay set)
84Half clamps:
85Full clamps:
86Danger Plate (250×200×1.6mm)
87Nuts and Bolts of various sizes
88Red Oxide paint
89Aluminium Paint
90Removal of old conductor from insulator & De-Stringing (420 + 5110) = 5530
91Erection of tilted S/T pole 9 mtr. Long
92Re-sagging, stringing & binding insulator of conductor size (50 mm) (10011 + 638) = 10649 Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56341986
AUTHORITY Government Departments
TENDER VALUE 9.92 Lakhs
LAST DATE 15-07-2026
Authority
Authority Name Himachal Pradesh State Electricity Board
Work Description Tender for Tender For Repair And Replacement Of 11 Kv Ht Line At Various Locations In Section Sach And Shour Esd Sach Pved Killar Op Circle Hpsebl Dalhousie.
Basic Detail
Tender No Bid No. OCD/DB/Bid-14/2026-27
Bidding Type Tender
Location
City Chamba
State Himachal Pradesh
Key Dates
Publish Date 07 Jul 2026
Submission Date 15 Jul 2026
Open Date 16 Jul 2026
Finance
Tender Value 9.92 Lakhs
Tender Fee 590
EMD 9924
Exemption Not Available
Document List
7ad528be-e603-47b1-a98c-1839dea003ec.html
BOQ_204361.xls
SBD_Revenue_Bid_14.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 07, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 15, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 3 days
Jul 16, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 4 days

Tender Documents

Download All (ZIP) ↓
html

7ad528be-e603-47b1-a98c-1839dea003ec.html

xls

BOQ_204361.xls

pdf

SBD_Revenue_Bid_14.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders