| Sl. No. | Item Description |
| 1 | ERECTION PART of New 11 kV HT line |
| 2 | Erection of S.T Single Pole 9 Mtr. Long :- Digging of Pit, fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect. |
| 3 | Erection of S.T Double pole Pole 9 Mtr. Long :- Digging of Pit, fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect. |
| 4 | Erection of S.T Double pole Pole 11 Mtr. Long :- Digging of Pit, fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect. |
| 5 | Erection of HT Earthing Set.:- Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect. |
| 6 | Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect. |
| 7 | Stringing and sagging conductor:- Laying of conductor (ACSR 7/4.26 mm 100 mm²) stringing and sagging, binding with insulator complete in all respect. |
| 8 | Erection Part of 11/0.4 KV, 100KVA Transformer & bus Bar Str. |
| 9 | Erection of 11/0.4 KV , 100 KVA S/Stn :- Digging of Pit, Drilling of Holes In X Arms, Preparation of Platform Structure (Members Ci, Ai I.E. X0Arm & Knee Bracing Set), Erection of D Pole, Concreting 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size), Erection of Platform, Erection of X0Arms, Drop0Out, Erection of 2 Nos Stay Set, Erection of Jumper, Digging of pit, Fixing of earth rod, clamp, earth wire and connecting to the structure, Earthing for 3 Nos Earths, Providing Charcoal and Salt for the earthing, Filling of the pit with material, Providing Earthing Conn. To G.O Switch, Lightning Arrestor Etc.& Poles, Providing earthting to the Transformer, LT Box, Meter Box etc, Barbed Wire & Painting. and Erection of 100 kVA Transformer, LT Box, MCCB Switch, Cable, service Cable and Energy Meter. Providing earthing connection to Transformer as per REC Board Standard complete in all respect , includes lifting, loading, unloading, all misc work required to complete the work in all respect. |
| 10 | Erection for underneath DTR Structure:- Digging of Pit, Drilling of Holes In X Arms, Preparation of Platform Structure (Members Ci, Ai I.E. X0Arm & Knee Bracing Set), Erection of D Pole, Concreting 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size), Erection of Platform, Erection of X0Arms, Erection of 2 Nos Stay Set, Erection of Jumper, Digging of pit, Fixing of earth rod, clamp, earth wire and connecting to the structure, Earthing for 3 Nos Earths, Providing Charcoal and Salt for the earthing, Filling of the pit with material, Providing Earthing Conn. To G.O Switch, Lightning Arrestor Etc.& Poles, Barbed Wire & Painting, includes lifting, loading, unloading, all misc work required to complete the work in all respect. |
| 11 | Erection Part of Tapping Structure |
| 12 | Erection of S.T Double pole Pole 9 Mtr. Long :- Digging of Pit, fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect. |
| 13 | Erection of HT Earthing Set.:- Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect. |
| 14 | Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect. |
| 15 | Errection and Installation of G.O. Switch Unit (11KV, 400A, 25KA) |
| 16 | Errection and Installation of D.O. fuse Unit |
| 17 | Errection of Jumpering |
| 18 | Supply Part of 11 KV HT Line |
| 19 | AAAC 7/4.26 (100 mm²) {Includes 3 conductor lengths for 3Φ and Additional 1% (Sag, Jumpering and wastage} |
| 20 | Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) |
| 21 | Steel Tubular Poles (11 m, Working Load > 227 kgf/m²) (with Ruling Span 90 m, 8 No. Run thro' and 3 No. Double Pole Dead End Structures) |
| 22 | Muffs (2000mm) with concerete filling |
| 23 | Cross Arm: [Channel Iron (100x50x5 mm), Length: 1270 mm i/c tolerance of 100 mm either side) x 8 structure |
| 24 | Angle Iron (50x50x6 mm), Length (750 mm x 2 x 8 structures |
| 25 | Pole Top Bracket [MSCI: 100x50x6 mm 100 mm) |
| 26 | 11 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure( Insulator suitable for heavily polluted area) |
| 27 | Belt Set - MS Angle Iron: 50x50x6, Length 1800 mm x 2 No. |
| 28 | X-Bracing Set - MS Angle Iron: 50x50x6, Length 2125 mm x 2 No. |
| 29 | X-Arm (Horizontal) - MS Channel Iron: 100X50x6, Length 2340x2 mm x 2 No. formation. |
| 30 | Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) |
| 31 | 11 kV Pin Insulators (Porcelain, 12 kV, 10 kN): 3 No per double pole structure |
| 32 | Stay set complete in all respect (1No. / Single Pole , 4 No. / Double Pole Structures) |
| 33 | Stay Wire (7/3.15 mm) (9.0 kg Per Stay Set) |
| 34 | HT Earthing set complete (REC constr. Stand J-1) |
| 35 | Single Continous Earth wire (GI, 8 SWG) {alongwith 2 wire lengths for avg. one road crossing @ 20 m and Additional 1% (Sag and wastage)} @ 0.102 kg/m |
| 36 | Eye Hook for earth wire |
| 37 | Earth Reel |
| 38 | Half Clamp [on double pole dead end str. 4 Nos.on run through str. 2 Nos.] |
| 39 | Full Clamp (on double pole dead end str. 4 Nos.) single pole on run through str. 2 Nos. |
| 40 | Danger Plate (250X200X1.6 mm) |
| 41 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 42 | Barbed Wire |
| 43 | Red Oxide |
| 44 | Aluminium Paint |
| 45 | Suppy of 100KVA DTR |
| 46 | Distribution Transformer (Ordinary), 11/0.4 kV, 100 KVA |
| 47 | Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) |
| 48 | RCC Muffs with concerete filling |
| 49 | X-Arm: [Channel Iron (100x50x5 mm), Length : 2800 mm X 2 Nos] for incomer line |
| 50 | MS Angle Iron (50X50x6 mm), Length : 2800 mm x 1 Nos for LA. |
| 51 | X-Arm: [Channel Iron (75x40x4.8 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 52 | X-Arm: [Channel Iron (100x50x5 mm), Length : 2800 mm X 2 Nos] for Transformer Bed |
| 53 | X-Arm [Channel Iron (100x50x6 mm), Length : (460 mm) x 2 Nos for supporting Main Channel of Transformer] |
| 54 | MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos |
| 55 | MS Angle Iron (35X35x6 mm), Length : 460 mm x 2 Nos |
| 56 | MS Angle Iron (50X50x6 mm), Length: 950 mm x(2 Nos for Bed Knee Bracing) |
| 57 | MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos |
| 58 | MS Angle Iron (50X50x6 mm), Length : 450 mm x 1 No. |
| 59 | Switch Handle Supporting: [Channel Iron (75x40x4.8 mm), Length : 460 mm |
| 60 | GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type |
| 61 | D.O Fuse Unit |
| 62 | Surge Arrester, 9 kV Station Class (Porcelain Type) |
| 63 | Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) |
| 64 | Stay set complete |
| 65 | Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set) |
| 66 | Pipe Earthing Set |
| 67 | 6 SWG GI wire For Earthing |
| 68 | Panel (Distribution Box LT 100 kVA DTR MS Sheet of 1.6 mm ( 900x800x200 mm ) cubide Box complete with stand etc and Al Busbar (25x6mm)inside .painted /powder coated after primar coating MCCB 160 amp 3P 35kA , ICS =100 % ICU, Kit-Kit 200 Amp 100 KVA DTR |
| 69 | The HP Desktop Computer comes with an Intel Core i7-14700 processor, 32 GB DDR5 RAM (expandable), and a 1 TB NVMe SSD for high-speed performance. It includes Intel UHD Graphics, a 650 W power supply, and connectivity options such as USB 3.2, HDMI, DisplayPort, Ethernet, Wi-Fi, and Bluetooth. The system operates on Windows 11 Pro and carries a three-year on-site warranty |
| 70 | Supply, Installation, Testing & Commissioning of Blue Star High Wall Split AC, 1.5 TR, 3 Star, Copper Condenser, R-32 Refrigerant, complete with all standard accessories and remote control, including manufacturer’s standard warranty (1 Year Comprehensive + 5 Years Compressor). |
| 71 | Half Clamp (M.S. Flat 50X6 mm) |
| 72 | Full Clamp (M.S. Flat 50X6 mm) |
| 73 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 74 | Aluminium Thimble |
| 75 | Copper Thimble 200 Amp |
| 76 | Danger Plate |
| 77 | Barbed Wire |
| 78 | LT Cable 3.5 X 120 mm² 1.1 kV XLPE Cable Unarmoured |
| 79 | Aluminium Paint. |
| 80 | Red Oxide |
| 81 | Chain Link fencing , Angle Iron ,Gate etc for transformer fencing |
| 82 | Capacitor Bank 415V for 100 kVA DTR 36 kVAr |
| 83 | Tapping Str. Supply Material |
| 84 | Steel Tubular Poles (9 m, Working Load > 227 kgf/m²) |
| 85 | RCC Muffs with concerete filling |
| 86 | Belt Set - MS Angle Iron: 50x50x6, Length 1800 mm x 2 No. |
| 87 | X-Bracing Set - MS Angle Iron: 50x50x6, Length 2125 mm x 2 No. |
| 88 | X-Arm (Horizontal) - MS Channel Iron: 100X50x6, Length 2340x2 mm x 2 No. formation. |
| 89 | X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 90 | GO Switch Handle Supporting: [Channel Iron (75x40x4.8 mm), Length : 460 mm |
| 91 | GO AB Switch Unit (11kV, 400A, 25 KA ) |
| 92 | D.O Fuse Unit |
| 93 | Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) |
| 94 | Half Clamp (M.S. Flat 50X6 mm) |
| 95 | Full Clamp (M.S. Flat 50X6 mm) |
| 96 | Stay set complete |
| 97 | Stay Wire (7/3.15 mm) (9.0 kg Per Stay Set) |
| 98 | HT Earthing set complete (REC constr. Stand J-1) |
| 99 | Danger Plate |
| 100 | Prov. Sundries & Misc. to complete the job such as allmunium paint, Nuts & Bolts |
| 101 | Transportation / Mannual carriage of material at destination site. |
| 102 | Add Inspection Charges Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 1 dayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender