Tender For General-Kerala Forest Department: Punalur Division: Pathanapuram Range- Elephant Proof Trench Works-Estimate For Construction Of New Elephant Proof Trench (Ept) For A Length Of 860M And Improvement Of Existing Elephant Proof Trench By Wide
Tender Overview
Project Description
Tender for General-Kerala Forest Department: Punalur Division: Pathanapuram Range- Elephant Proof Trench Works-Estimate For Construction Of New Elephant Proof Trench (Ept) For A Length Of 860M And Improvement Of Existing Elephant Proof Trench By Widening And Deepening In Two Stretches Of 126M And 114M From Hml Plantation To M Azhathara Ambalathinkadavu Under Ambanar Forest Station Of Pathanapuram Range During Fy 2026-27.-Dpr Preparation Work
BOQ
| Sl. No. | Item Description |
| 1 | Appendix-1: Widening and deepening of existing trench (126m and 114m) |
| 2 | 2.7.1:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock |
| 3 | 2.26.2:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock |
| 4 | OD72380/2026-2027:Engaging labour for manually breaking hard rock where blasting is prohibited, including wedging, chiselling, dressing, collection and stacking of broken rock at site, complete as directed by the Engineer-in-Charge. The rate includes all labour, hand tools, chisels, crowbars, hammers, tool sharpening charges and all incidental charges necessary for completion of the work. |
| 5 | Appendix-2: Construction of EPT (new work-860m) |
| 6 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil |
| 7 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil |
| 8 | 2.7.1:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock |
| 9 | 2.26.2:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender