Supply Of CNC Under Floor Wheel Lathe Machine
Tender Overview
Project Description
Supply Of cnc under floor wheel lathe machine , provision of supply, installation and commissioning of cnc under floor wheel lathe machine (b g) with shed with winch machine on turnkey basis as per attached specification no. ncr-els-cnb/cnc-ufwl (bg)/with works/2024. [ warranty period: 30 months after the date of delivery ] ] , annual maintenance contract (amc) charges for equipment mentioned in item code 655703790 019 above for five years after initial warranty period of 30 months from the date of commissioning. [ warranty period: 2 years, amc period: 5 years, rate of discounting: 8 % ] ] , cost of the concomitant accessories according to tender specification. [ warranty period: 30 months after the date of delivery ] ] , cost of any other accessories which in the opinion of supplier is essentially required for making the machine fully functional. [ warranty period: 30 months after the date of delivery ] ] , cost of turnkey charges viz. foundation, installation and commissioning etc. ] , cost of concomitant works according to tender specifications. ] , cost of preventive maintenance during first and second year of warranty period. ]
BOQ
| Sl. No. | Item Description |
|---|---|
| 1 | Provision of Supply, Installation and Commissioning of CNC Under Floor Wheel Lathe Machine (B G) with shed with Winch Machine on Turnkey basis as per attached Specification No. NCR-ELS-CNB/CNC-UFWL (BG)/With Works/2024. [ Warranty Period: 30 Months after the date of delivery ] ] |
| 2 | Annual Maintenance Contract (AMC) charges for equipment mentioned in item code 655703790 019 above for five years after initial warranty period of 30 months from the date of commissioning. [ Warranty Period: 2 years, AMC Period: 5 years, Rate of Discounting: 8 % ] ] |
| 3 | Cost of the concomitant accessories according to tender specification. [ Warranty Period: 30 Months after the date of delivery ] ] |
| 4 | Cost of any other accessories which in the opinion of supplier is essentially required for making the machine fully functional. [ Warranty Period: 30 Months after the date of delivery ] ] |
| 5 | Cost of Turnkey Charges viz. foundation, installation and commissioning etc. ] |
| 6 | Cost of concomitant works according to tender specifications. ] |
| 7 | Cost of Preventive Maintenance during first and second year of warranty period. ] |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 30 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender