Tender For Constructing Ht Oh Using Covered Conductor At Mukkamkodu, Vallabhankunnu, Punnodu Dtr To Mukkukada Jn And Erection Of Transformers At Mukkamkodu & Vallabhankunnu [Cw-4680-202526-25] & [Cw-4680-202526-27] [Cw-4680-202526-79] Under Electrica
Tender Overview
Project Description
Tender for Constructing Ht Oh Using Covered Conductor At Mukkamkodu, Vallabhankunnu, Punnodu Dtr To Mukkukada Jn And Erection Of Transformers At Mukkamkodu & Vallabhankunnu [Cw-4680-202526-25] & [Cw-4680-202526-27] [Cw-4680-202526-79] Under Electrical Section Pallickal And Re-Routing Ht Lines From 28Th Mile No.1 To 28Th Mile Junction [Cw-4533-202526-22] Under Electrical Section Kallambalam Of Electrical Division, Attingal Under Electrical Circle, Thiruvananthapuram.
BOQ
| Sl. No. | Item Description |
| 1 | Fitting one additional Fuse unit and giving connection from Transformer to fuse and Distribution box to LT OH line. |
| 2 | Providing Stay for LT poles including digging & back filling pit in ordinary soil. |
| 3 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 4 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 5 | Fitting and providing one Strut using HT PSC pole including digging and back filling pit in ordinary soil. |
| 6 | Providing Transformer fencing to a height of 1.8 m above ground level using MS Angle frames of size ISA 50x50x6mm for outer frame, 2 runs of 40 x 6 MS flat for horizondal brasing and grills with MS rods 8 mm Dia @ 10cm c/c for verticals, providing gate with locking arrangements, providing danger board & name board, embeding the legs in cement concrete 1:2:4, footing of size 30cmx30cmx50cm, painting with synthetic enamel paint two coats over one coat of iron primer etc complete, incl cost of transportation |
| 7 | Cleaning and levelling of transformer yard/RMU, spreading 40 mm broken stone in yard for a thickness of 10 cm above bed of 10 cm thick 6 mm broken stone, after constructing a curb wall of height 20cm above ground and 10cm below level including cost of all materials and charges for conveying, spreading, consolidating etc. |
| 8 | Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides. |
| 9 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. |
| 10 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Soft Rock. |
| 11 | Erecting one LT PSC Pole in position including digging & back filling pit in ordinary soil. |
| 12 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 13 | Fitting one set AB switch, DO fuse (3No.), LA (3No.), giving all connections from HT line to Transformer bush and drawing earth leads to the ground for earthing excluding provision of earthing and fixing channels. |
| 14 | Additional rate for providing one disc set, PG clamp etc. complete, on any type of HT pole for making cut point. |
| 15 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 16 | Dismantling (without damage) LT stay including digging pit in all classes of soil and backfilling. |
| 17 | Dismantling one section fuse from structure and bringing back to section store. |
| 18 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires. |
| 19 | Pole numbering using printed Aluminium sheets of 22 SWG having size 20 x 12 cm or Painting the surface of line supports where numbers are to be inscribed, Pole numbers shall be painted in circular / rectangular background, using approved quality anti algal yellow paint in two coat after scraping and cleaning the surface at a height of 2.5 metre above ground level. The number and letters should be in black synthetic enamel paint. The size of the number should be at least 2cm in height x 1.5cm in width. including cost of paint. |
| 20 | Erecting one 100kVA Transformer to existing DP and giving connections, including loading from TMR/SRS/other stacking place & unloading at site but excluding cost for transporting transformer. |
| 21 | Additional rate for refitting/redoing one Shackle Set, including reshacling one span, while renewing any type of LT pole. |
| 22 | Fitting one Additional V cross arm in existing single pole including conveyance of materials. |
| 23 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole including conveyance of materials. |
| 24 | Fitting one Additional 2.4/3m Channel cross arm (75x40x6mm), in existing 11kV DP including conveyance of materials. |
| 25 | Additional rate for providing one HT Pin with insulator, complete on any type of HT pole. |
| 26 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 27 | Fitting and erecting one HT Double Pole Structure using A type pole in position including fitting 2 No. channel cross arm, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). |
| 28 | Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 29 | Stringing of one km 11kV line with ACSR Raccoon (3 conductors) after fitting insulators and giving jumper connections including cutting and removing tree branches wherever necessary excluding cut point works. |
| 30 | Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 31 | Stringing of one km 3 PH 11kV line with XLPE Insulated ACSR Raccoon or equivalant (3 conductors) after fitting insulators, binding conductors to pin insulators using suitable tie and anchoring with wedge type anchoring clamps including cutting and removing tree branches wherever necessary excluding cut point works. |
| 32 | Cutting trees having girth beyond 30cm but upto and including 60cm (felling trees including cutting of trunks and branches) and removing the root completely and stacking etc. 1 No. |
| 33 | Cutting trees having girth beyond 60cm but upto and including 120cm (felling trees including cutting of trunks and branches) and removing the root completely and stacking etc. 1 No. |
| 34 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. |
| 35 | Providing/Inserting 2 line spacer on the existing LT OH line. |
| 36 | Providing/Inserting 3 line spacer on the existing LT OH line. |
| 37 | Dismantling 2 line spacer on the existing LT OH line. |
| 38 | Dismantling 3 line spacer on the existing LT OH line. |
| 39 | Doing one cable end termination on HT XLPE UG cables of sizes upto and including 3x185 sqmm using the cable jointing kit supplied departmentally after making fencing, caution board and all other safety measures including charges for cable jointer etc. complete as per the direction of the departmental officers. |
| 40 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 41 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 42 | Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 43 | Transporting Transformers by hired vehicle to a distance upto 5km and carrying upto 2 numbers of 63/100/160/250kVA Transformers / Ring Main Units excluding loading& unloading charges. |
| 44 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 45 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 46 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at standard distance (1.5m) away from the pole/structure in ordinary soil & backfilling the pit with 15cm alternate layer of charcoal, salt and sand up to 90cm from the bottom. including the cost of 20kg salt, 25kg charcoal, excluding supply of earth pipe. |
| 47 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling. |
| 48 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. |
| 49 | Additional rate for excavation of Pit for A type pole in Laterite. |
| 50 | Installing One No. Insulation piercing connector of size Main :16 to 95 ,Tap:1.5 to 16 Sq.mm |
| 51 | Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing. |
| 52 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials. |
| 53 | Providing WP support with PSC pole including digging & back filling pit in ordinary soil. excluding transportation of poles. |
| 54 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 55 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 56 | Installing one DTR Meter with box (normal size 40x25x100cm) on existing poles including fixing of 3 CTs on bus bar, laying and termination of control cable using proper lugs, fixing of meters, capacitors, control fuses and giving the complete connections including conveyance of materials. |
| 57 | Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite. |
| 58 | Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). |
| 59 | Doing one cable end termination on HT ABC of sizes Up to 3x150+1x120 sqmm and connecting to existing MVT or other terminals,using the cable end termination kit supplied departmentally including charges for cable jointer etc. complete as per the direction of the departmental officers. |
| 60 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. |
| 61 | Dismantling of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16 (Street Light) + 1 x 50 Sq.mm. (Insulated Messenger) |
| 62 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 63 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 64 | Surge Arrestors for ABC |
| 65 | Providing Strut using LT PSC pole including digging and back filling pit in ordinary soil. |
| 66 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt & nut etc. |
| 67 | Insertion of one LT PSC pole in existing three phase OH line including digging & back filling pit in ordinary soil, fitting cross arm, insulator, binding etc. excluding transportation of poles. |
| 68 | Straightening one slanted LT pole after unbinding the line and binding the line after work. |
| 69 | Renewal of existing damaged/old 11kV PSC/RCC Pole with new A type pole in place including excavation, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except pole. |
| 70 | (For RDSS Only) Doing straight joint on HT covered conductor 99 Sqmm using the mid span jointing kit as per specification. |
| 71 | Conveyance of one km 11kV line materials from section store/stacking place to the work site (excluding poles). Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender