Water Resources and Irrigation Government Departments Closing in 15 days TDR #56327016

Tender For Design, Supply, Construction, Installation, Testing And Commissioning Of Sewage Treatment Plant Of 1.40 Mld At Dhalli-Ii Ghati Mohanpur Shimla Based On Modern Sbr Technology Including Entire Network With All Contingent Civil, (Including St

Issued by Government Departments · Shimla, Himachal Pradesh
Tender Value
24.98 Crore
Estimated cost
Bid Submission
27 Jul 2026
15 days left
EMD
25.73 Lakhs
Bank guarantee accepted
Document Fee
30000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Shimla → Himachal Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Design, Supply, Construction, Installation, Testing And Commissioning Of Sewage Treatment Plant Of 1.40 Mld At Dhalli-Ii Ghati Mohanpur Shimla Based On Modern Sbr Technology Including Entire Network With All Contingent Civil, (Including Staff Quarter), Electrical, Mechanical, Piping And Instrumentation Works With Three Months Trial Run Including Three-Year Defect Liability Period And Operation & Maintenance Of Entire System For 5 Years.(Estimate Cost: Rs.24,98,39,895/- Emd Rs.25,73,400/-

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 07-Jul-2026 corrigendum Other 27-Jul-2026

BOQ

Name of Work:- Design, supply, construction, installation, testing and commissioning of Sewage Treatment Plant of 1.40 MLD at Dhalli-II Ghati Mohanpur Shimla based on Modern SBR technology including entire Network with all contingent civil, (including staff quarter), electrical, mechanical, piping and instrumentation works with three months trial run including three-year defect liability period and operation & maintenance of entire system for 5 years.(Estimate Cost: Rs.24,98,39,895/- EMD Rs.25,73,400/-
Sl. No. Item Description
1Submission and approval of surveys, Soil Investigation, Design, Working including all layout, sections, typical details Shop drawings, as built drawings….etc. complete for all components of works 1.4 MLD STP Dhalli-II at Ghati Mohanpur based on SBR technology including all auxillary buildings / structural and all allied works as mentioned in tender document. Contractor shall submit working drawing and implementation schedule as per priority given by Engineer-In-charge for approval. Payment shall be released on prorata basis only after approvalof working Drawings as per implementation schedule. Complete as per direction of Er-in Charge.(Schedule -A)
2Construction, Site development, testing, commissioning and giving satisfactorily trials of 1.4 MLD STP of SBR technology which can be accommodated in limited identified land space consisting of Primary, Secondary and Tertiary Treatment Units as per the requirement of designed CPHEEO norms relevant IS codes etc. necessary piping work with required valves, gates, drains, path Ways, Administration Block cum Laboratory, Laboratory Equipments, Internal Roads, Pathways, Compound Wall, Tools and plants, Treated effluent arrangements complete as turnkey job with all involved Civil, electrical, (Including transformer) Instrumentation and mechanical works Inclusive of following Items, units as per detailed specifications for civil, electrical, Instrumentation and mechanical components complete to achieve latest CPCB/ HPPCB / CPHEEO discharge standards pH 6.5- 8.5, BOD < 10ppm, COD<50ppm, TSS < 10ppm, NH4-N <5ppm, N-Total<10ppm, Total Phosphorus (PO4-P) =1 ppm, Faecal Coliforms <100 MPN/100ml and Total residual Chlorine =1 ppm to get recyclable quality of water for Industrial / agricultural purposes. .All units shall be interconnected with administration building by suitable or RCC overhead walkways, boundary wall of average 4.0 mtr complete fencing (Campus should covered with boundary wall and fencing) at the STP component as per the scope and confirming norms as mentioned above. The plant should be completely automated with PLC - SCADA complete from Primary, secondary and Tertiary treatment etc price of items including GST and payment will be released on prorata basis complete as per Direction of Er-in Charge.(Schedule -B)
3Operation and Maintenance cost of 1.4 MLD STP including entire Network of 27 Km of various diameter for 5 Years which includes cost of manpower, Chemicals and consumables, Residual disposal charges (Transportation) and repair & maintanence excluding three years defects liability period (from 4th year of Operation and Maintanence contract complete in all respect as per direction of Er-in-Charge.(Schedule -C)
4For 1st year
5For 2nd year
6For 3rd year
7For 4th year
8For 5th year
9Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer- in-charge.
10Excavation in foundation, trenches etc., in earth work (in all kind of soil )such as pick work, jumper work, blasting work Kankar, moorum shingles including decomposed soft and hard rock i/c cutting of top of metelled road etc., upto all heights stacking the excavated earth not more than 3 meters clear from the edge of excavation and then returning the stacked soil in 15cm. layers, when required into plinth and sides of foundation etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth up to all leads and lifts etc., complete in all respect.
11Providing, laying jointing & testing in trenches centrifugal cast ductile iron (spun) pressure pipes as per IS:8329/2000 Class K-7 duly ISI marked, inside cement mortar lined suitable for tyton (push on joints) for sewer lines including cutting of pipes, chamfering where required (earth work in trenches and jointing of pipes to be measured and paid for separately) including carriage up to the site of work, testing etc., complete as per instructions of the Engineer-in-charge.
12150 mm
13200 mm
14250 mm
15Providing & fixing in trenches centrifugal cast ductile iron fittings of 9523/2000 class A, series K-12 with inside cement mortar lined suitable for tyton (push on joints) with pipe as per item No. 3, such as socketed bends of all degrees, socketed, tees, collars and all other required fittings, including carriage up to the site of work, testing etc., complete as per instructions of the Engineer-in-charge.
16150 mm dia double socket DI Bend of require degree
1790 degree
1845 degree
1922.50 degree
2011.25 degree
21Providing and fixing DI Tee 150mm x 150 mm x 100mm
22Providing and fixing DI Tee 150mm x 150 mm x 150mm
23MJ Coller 150 mm dia
24200 mm dia double socket DI Bend of require degree
2590 degree
2645 degree
2722.50 degree
2811.25 degree
29providing and fixing DI Tee 200mm x 200 mm x 150mm
30MJ Coller 200 mm dia
31250 mm dia double socket DI Bend of require degree
3290 degree
3345 degree
3422.50 degree
3511.25 degree
36Providing tyton (Push on joints) to Ductile iron pipes and fittings including the testing of the joints cost of rubber gasket (SBR quality) conforming to IS 12820/1989.
37150 MM
38200 MM
39250 MM
40Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size) (For 150 MM dia pipe)
41Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of entering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size) complete as direction of er-in-charge( For 150 MM dia pipe)
42Providing form work with steel plate 3.15 m.m thick welded with angle iron 30x30x5 m.m so as to givea fair finish including centering ,shuttering, propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for-in-situ reinforced concrete and plaiin concrete work in:- Foundation ,footings basis of columns etc and mass concrete complete as direction of er-in-charge.
43Providing fixining of SFRC frame cover manufacture as per BIS:12592 (Part 1 &2) for Manhole of load capacity of 20 MT having diameter 560 mm complete installation as per direction of er-in-charge.
44Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of entering, shuttering, finishing and reinforcement, 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) complete as direction iof er-in-charge. (For Slab)
45Providing mild steel/tor steel reinforcement for RCC work includng bending binding and placing in position complete upto level @110kg/m^3 as per the direction of er in charge. (For 833 Nos. Manhole)
46stone soling properly hand packed for the restoration of damaged propert complete as direction of er -in-charge.
47P/L Cement Concrete work 1:2:4 (1cement :2sand :4stone aggregate 40mm nominal size) and curing complete excluding cost of form work in :-Foundation and plinth.
48Disposal of moorum /building rubbish/malba/similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting , unloading to approved muncipal dumping ground for lead upto 10 km for all lifts, complete as per direction of Engineer-in -charge . Note- Item to be applicable in urben area having direction for restricted hours for movement/playing of load carrying motor vehicle of 3.5 cum or more( Avg 40% of excavation)
49stone filling behind wall Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56327016
AUTHORITY Government Departments
TENDER VALUE 24.98 Crore
LAST DATE 27-07-2026
Authority
Authority Name Shimla Jal Prabandhan Nigam Limited
Work Description Tender for Design, Supply, Construction, Installation, Testing And Commissioning Of Sewage Treatment Plant Of 1.40 Mld At Dhalli-Ii Ghati Mohanpur Shimla Based On Modern Sbr Technology Including Entire Network With All Contingent Civil, (Including Staff Quarter), Electrical, Mechanical, Piping And Instrumentation Works With Three Months Trial Run Including Three-Year Defect Liability Period And Operation & Maintenance Of Entire System For 5 Years.(Estimate Cost: Rs.24,98,39,895/- Emd Rs.25,73,400/-
Basic Detail
Tender No SJPNL/sewerage/NIT/929-32
Bidding Type Tender
Location
City Shimla
State Himachal Pradesh
Key Dates
Publish Date 07 Jul 2026
Submission Date 27 Jul 2026
Open Date 01 Jan 0001
Finance
Tender Value 24.98 Crore
Tender Fee 30000
EMD 25.73 Lakhs
Exemption Not Available
Document List
BiddingForms.pdf
BOQ_204691.xls
CoverPage.pdf
DHALI.pdf
DNITConditions.pdf
ExtentofWorkForDesignCons_1.pdf
Form12.pdf
Form6.pdf
FunctionalGuaranteesofthePlant.pdf
Index.pdf
InspectionTestingandCommi_2.pdf
Instructionstobidders.pdf
layout.pdf
responsetoprebid1stcall.pdf
Section1Mod.pdf
SubmissionToBeMadeonAward_3.pdf
TechnicalSpecifications.pdf
Tendernotice_1.pdf
VoLIIBCondofContOM.pdf
68e05ca1-a9d3-4801-9057-c688e7390c81.html
ParticularConditionsofContract.pdf
PerformanceCriteriaFile.pdf
PreambletoPriceBid.pdf
prebid2ndcall.pdf
ProjectDescription.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 07, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 27, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 15 days
Jul 27, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 15 days

Tender Documents

Download All (ZIP) ↓
pdf

BiddingForms.pdf

xls

BOQ_204691.xls

pdf

CoverPage.pdf

pdf

DHALI.pdf

pdf

DNITConditions.pdf

pdf

ExtentofWorkForDesignCons_1.pdf

pdf

Form12.pdf

pdf

Form6.pdf

pdf

FunctionalGuaranteesofthePlant.pdf

pdf

Index.pdf

pdf

InspectionTestingandCommi_2.pdf

pdf

Instructionstobidders.pdf

pdf

layout.pdf

pdf

responsetoprebid1stcall.pdf

pdf

Section1Mod.pdf

pdf

SubmissionToBeMadeonAward_3.pdf

pdf

TechnicalSpecifications.pdf

pdf

Tendernotice_1.pdf

pdf

VoLIIBCondofContOM.pdf

html

68e05ca1-a9d3-4801-9057-c688e7390c81.html

pdf

ParticularConditionsofContract.pdf

pdf

PerformanceCriteriaFile.pdf

pdf

PreambletoPriceBid.pdf

pdf

prebid2ndcall.pdf

pdf

ProjectDescription.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders