Tender For Project Management Consultant [Pmc] For Combined Water Supply Scheme For Providing 3.5 Mld To Sipcot Defense Industrial Park, Varapatti, 2.0 Mld To Tidco Aerospace Industrial Park, Sulur And 3.0 Mld To Tidco Semi-Conductor Industrial Park,
Tender Overview
Project Description
Tender for Project Management Consultant [Pmc] For Combined Water Supply Scheme For Providing 3.5 Mld To Sipcot Defense Industrial Park, Varapatti, 2.0 Mld To Tidco Aerospace Industrial Park, Sulur And 3.0 Mld To Tidco Semi-Conductor Industrial Park, Kethanur From Ntadcl Water Distribution Station (Wds 24) Murug Alayam, Tirupur
BOQ
| Sl. No. | Item Description |
| 1 | NEW TIRUPUR AREA DEVELOPMENT CORPORATION LIMITED (NTADCL) Name of Scheme: Project Management Consultant [PMC] for Combined Water Supply Scheme for providing 3.5 MLD to SIPCOT Defense Industrial Park, Varapatti, 2.0 MLD to TIDCO Aerospace Industrial Park, Sulur and 3.0 MLD to TIDCO Semi-Conductor Industrial Park, Kethanur from NTADCL Water Distribution Station (WDS 24) Murugampalayam, Tirupur PRICE BID - COVER II e- submission BILL OF QUANTITIES 1) The Bill of Quantities shall contain items for the construction, installation, testing, commissioning and maintenance of the Works to be carried out by the Contractor. 2) The Bill of Quantities will be used to calculate the Contract Price. The contractor shall be paid for the quantum of work done at the rate quoted for each item in the Bill of Quantities. 3) The rates quoted in the BOQ shall be for carrying out the work in conformity to the BIS, TNBP and Technical Specifications and other Terms and Conditions set out in the Bid Document 4) All bidders will be provided with an electronic copy of the schedule of prices. Cells that contain permanent information and are not to be changed by the Bidder will be protected. Cells into which the bidder can enter rates will be left unprotected. The spread sheets already contain formulae 5) The bidder should offer their/his price for all the items of works detailed in the Bill of Quantities. Items for which no rate or price is entered by the bidder will not be paid for by the employer when executed and shall be deemed covered by the other rates and prices in the bill of quantities. 6) The Bidder should carry over the Schedule wise Amount in the General Abstract to the BoQ Sheet manually. If any difference with General Abstract Amount and the amount in the BoQ sheet the General Abstract amount will be govern 7) The Bidder is entirely responsible to ensure that the calculations presented in the Schedule of Prices are correct, and that the Bidder’s offer is complete in all respects 8) The Bidding under this contract shall be done through the electronic bid submission in the web site https://tntenders.gov.in as stipulated in Invitation for Bid. Priced Bill of Quantity duly signed digitally by the bidder. Negotiation on tender through E-Portal:- 9) During the negotiation also done through the electronic bid submission, bidders may choose to negotiate by proposing lower rates for individual items quoted in their initial bid. However, any attempt to increase rates for any item cannot be accepted. In such instances, only the lowest quoted rates for those items during the bidding/ negotiation process will be taken into consideration. Changes in the Probable of Probable of Quantity 10) If the final Quantity of the work done differs from the Probable of Quantity in the Bill of Quantities for the particular item/items, the rates as in the agreement for the relevant items shall be paid. Goods & Service Tax 11) The bid value is inclusive of GST @ 18% (or) at the rates as may be notified by the Government from time to time. The bidder should quote basic price of each item in the Bill of Quantity. The GST amount should be arrived for the Total basic cost of all the items. TDS - GST 12) From every individual periodic payment made to the firm/Contractor, TDS - GST will be deducted at the rates as may be notified from time to time by the Government Name of Work: Project Management Consultant [PMC] for Combined Water Supply Scheme for providing 3.5 MLD to SIPCOT Defense Industrial Park, Varapatti, 2.0 MLD to TIDCO Aerospace Industrial Park, Sulur and 3.0 MLD to TIDCO Semi-Conductor Industrial Park, Kethanur from NTADCL Water Distribution Station (WDS 24) Murugampalayam, Tirupur Sl. No. Description of work Probable quantity Figures Units in Rates in Amount in figures Figures Words 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Vide separate sheets attached. |
| 2 | Project Management Consultant [PMC] for Combined Water Supply Scheme for providing 3.5 MLD to SIPCOT Defense Industrial Park, Varapatti, 2.0 MLD to TIDCO Aerospace Industrial Park, Sulur and 3.0 MLD to TIDCO Semi-Conductor Industrial Park, Kethanur from NTADCL Water Distribution Station (WDS 24) Murugampalayam, Tirupur |
| 3 | Team Leader cum Construction Management Expert |
| 4 | Field Engineer |
| 5 | Electrical / Mechanical Engineer |
| 6 | Administrative Expenses |
| 7 | Basic Price Sub Total |
| 8 | Add GST @ 18 % Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 10 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 10 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender