Drinking Water Supply and Sanitation Government Departments Closing in 0 days TDR #56325997

Tender For Permanent Restoration Works Damages Occurred During The Month Of August & Sepetember 2025 W.R.T. Varous Water Supply Schemes Of Sub-Division Kandi-Ii (Jandrah, Badsoo, Panjgrain, Marh & Jagti) Part-2 Under (Sasci 2026-27)1. Construction Of

Issued by Government Departments · Jammu, Jammu and Kashmir
Tender Value
87.42 Lakhs
Estimated cost
Bid Submission
14 Jul 2026
0 days left
EMD
1.74 Lakhs
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Jammu → Jammu and Kashmir
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Permanent Restoration Works Damages Occurred During The Month Of August & Sepetember 2025 W.R.T. Varous Water Supply Schemes Of Sub-Division Kandi-Ii (Jandrah, Badsoo, Panjgrain, Marh & Jagti) Part-2 Under (Sasci 2026-27)1. Construction Of Pump Room Building At Korga Under Water Supply Scheme Korga.2. Construction Of Retaining Wall At 50,000 Glns 2Nd Stage Korga Under Water Supply Scheme Korga3. Providing Protection Work With Wire Crates At Existing Dug Well And Proposed Dug Well At River Tawi Under Water Supply Scheme Patyadi4. Construction Of Pump Room Building At Sahnoo Under Water Supply Scheme Sahnoo5. Providing Protection Work With Wire Crates At Sahnoo Under Water Supply Scheme Sahnoo.6. Repair Of 5000 Gph Rsfp At Bargay Sahnoo..7. Providing, Laying And Fitting Of Gi Pipe At Kanyala Under Water Supply Scheme Kanyala Kahpota.8. Providing Protection Work With Wire Crates At Old Dugwell And New Dugwell At Hurlani Under Water Supply Scheme Hurlani.9.Cconstruction Of 30,000 Glns Gsr At Badsoo Under Water Supply Scheme Badsoo.10. Providing Protection Work With Wire Crates At New Dug Well At River Tawi At Badsoo Under Water Supply Scheme Badsoo

BOQ

Name of Work:- Permanent Restoration works damages occurred during the month of August & Sepetember 2025 w.r.t. varous water supply schemes of Sub-Division Kandi-II (Jandrah, Badsoo, Panjgrain, marh & Jagti) Part-2 under (SASCI 2026-27)1. Construction of Pump room building at Korga under WSS Korga.2. Construction of retaining wall at 50,000 glns 2nd stage korga under WSS Korga3. Providing protection work with wire crates at existing Dug well and proposed dug well at river tawi under wss patyadi4. Construction of Pump room building at Sahnoo under WSS Sahnoo5. Providing protection work with wire crates at Sahnoo under WSS Sahnoo.6. Repair of 5000 GPH RSFP at Bargay Sahnoo..7. Providing, laying and fitting of GI pipe at Kanyala under WSS Kanyala Kahpota.8. Providing protection work with wire crates at old dugwell and new dugwell at hurlani under WSS Hurlani.9.Cconstruction of 30,000 glns GSR at Badsoo under WSS Badsoo.10. Providing protection work with wire crates at New dug well at river tawi at Badsoo under WSS Badsoo
Sl. No. Item Description
1Earth work in excavation by mechanical means (hydraulic excavator) in trenches forfoundations, drains,pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspitsand the like not exceeding 10 Sqm on plan, including dressing of sidesand ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50metres: All kinds of soil:
2Earth work in excavation by mechanical means (hydraulic excavator) in trenches forfoundations, drains,pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspitsand the like not exceeding 10 Sqm on plan, including dressing of sidesand ramming of bottoms lift upto 1.5 m, including getting out excavated earth anddisposalofsurplusexcavatedearthasdirected,withinaleadof50metres: OrdinaryRock
3Earth work in bulk excavation by manual means over areas (exceeding 30 cm indepth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5m, as directed by Engineer-in-Charge.
4Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspitsand the like not exceeding 10 Sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil:
5Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspitsand the like not exceeding 10 Sqm on plan, including dressing of sides and ramming of bottoms lift upto1.5m, including getting out excavated earth and disposal of surplus excavated earth as directed: Ordinary Rock
6Earth work in bulk excavation by manual means over areas (exceeding 30 cm indepth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5m, as directed by Engineer-in-Charge. Ordinary rock
7Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement:4 coarse sand:8 graded stone aggregate 40 mm nominal size)
8Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1cement:3coarse sand:6graded stone aggregate 40mm nominal size)
9Providing and laying damp-proof Course 50mm thick with cement concrete1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate 20mm nominal size) and curing complete
10Reinforced cement concrete work in walls (any thickness) including attached pilasters,buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1cement:1½ coarse sand:3 graded stone aggregate 20mm nominal size)
11Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars
12Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1cement: 3 coarse sand:6 graded stone aggregate 20mm nominal size)
13Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement ,including admixtures in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve work ability without impairing strength and durability as per direction of Engineer-in-charge. Note: - Cement in this item is @ 330 kg/ Cum. Excess or less cement used as per design mix is content considered payable or recoverable separately. All works upto plinth level
14Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement ,including admixtures in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve work ability without impairing strength and durability as per direction of Engineer-in-charge. Note: - Cement in this item is @ 330 kg/ Cum. Excess or less cement used as per design mix is content considered payable or recoverable separately. All works above plinth level upto floor V level
15Extra for providing richer mixes at all floor levels. Note:-Excess/less cement over the specified cement content used is payable/recoverable separately. Providing M-30 grade concrete instead of M-25 grade BMC/RMC.
16Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°,landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiralstair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3(1cement:1½ coarse sand: 3 graded stone aggregate 20mm nominal size)
17Reinforced cement concrete work in arches, archribs, domes, vaults shells, folded plate and roofs having slope more than 15° upto floor five level level including curing but excluding the cost of centering, shuttering finishing and reinforcement with: 1:1½:3(1cement: 1½ coarses and: 3 graded stone aggregate 20 mm nominal size)
18Providing and mixing water proofing material in cement concrete work in doses by weight of cement as per manufacturer’s specification. (1 kg of water proofing material in 50 kg of cement)
19Welding, including transportation of plant at site etc. complete. By electric plant
20Brick work with common burnt clay (non-modular )bricks of class designation7.5in foundation and plinth including curing in : Cement mortar1:6(1cement:6coarsesand)
21Extra for brick work with common burnt clay bricks/ cement concrete bricks in superstructure above plinth level upto floor five level
22Structural steel work in built up sections,trusses and framed work,including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded with MS Grills
23Providing and fixing M.S. grills of required pattern in frames of windows etc.with M.S. flats, square or round bars etc including priming coat with approved steel primer all complete. Fixed to steel windows by welding
24Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
25Extra for shuttering in circular works (20%)
26Centering and shuttering including strutting, propping etc. and removal of form work for: Chimney and shafts
27Centering and shuttering including strutting, propping etc. and removal of form work for: Extra for Chimney and shafts
28Centering and shuttering including strutting, propping etc.and removal of form for: Lintel, beams, plinth beams,girders, bressumers and cantilevers.
29Extra for shuttering in circular works (20%)
30Centering and shuttering including strutting, propping etc.and removal of form for: Suspended floors,roofs, landings, balconies and access plat forms.
31Centering and shuttering including strutting, propping etc. and removal of form work for: Edges of slabs and breaks in floors and walls
32Centering and shuttering including strutting, propping etc. and removal of form work for: Arches ,domes, vaults upto 6m span
33Centering and shuttering including strutting, propping etc. and removal of form work for: Extra for arches, domes, vaults exceeding 6m span
34Providing and fixing S.C.I. S & S 100 mm dia bend
35Hand-packing stones in wire-crates; excluding cost o fcrates and stones
36Providing and fixing of GP Sheet Plain 1mm thick for joint of life
37Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 gradedstoneaggregate) finished with a floating coat of neat cement including cementslurry and curing complete, but excluding the cost of nosing of steps etc.complete. 50 mm thick with 20mm nominal size stone aggregate.
38Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 gradedstoneaggregate) finished with a floating coat of neat cement including cementslurry and curing complete, but excluding the cost of nosing of steps etc.complete. 40 mm thick with 20mm nominal size stone aggregate.
39Cement plaster1:3 (1cement:3coarse sand) finished with a floating coat of neat cement. 12mm cement plaster
40CEMENTPLASTER (INCOARSE SAND) 12mm Cement plaster of mix: (1 cement:4 coarse sand)
4115mm Cement plaster on the rough side of single or half brick wall of mix: 1:4 (1 cement: 4 fine sand)
42Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement: 2 coarsesand: 4 stone aggregate 10 mm and down gauge), including finishing with cement mortar 1:3 (1 cement: 3 fine sand) as per standard design. In 75x75mm deep chase.
43Supply of stone boulder (nallah) nominal size 225 mm
44Supplying and fixing C.I. cover without frame for manholes: 455x610mm rectangular C.I. cover and ladder (light duty) the weight of the cover to be not less than 23kg.
45Providng and fixing G.I. Pipes complete with G.I. Fitting excluding trenching and refilling etc. (externalwork) 100mm dia(M)
46Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) 65 mm dia (L). nominal bore
47Filling available excavated earth (excluding rock) intrenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50m and lift upto 1.5m.
48Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3mm M.S. gusset plates at the junctions and corners, al lnecessary fittings complete, including applying a priming coat of approved steel primer. Using M.S. angles 40x40x6 mm for diagonal braces
49Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:1½:3 (1 cement: 1½coarse sand: 3 graded stone aggregate 20 mm nominal size)
50Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. Two or more coats on new work
51Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @3.84kg/10Sqm)
52Distempering with dry distemper of approved brand and manufacture (two or more coats)and of required shade on new work, over and including water thinnable priming coat to give an even shade
53Applying priming coat : With ready mixed red oxide Zinc Chromate primer of approved brand and manufacture on steel galvanized iron/steel works
54Finishing walls with water proofing cement paint of required shade: Old work (one or more coats applied @ 2.20 kg/10Sqm) over priming coat of primer applied @0.80liters/10Sqm complete including cost of priming coat.
55Making plinth protection 50mm thic kof cement concrete 1:3:6 (1 cement: 3coarses and: 6 graded stone aggregate 20 mm nominal size) over 75mm bed of dry brick ballast 40mm nominal size well rammed and consolidated and grouted with fines and including finishing the top smooth and curing complete
56Providing and fitting concealed internal Electrification of room including 4 Nos LED lights, Fan points 2 No., Fuse box 1 No., 2 no 15 Amp sockets with switch, 5 Amp 2 no. sockets with switch - of approved brand and 04 nos LED security lights 30 watts, Main switch with complete wiring, with MS bracket for pole mounting complete including service line up to a length of 10 meters.
57Providing supply and carriage up to site of work of knitted wire crates 6.00 x1.50 x1.50 mtr
58Carriage of sand/stone aggregate 20mm nominal sizae from source (to be identified by Engineer in charge) to site of work including cost for loading , unloading & stacking for an av. distance of Average 20 km by MT & 1000Mtr By H/load
59Carriage of stone aggregate (Crushed) 20 mm nominal size from source (to be identified by Engineer in charge) to site of work including cost for loading , unloading & stacking for an av. distance of Average 20 km by MT & 1000Mtr by H/load
60Carriage of stone aggregate (Crushed) 40 mm nominal size and above from source (to be identified by Engineer in charge) to site of work including cost for loading , unloading & stacking for an av. distance of Average 20 km by MT & 1000Mtr by H/load
61Carriage of sand/Stone below 40mm from source (to be identified by Engineer in charge) to site of work including cost for loading , unloading & stacking for an av. distance of Average 15 km by MT & 500Mtr By H/load
62Carriage of stone boulder from source (to be identified by Engineer in charge) to site of work including cost for loading , unloading & stacking for an av. distance of Average 5km
63Carriage of Bricks from source (to be identified by Engineer in charge) to site of work including cost for loading , unloading & stacking for an av. distance of Average 20 km by MT & 1000Mtr by H/load
64Carriage of Pipes from source (to be identified by Engineer in charge) to site of work including cost for loading , unloading & stacking for an av. distance of 1000Mtr by H/load (GI Pipe) Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56325997
AUTHORITY Government Departments
TENDER VALUE 87.42 Lakhs
LAST DATE 14-07-2026
Authority
Authority Name Public Health Engineering Department
Work Description Tender for Permanent Restoration Works Damages Occurred During The Month Of August & Sepetember 2025 W.R.T. Varous Water Supply Schemes Of Sub-Division Kandi-Ii (Jandrah, Badsoo, Panjgrain, Marh & Jagti) Part-2 Under (Sasci 2026-27)1. Construction Of Pump Room Building At Korga Under Water Supply Scheme Korga.2. Construction Of Retaining Wall At 50,000 Glns 2Nd Stage Korga Under Water Supply Scheme Korga3. Providing Protection Work With Wire Crates At Existing Dug Well And Proposed Dug Well At River Tawi Under Water Supply Scheme Patyadi4. Construction Of Pump Room Building At Sahnoo Under Water Supply Scheme Sahnoo5. Providing Protection Work With Wire Crates At Sahnoo Under Water Supply Scheme Sahnoo.6. Repair Of 5000 Gph Rsfp At Bargay Sahnoo..7. Providing, Laying And Fitting Of Gi Pipe At Kanyala Under Water Supply Scheme Kanyala Kahpota.8. Providing Protection Work With Wire Crates At Old Dugwell And New Dugwell At Hurlani Under Water Supply Scheme Hurlani.9.Cconstruction Of 30,000 Glns Gsr At Badsoo Under Water Supply Scheme Badsoo.10. Providing Protection Work With Wire Crates At New Dug Well At River Tawi At Badsoo Under Water Supply Scheme Badsoo
Basic Detail
Tender No e-NIT No. 15 of 2026-27
Bidding Type Tender
Location
City Jammu
State Jammu and Kashmir
Key Dates
Publish Date 06 Jul 2026
Submission Date 14 Jul 2026
Open Date 15 Jul 2026
Finance
Tender Value 87.42 Lakhs
Tender Fee 1000
EMD 1.74 Lakhs
Exemption Not Available
Document List
6e7842a5-8e92-45c4-a08a-29ad39d06b93.html
Tendernotice_1.pdf
BOQ_1019535.xls

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 06, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 14, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Today
Jul 15, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 1 day

Tender Documents

Download All (ZIP) ↓
html

6e7842a5-8e92-45c4-a08a-29ad39d06b93.html

pdf

Tendernotice_1.pdf

xls

BOQ_1019535.xls

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders