Supply Of SNI C/S ALU. EXT. LUG. RACK-MEMU-JK-TC
Tender Overview
Project Description
Supply Of sni c/s alu. ext. lug. rack-memu-jk-tc , supply and installation of one coach set of luggage rack for memu/dmc/jk and memu/dmc2/jk coaches to drg. no. memu/dmc/jk(944)-6-2-001, alt-nil,col-i. installation is required as per assembly drawing, fasteners required for installation is under firm s scope. [ warranty period: 30 months after the date of delivery ] ] , supply and installation of one coach set of luggage rack for memu/tc/jk c oaches to drg. no. memu/dmc/jk(944)-6-2-001, alt-nil, col-3. installation is required as per assembly drawing, fasteners required for installation is under firms scope. [ warranty period: 30 months after the date of delivery ] ]
BOQ
| Sl. No. | Item Description |
|---|---|
| 1 | SUPPLY AND INSTALLATION OF ONE COACH SET OF LUGGAGE RACK FOR MEMU/DMC/JK AND MEMU/DMC2/JK COACHES TO DRG. No. MEMU/DMC/JK(944)-6-2-001, ALT-nil,COL-I. INSTALLATION IS REQUIRED AS PER ASSEMBLY DRAWING, FASTENERS REQUIRED FOR INSTALLATION IS UNDER FIRM S SCOPE. [ Warranty Period: 30 Months after the date of delivery ] ] |
| 2 | SUPPLY AND INSTALLATION OF ONE COACH SET OF LUGGAGE RACK FOR MEMU/TC/JK C OACHES TO DRG. No. MEMU/DMC/JK(944)-6-2-001, ALT-nil, COL-3. INSTALLATION IS REQUIRED AS PER ASSEMBLY DRAWING, FASTENERS REQUIRED FOR INSTALLATION IS UNDER FIRMS SCOPE. [ Warranty Period: 30 Months after the date of delivery ] ] |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 16 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender