Water Resources and Irrigation Local Bodies Closing in 5 days TDR #56316031

Tender For O&M - Water Supply Schemes-O&M - Water Supply Schemes-Mace Of Water Supply Scheme To Ananganadi -Annual Maintenance Of Various Works Of Water Supply Scheme To Ananganadi Under Ph Section Ottappalam For The Year 2026 -27-Mace-General Civil

Issued by Local Bodies · Palakkad, Kerala
Tender Value
13.49 Lakhs
Estimated cost
Bid Submission
15 Jul 2026
5 days left
EMD
33742
Bank guarantee accepted
Document Fee
2760
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Palakkad → Kerala
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for O&M - Water Supply Schemes-O&M - Water Supply Schemes-Mace Of Water Supply Scheme To Ananganadi -Annual Maintenance Of Various Works Of Water Supply Scheme To Ananganadi Under Ph Section Ottappalam For The Year 2026 -27-Mace-General Civil Work

BOQ

Name of Work:- O&M - Water Supply Schemes-O&M - Water Supply Schemes-Mace of WSS to Ananganadi -Annual Maintenance of Various Works of WSS to Ananganadi under PH Section Ottappalam for the Year 2026 -27-mace-General Civil Work
Sl. No. Item Description
1Leak Rectification Work in PVC Pipeline
2100.47.1.1:Leak rectification work in 32mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
3100.47.1.4:Leak rectification work in 63mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
4100.47.1.5:Leak rectification work in 75mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
5100.47.1.6:Leak rectification work in 90mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
6100.47.2.1:Leak rectification work in 90mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, ribbon fencing, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & C.I.R. Jointing.
7OD281877/2025-2026:Leak rectification work in 110mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, ribbon fencing, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket Jointing.
8100.47.2.2:Leak rectification work in 110mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, ribbon fencing, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & C.I.R. Jointing.
9100.47.2.3:Leak rectification work in 140mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, ribbon fencing, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & C.I.R. Jointing.
10100.47.3.3.a:Leak rectification work in 140 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damage to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, ribbon fencing, lighting, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: C.I.R. Jointing.
11100.47.2.4:Leak rectification work in 160mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, ribbon fencing, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & C.I.R. Jointing.
12100.47.3.4:Leak rectification work in 160mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damage to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, ribbon fencing, lighting, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: C.I.R. Jointing.
13OD281876/2025-2026:Inter Linking works to the existing pipe line from newly laid pipe line/existing pipe line including earth work excavation,labour engaged for inter linking works,bailing out water ans all other incidential charges of sizes vaies from 63mm to 180mm PVC pipe ,but excloding the cost of specials
14Leak Rectification Work in HDPE Pipeline
15OD318414/2025-2026:Leak rectification work in 160 mm hdpe pipe PE100 (IS 4984/1995), 10kg line includingdetecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portionof the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicularto the axis of pipeline without causing any damages to the balance portion, dismantling andlifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting andlowering new pipe into the trenches, placing in position, aligning the pipe to line and level andjointing the new pipe with the existing pipe with hdpe coupler and testing the pipeline byoperating the valves concerned, and rectifying the defects if noticed and refilling the trenches inlayers not exceeding 20cm depth including consolidating each layers by ramming, watering,charges for removing surplus soil from work site, without causing any damage to the existingutilities, including hire for tools and plant, conveyance of tools and materials, bailing out water,providing caution boards, ribbon fencing, lighting, watching, traffic control etc., complete asperthe direction of Departmental officers, including the cost of pipe .
16OD318415/2025-2026:Leak rectification work in 140mm hdpe pipe PE100 (IS 4984/1995), 10kg line includingdetecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portionof the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicularto the axis of pipeline without causing any damages to the balance portion, dismantling andlifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting andlowering new pipe into the trenches, placing in position, aligning the pipe to line and level andjointing the new pipe with the existing pipe with hdpe coupler and testing the pipeline byoperating the valves concerned, and rectifying the defects if noticed and refilling the trenches inlayers not exceeding 20cm depth including consolidating each layers by ramming, watering,charges for removing surplus soil from work site, without causing any damage to the existingutilities, including hire for tools and plant, conveyance of tools and materials, bailing out water,providing caution boards, ribbon fencing, lighting, watching, traffic control etc., complete asper the direction of Departmental officers, including the cost of pipe .
17OD318416/2025-2026:Leak rectification work in 110mm hdpe pipe PE100 (IS 4984/1995), 10kg line includingdetecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portionof the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicularto the axis of pipeline without causing any damages to the balance portion, dismantling andlifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting andlowering new pipe into the trenches, placing in position, aligning the pipe to line and level andjointing the new pipe with the existing pipe with hdpe coupler and testing the pipeline byoperating the valves concerned, and rectifying the defects if noticed and refilling the trenches inlayers not exceeding 20cm depth including consolidating each layers by ramming, watering,charges for removing surplus soil from work site, without causing any damage to the existingutilities, including hire for tools and plant, conveyance of tools and materials, bailing out water,providing caution boards, ribbon fencing, lighting, watching, traffic control etc., complete asper the direction of Departmental officers, including the cost of pipe .
18OD318417/2025-2026:Leak rectification work in 90mm hdpe pipe PE100 (IS 4984/1995), 10kg line includingdetecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portionof the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicularto the axis of pipeline without causing any damages to the balance portion, dismantling andlifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting andlowering new pipe into the trenches, placing in position, aligning the pipe to line and level andjointing the new pipe with the existing pipe with hdpe coupler and testing the pipeline byoperating the valves concerned, and rectifying the defects if noticed and refilling the trenches inlayers not exceeding 20cm depth including consolidating each layers by ramming, watering,charges for removing surplus soil from work site, without causing any damage to the existingutilities, including hire for tools and plant, conveyance of tools and materials, bailing out water,providing caution boards, ribbon fencing, lighting, watching, traffic control etc., complete asper the direction of Departmental officers, including the cost of pipe .
19Leak Rectification Work in AC Pipeline
20100.46.1.1:Repairing leakage/breakage of 80mm A.C. pipeline by cutting and dismantling the damaged pipe portion (up to 1.5m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints.
21100.46.1.4:Repairing leakage/breakage of 150mm A.C. pipeline by cutting and dismantling the damaged pipe portion (up to 1.5m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints.
22100.46.1.6:Repairing leakage/breakage of 200mm A.C. pipeline by cutting and dismantling the damaged pipe portion (up to 1.5m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints.
23Leak Rectification Work in GI Pipeline
24100.50.3.1:Rectification of leakages of 50mm G.I. Pipes in exposed portions by replacing lengths up to 1.0m by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with G.I. Pipes of suitable size and jointing by three run welding to make a water tight joint, painting the welded portion, testing the line to the required pressure, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, necessary scaffolding including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc., complete.
25100.50.3.2:Rectification of leakages of 65mm G.I. Pipes in exposed portions by replacing lengths up to 1.0m by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with G.I. Pipes of suitable size and jointing by three run welding to make a water tight joint, painting the welded portion, testing the line to the required pressure, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, necessary scaffolding including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc., complete.
26100.50.2.2:Rectification of leakages of 65mm G.I. Pipes in exposed portions by replacing lengths up to 1.0m by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with G.I. Pipes of suitable size and jointing by thraded coupler and union of suitable size including threading, alignement, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, necessary scaffolding including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc., complete.
27100.50.2.3:Rectification of leakages of 80mm G.I. Pipes in exposed portions by replacing lengths up to 1.0m by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with G.I. Pipes of suitable size and jointing by thraded coupler and union of suitable size including threading, alignement, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, necessary scaffolding including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc., complete.
28100.37.1:Cutting M.S. sheet, pipe and specials by gas cutting including cost of gas, all labour and hire charges of tools etc., complete.
29100.37.2:Grinding the cut edges / welded portions in M.S. sheet, pipe and specials by grinding machine including all labour and hire charges of tools etc., complete.
30100.37.3:Welding M.S. sheet, pipe and special by gas or electric plant for three run welding including cost of welding rod / gas, all labour and hire charges of tools etc., complete.
31Leak Rectification works in DI Pipeline
32100.49.1.9:Rectification of joint leakages in 500mm D.I. Pipe (cutting, removing and laying back a length of 1.0m from one side of the joint) including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, by cutting and removing a portion of pipe from the damaged joint without causing any damages to the remaining portion of the line and specials and replacing the pipe with mechanical and tyton joint after cleaning the ends, centering the pipe, providing the joints, testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of mechanical joint and as per the direction of departmental officers etc., complete.
33100.49.1.7:Rectification of joint leakages in 400mm D.I. Pipe (cutting, removing and laying back a length of 1.0m from one side of the joint) including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, by cutting and removing a portion of pipe from the damaged joint without causing any damages to the remaining portion of the line and specials and replacing the pipe with mechanical and tyton joint after cleaning the ends, centering the pipe, providing the joints, testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of mechanical joint and as per the direction of departmental officers etc., complete.
34100.49.1.6:Rectification of joint leakages in 350mm D.I. Pipe (cutting, removing and laying back a length of 1.0m from one side of the joint) including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, by cutting and removing a portion of pipe from the damaged joint without causing any damages to the remaining portion of the line and specials and replacing the pipe with mechanical and tyton joint after cleaning the ends, centering the pipe, providing the joints, testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of mechanical joint and as per the direction of departmental officers etc., complete.
35100.49.1.5:Rectification of joint leakages in 300mm D.I. Pipe (cutting, removing and laying back a length of 1.0m from one side of the joint) including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, by cutting and removing a portion of pipe from the damaged joint without causing any damages to the remaining portion of the line and specials and replacing the pipe with mechanical and tyton joint after cleaning the ends, centering the pipe, providing the joints, testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of mechanical joint and as per the direction of departmental officers etc., complete.
36Supply of Control Valves,Air Valves & Repairing works
37100.31.2.1:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 80mm diameter, Class II.
38100.31.1.4:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 150mm diameter, Class I.
39100.31.2.5:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 200mm diameter, Class II.
40100.31.2.9:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 400mm diameter, Class II.
41100.98.440:Supply of CI Air Valve, Conforming to IS 14848 - 2000, Single Orifice, Small Orifice Type S1, Size 25mm.
42100.98.436:Supply of CI Air Valve, Conforming to IS 14848 - 2000, Kinetic Air Valve Type DK, Size 80mm.
43100.98.493:Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Hand Wheel PN 1.0, Size 80mm.
44100.98.472:Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Cap PN 1.0, Size 150mm.
45100.98.461:Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Cap PN 1.6, Size 200mm.
46100.98.465:Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Cap PN 1.6, Size 400mm.
47OD281883/2025-2026:Repairing the leak of valve by removing the damaged gland packing, providing new gland packing, including operating the valve and all labour charges including cost of materials etc complete as per the direction of departmental officers : 80/150/200/400 mm GM/Sluice Valve
48OD281882/2025-2026:Repairing the leak of valve by removing the damaged hempand providing new hemp , including operating the valve and all labour charges including cost of materials etc complete as per the direction of departmental officers : 80/150/200/400 mm Sluice valves
49OD281884/2025-2026:Repairing the leak of 25/32/65/80 mm Air valve by removing the damaged ball with providing new ball including all operation of the valve, bailing out water, including the cost of ball and grease ,etc. complete as per the direction of the departmental officers.
50Engaging Labour
51100.98.1008:Engaging Coolie.
52100.98.1009:Engaging Fitter ( grade 1).
53100.98.1010:Engaging Assistant Fitter or 2nd class fitter.
54Supply and Fixing of Additional Pipe and Specials
55100.98.229:Supply of PVC Pipe, 10kg/cm2, 20mm Dia.
56100.98.230:Supply of PVC Pipe, 10kg/cm2, 25mm Dia.
57100.98.231:Supply of PVC Pipe, 10kg/cm2, 32mm Dia.
58100.98.209:Supply of PVC Pipe, 6kg/cm2, 40mm Dia.
59100.98.210:Supply of PVC Pipe, 6kg/cm2, 50mm Dia.
60100.98.211:Supply of PVC Pipe, 6kg/cm2, 63mm Dia.
61100.98.212:Supply of PVC Pipe, 6kg/cm2, 75mm Dia.
62100.98.213:Supply of PVC Pipe, 6kg/cm2, 90mm Dia.
63100.98.49:Supply of PVC Saddle Piece (Average rate of 200/160/140/110/90/75/ 63/ 50 mm).
64100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
65100.9.1:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 20 mm nominal outside diameter pipes.
66100.9.2:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 25 mm nominal outside diameter pipes.
67100.9.3:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 32 mm nominal outside diameter pipes.
68100.9.4:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 40 mm nominal outside diameter pipes.
69100.9.5:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 50 mm nominal outside diameter pipes.
70100.9.6:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 63 mm nominal outside diameter pipes.
71100.9.7:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 75 mm nominal outside diameter pipes.
72100.9.8:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 90 mm nominal outside diameter pipes.
73100.12.1:Conveying and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc., but excluding cost of pipes and fittings for External work: 15mm diameter nominal bore.
74100.12.2:Conveying and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc., but excluding cost of pipes and fittings for External work: 20mm diameter nominal bore.
75100.12.3:Conveying and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc., but excluding cost of pipes and fittings for External work: 25mm diameter nominal bore.
76100.12.4:Conveying and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc., but excluding cost of pipes and fittings for External work: 32mm diameter nominal bore.
77100.12.5:Conveying and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc., but excluding cost of pipes and fittings for External work: 40mm diameter nominal bore.
78100.12.6:Conveying and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc., but excluding cost of pipes and fittings for External work: 50mm diameter nominal bore.
79100.12.7:Conveying and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc., but excluding cost of pipes and fittings for External work: 65mm diameter nominal bore.
80100.12.8:Conveying and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc., but excluding cost of pipes and fittings for External work: 80mm diameter nominal bore.
81100.12.9:Conveying and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc., but excluding cost of pipes and fittings for External work: 100mm diameter nominal bore.
8218.12.2:Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work20 mm dia nominal bore
8318.12.3:Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work25 mm dia nominal bore
8418.12.4:Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work32 mm dia nominal bore
8518.12.5:Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work40 mm dia nominal bore
8618.12.6:Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work50 mm dia nominal bore
8718.12.7:Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work65 mm dia nominal bore
8818.12.8:Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work80 mm dia nominal bore
89100.98.23:Supply of PVC Coupling 90mm, 8 kg/cm2.
90OD281943/2025-2026:Supplying and fixing 40X32 mm PVC Reducer
91OD281904/2025-2026:Supplying and fixing 63X50 mm PVC Reducer
92OD281931/2025-2026:Supplying and fixing 75X63 mm PVC Reducer
93OD281909/2025-2026:Supplying and fixing 90X75 mm PVC Reducer
94OD281926/2025-2026:Supplying and fixing 110X90 mm PVC Reducer
95OD281885/2025-2026:Supply and fixing of 110mm PVC Tee
96OD281950/2025-2026:Supply and fixing of 90mm PVC Tee
97OD281935/2025-2026:Supply and fixing of 75mm PVC Tee
98OD281892/2025-2026:Supply and fixing of 63mm PVC Tee
99OD281912/2025-2026:Supply and fixing of 50mm PVC Tee
100OD281914/2025-2026:Supply and fixing of 40mm PVC Tee
101OD281928/2025-2026:Supply and fixing of 32mm PVC Tee
102OD281923/2025-2026:Supplying and fixing 110mm PVC Bend/Elbow
103OD281908/2025-2026:Supplying and fixing 90mm PVC Bend/Elbow
104OD281900/2025-2026:Supplying and fixing 75mm PVC Bend/Elbow
105OD281899/2025-2026:Supplying and fixing 63mm PVC Bend/Elbow
106OD281944/2025-2026:Supplying and fixing 50mm PVC Bend/Elbow
107OD281911/2025-2026:Supplying and fixing 40mm PVC Bend/Elbow
108OD281934/2025-2026:Supplying and fixing 32mm PVC Bend/Elbow
109OD281941/2025-2026:Supplying and fixing 110mm FTA/MTA
110OD281942/2025-2026:Supplying and fixing 90mm FTA/MTA
111OD281949/2025-2026:Supplying and fixing 75mm FTA/MTA
112OD281891/2025-2026:Supplying and fixing 63mm FTA/MTA
113OD281915/2025-2026:Supplying and fixing 50mm FTA/MTA
114OD281890/2025-2026:Supplying and fixing 40mm FTA/MTA
115OD281948/2025-2026:Supplying and fixing 32mm FTA/MTA
116OD281887/2025-2026:Supplying and fixing 90mm PVC Ball Valve
117OD281919/2025-2026:Supplying and fixing 75mm PVC Ball Valve
118OD281917/2025-2026:Supplying and fixing 50mm PVC Ball Valve
119OD281905/2025-2026:Supplying and fixing 40mm PVC Ball Valve
120OD281895/2025-2026:Supplying and fixing 32mm PVC Ball Valve
121OD281924/2025-2026:Supplying and fixing 25mm PVC Ball Valve
122OD281897/2025-2026:Supplying of 100mm GI Pipe, Medium class
12318.18.1:Providing and fixing ball valve (brass) of approved quality, High or low pressure, with plastic floats complete:15 mm nominal bore
124100.98.31:Supply of GI Threaded Coupling, 40mm.
125100.98.32:Supply of GI Threaded Coupling, 50mm.
126100.98.33:Supply of GI Threaded Coupling, 65mm.
127100.98.34:Supply of GI Threaded Coupling, 80mm.
128100.98.41:Supply of GI Plug, 20mm.
12918.18.2:Providing and fixing ball valve (brass) of approved quality, High or low pressure, with plastic floats complete:20 mm nominal bore
13018.18.3:Providing and fixing ball valve (brass) of approved quality, High or low pressure, with plastic floats complete:25 mm nominal bore
131OD281920/2025-2026:Supply of 80mm CID Joints with Accessories
132OD281889/2025-2026:Supply of 100mm CID Joints with Accessories
133OD281947/2025-2026:Supply of 125mm CID Joints with Accessories
134OD281896/2025-2026:Supply of 150mm CID Joints with Accessories
135OD281898/2025-2026:Supplying and Fixing 75mm CIR Joint with all accessories
136OD281927/2025-2026:Supply of 90mm CIR Joint with accessories
137OD281945/2025-2026:Supply of 110mm CIR Joint with accessories
138OD281916/2025-2026:Supply of 140mm CIR Joint with accessories
139OD281940/2025-2026:Supply of 160mm CIR Joint with accessories
140OD281910/2025-2026:Supplying and fixing 125,150/ 140,160 mm CID/CIR Rubber ring
141OD281930/2025-2026:Supplying and fixing 80,100/90,110 mm CID/CIR Rubber ring
142OD281918/2025-2026:Supplying and fixing 50/63/75mm CIR Rubber ring
143OD281902/2025-2026:Supply and fixing of various type bolt and nut
144OD281929/2025-2026:Supplying and fixing 50/40mm MS Saddle/Clamp including washer nut bolt etc complete
145OD281903/2025-2026:Supplying and fixing 80/65mm MS Saddle/Clamp including washer nut bolt etc complete
146OD281932/2025-2026:Supplying and fixing 100mm MS Saddle/Clamp including washer nut bolt etc complete
147OD281888/2025-2026:Supplying and fixing 150/125 mm MS Saddle/Clamp including washer nut bolt etc complete
148OD281921/2025-2026:Supplying and fixing 150mm MS/CI Flange Including Rubber gasket washer
149OD281901/2025-2026:Supplying and fixing 125mm MS/CI Flange Including Rubber gasket washer
150OD281913/2025-2026:Supplying and fixing 100mm MS/CI Flange Including Rubber gasket washer
151OD281936/2025-2026:Supplying and fixing 80mm MS/CI Flange Including Rubber gasket washer
152OD281925/2025-2026:Supplying and fixing 65mm MS/CI Flange Including Rubber gasket washer
153OD281937/2025-2026:Supplying and fixing 50mm MS/CI Flange Including Rubber gasket washer
154OD281922/2025-2026:Supplying and fixing 80 mm GI TEE
155OD281907/2025-2026:Supplying and fixing 65/50 mm GI TEE
156OD281886/2025-2026:Supplying and fixing 40/32 mm GI TEE
157OD281906/2025-2026:Supplying and fixing 20/15 mm GI TEE
158OD281894/2025-2026:Supplying and fixing 40X50 / 65X50 mm GI reducer
159OD281938/2025-2026:Supply and fixing of 80 mm GI bend
160OD281946/2025-2026:Supply and fixing of 32/40 mm GI bend
161OD281939/2025-2026:Supply and fixing of 15/20 mm GI bend
162OD281893/2025-2026:Supply and fixing 32/40mm GI Elbow
163OD281933/2025-2026:Supply and fixing 15/20mm GI Elbow
164Various works in Service connection and Public Taps
165100.51.1: Disconnecting water connection from service mains along earthern road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting if any, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete.
166100.60.4.1:Plugging the existing 15mm (1/2 inch) connection near boring point using 20mm Indian Standard Class 6 uPVC End Cap, during alteration works, including cost of materials and consumables and charges for lighting, watching, providing caution boards etc. complete , including the cost of earthwork excavation in all kinds of soil, but excluding the cost of cutting of concrete / tarred / bituminous roads and as per directions of the department officers
167OD281880/2025-2026:Temporary disconnection of water connection at the meter point including the all Labour charges and material charges,etc complete as per the direction of Departmental officers.
168OD281881/2025-2026:Towards the charges of Reconnection of temporary disconnected water connection at service line/meter point including all labour charges ,complete as per the direction of departmental officers.
169100.57.1:Rectifying the leakages in boring point of public tap connection including earth work excavation in all kinds of soil for exposing the boring point including concrete / tar cutting, dismantling the damaged saddle piece,cutting and removing damaged portion of pipe line,fixing new saddle piece,laying 20/25 mm PVC 10Kg/cm2 pipe in place of damaged portion of pipe and connecting with existing pipe line,testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including cost of pipe and saddle piece and as per the direction of departmental officers etc. complete.
170100.56.1:Supplying and fixing 15 / 20 mm PVC public tap after dismantling the damaged tap including all cost of materials, labour charges, hire for tools and as per the direction of the department officers etc complete.
171100.58.1:Rectifying the leakages in vertical pipe of public tap connection including earth work excavation in all kinds of soil for exposing the pipeline including concrete / tar cutting, cutting and removing damaged portion of pipe, fixing new 20/25 mm GI pipe and specials in place of damaged portion of pipe and connecting with existing pipe line, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including cost of pipe and specials and as per the direction of departmental officers etc. complete.
172Scouring & Conveyance Works
1732.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
1742.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
17550.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
176OD281952/2025-2026:Total cost for conveyance by Goods autorickshaw
177OD281951/2025-2026:Towards the charges of Pipeline scouring by using air compressor including all labour charges, hire charges etc, complete as per the direction of departmental officers
178OD281953/2025-2026:Hire Charges of Generator
179Road Restoration and Dismantling Works
180100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation.
18115.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
18215.43.2:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road
183100.59.3:Restoring the road surfaces by providing and laying factory made cold bitumen-aggregate pot-hole repair mix in two layers of 25mm thick (total 50mm thick), by cleaning the surface with brooms etc. to remove dust/debris/water etc, placing the premix, compacting properly with hand-rammer etc. complete, including traffic control, providing caution boards and as per direction of Engineer-in-charge for road restoration works in pipeline leak sites.
18416.78.1:Construction of granular sub- base by Providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, Carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in- Charge.With Material conforming to Grade - I ( size range 75 mm to 0.075 mm) having CBR Value- 30
185OD281878/2025-2026:Supplying,spreading and compacting Coarse sand (zone III) in the trenches as per standard norms, including cost of all materials.
1864.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
187OD281879/2025-2026:Conveying ,Supplying and Providing of Shelmack including all charges etc.complete Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56316031
AUTHORITY Local Bodies
TENDER VALUE 13.49 Lakhs
LAST DATE 15-07-2026
Authority
Authority Name Kerala Water Authority
Work Description Tender for O&M - Water Supply Schemes-O&M - Water Supply Schemes-Mace Of Water Supply Scheme To Ananganadi -Annual Maintenance Of Various Works Of Water Supply Scheme To Ananganadi Under Ph Section Ottappalam For The Year 2026 -27-Mace-General Civil Work
Basic Detail
Tender No WRD/KWA-CE(NR)/TR/871/2026
Bidding Type Tender
Location
City Palakkad
State Kerala
Key Dates
Publish Date 04 Jul 2026
Submission Date 15 Jul 2026
Open Date 16 Jul 2026
Finance
Tender Value 13.49 Lakhs
Tender Fee 2760
EMD 33742
Exemption Not Available
Document List
2.pdf
3.pdf
BOQ_1452372.xls
e90d680a-fa5e-4d2f-a988-7e758f0e9c3d.html
KWAGeneralConditionsforeT_1.pdf
Tendernotice_1.pdf
viewsbd.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 04, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 15, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 5 days
Jul 16, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 6 days

Tender Documents

Download All (ZIP) ↓
pdf

2.pdf

pdf

3.pdf

xls

BOQ_1452372.xls

html

e90d680a-fa5e-4d2f-a988-7e758f0e9c3d.html

pdf

KWAGeneralConditionsforeT_1.pdf

pdf

Tendernotice_1.pdf

pdf

viewsbd.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders