Heavy Industries and Public Enterprises Boards / Undertakings / PSU Closing in 8 days TDR #56302869

Tender For Soil Investigation For Construction Of New Building For Sc Tachankunnu, Kozhikode District, Kerala

Issued by Boards / Undertakings / PSU · Thiruvananthapuram, Kerala
Tender Value
2.50 Lakhs
Estimated cost
Bid Submission
13 Jul 2026
8 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Thiruvananthapuram → Kerala
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Soil Investigation For Construction Of New Building For Sc Tachankunnu, Kozhikode District, Kerala

BOQ

Name of Work:- Soil investigation for Construction of new building for SC Tachankunnu, Kozhikode District, Kerala
Sl. No. Item Description
1SOIL TEST
2Conducting Topographical survey using digital Total station & Submission of Drawings
3Mobilization including transportation of all necessary plant and equipment’s and materials of boring, field testing and sampling, including loading & unloading, Site clearance needed if any and demobilization after completing the work. (Site visit may be done prior to quote)
4Setting up boring rig at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location including shifting of machine from bore hole to bore hole.
5Boring with rotary power drilling equipment’s in all types of soil excluding hard rock or medium rock for strata including conducting S.P.T and recovery of samples at specific intervals.
6Upto 10m
7For next 10m upto a depth of 20m
8From 20m to 30m depth from GL
9From 30m to 40m depth from GL
10Boring through soft rock/ boulders/laterite (except hard rock). N value >50 using Tungsten carbide core drilling as per specification.
110 to 10m
1210 to 20m
1320 to 30m
14Boring through hard rock / boulders using Tungsten carbide drill coring as per specification (minimum of 2.5m to 3m per borehole is required to assess the type of joints, rock etc.)
15A comprehensive report with Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab tests (report in triplicate) (three to five boreholes for a site)
16SOIL TEST
17Conducting Topographical survey using digital Total station & Submission of Drawings
18Mobilization including transportation of all necessary plant and equipment’s and materials of boring, field testing and sampling, including loading & unloading, Site clearance needed if any and demobilization after completing the work. (Site visit may be done prior to quote)
19Setting up boring rig at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location including shifting of machine from bore hole to bore hole.
20Boring with rotary power drilling equipment’s in all types of soil excluding hard rock or medium rock for strata including conducting S.P.T and recovery of samples at specific intervals.
21Upto 10m
22For next 10m upto a depth of 20m
23From 20m to 30m depth from GL
24From 30m to 40m depth from GL
25Boring through soft rock/ boulders/laterite (except hard rock). N value >50 using Tungsten carbide core drilling as per specification.
260 to 10m
2710 to 20m
2820 to 30m
29Boring through hard rock / boulders using Tungsten carbide drill coring as per specification (minimum of 2.5m to 3m per borehole is required to assess the type of joints, rock etc.)
30A comprehensive report with Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab tests (report in triplicate) (three to five boreholes for a site)
31SOIL TEST
32Conducting Topographical survey using digital Total station & Submission of Drawings
33Mobilization including transportation of all necessary plant and equipment’s and materials of boring, field testing and sampling, including loading & unloading, Site clearance needed if any and demobilization after completing the work. (Site visit may be done prior to quote)
34Setting up boring rig at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location including shifting of machine from bore hole to bore hole.
35Boring with rotary power drilling equipment’s in all types of soil excluding hard rock or medium rock for strata including conducting S.P.T and recovery of samples at specific intervals.
36Upto 10m
37For next 10m upto a depth of 20m
38From 20m to 30m depth from GL
39From 30m to 40m depth from GL
40Boring through soft rock/ boulders/laterite (except hard rock). N value >50 using Tungsten carbide core drilling as per specification.
410 to 10m
4210 to 20m
4320 to 30m
44Boring through hard rock / boulders using Tungsten carbide drill coring as per specification (minimum of 2.5m to 3m per borehole is required to assess the type of joints, rock etc.)
45A comprehensive report with Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab tests (report in triplicate) (three to five boreholes for a site)
46SOIL TEST
47Conducting Topographical survey using digital Total station & Submission of Drawings
48Mobilization including transportation of all necessary plant and equipment’s and materials of boring, field testing and sampling, including loading & unloading, Site clearance needed if any and demobilization after completing the work. (Site visit may be done prior to quote)
49Setting up boring rig at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location including shifting of machine from bore hole to bore hole.
50Boring with rotary power drilling equipment’s in all types of soil excluding hard rock or medium rock for strata including conducting S.P.T and recovery of samples at specific intervals.
51Upto 10m
52For next 10m upto a depth of 20m
53From 20m to 30m depth from GL
54From 30m to 40m depth from GL
55Boring through soft rock/ boulders/laterite (except hard rock). N value >50 using Tungsten carbide core drilling as per specification.
560 to 10m
5710 to 20m
5820 to 30m
59Boring through hard rock / boulders using Tungsten carbide drill coring as per specification (minimum of 2.5m to 3m per borehole is required to assess the type of joints, rock etc.)
60A comprehensive report with Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab tests (report in triplicate) (three to five boreholes for a site)
61SOIL TEST
62Conducting Topographical survey using digital Total station & Submission of Drawings
63Mobilization including transportation of all necessary plant and equipment’s and materials of boring, field testing and sampling, including loading & unloading, Site clearance needed if any and demobilization after completing the work. (Site visit may be done prior to quote)
64Setting up boring rig at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location including shifting of machine from bore hole to bore hole.
65Boring with rotary power drilling equipment’s in all types of soil excluding hard rock or medium rock for strata including conducting S.P.T and recovery of samples at specific intervals.
66Upto 10m
67For next 10m upto a depth of 20m
68From 20m to 30m depth from GL
69From 30m to 40m depth from GL
70Boring through soft rock/ boulders/laterite (except hard rock). N value >50 using Tungsten carbide core drilling as per specification.
710 to 10m
7210 to 20m
7320 to 30m
74Boring through hard rock / boulders using Tungsten carbide drill coring as per specification (minimum of 2.5m to 3m per borehole is required to assess the type of joints, rock etc.)
75A comprehensive report with Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab tests (report in triplicate) (three to five boreholes for a site)
76SOIL TEST
77Conducting Topographical survey using digital Total station & Submission of Drawings
78Mobilization including transportation of all necessary plant and equipment’s and materials of boring, field testing and sampling, including loading & unloading, Site clearance needed if any and demobilization after completing the work. (Site visit may be done prior to quote)
79Setting up boring rig at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location including shifting of machine from bore hole to bore hole.
80Boring with rotary power drilling equipment’s in all types of soil excluding hard rock or medium rock for strata including conducting S.P.T and recovery of samples at specific intervals.
81Upto 10m
82For next 10m upto a depth of 20m
83From 20m to 30m depth from GL
84From 30m to 40m depth from GL
85Boring through soft rock/ boulders/laterite (except hard rock). N value >50 using Tungsten carbide core drilling as per specification.
860 to 10m
8710 to 20m
8820 to 30m
89Boring through hard rock / boulders using Tungsten carbide drill coring as per specification (minimum of 2.5m to 3m per borehole is required to assess the type of joints, rock etc.)
90A comprehensive report with Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab tests (report in triplicate) (three to five boreholes for a site)
91SOIL TEST
92Conducting Topographical survey using digital Total station & Submission of Drawings
93Mobilization including transportation of all necessary plant and equipment’s and materials of boring, field testing and sampling, including loading & unloading, Site clearance needed if any and demobilization after completing the work. (Site visit may be done prior to quote)
94Setting up boring rig at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location including shifting of machine from bore hole to bore hole.
95Boring with rotary power drilling equipment’s in all types of soil excluding hard rock or medium rock for strata including conducting S.P.T and recovery of samples at specific intervals.
96Upto 10m
97For next 10m upto a depth of 20m
98From 20m to 30m depth from GL
99From 30m to 40m depth from GL
100Boring through soft rock/ boulders/laterite (except hard rock). N value >50 using Tungsten carbide core drilling as per specification.
1010 to 10m
10210 to 20m
10320 to 30m
104Boring through hard rock / boulders using Tungsten carbide drill coring as per specification (minimum of 2.5m to 3m per borehole is required to assess the type of joints, rock etc.)
105A comprehensive report with Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab tests (report in triplicate) (three to five boreholes for a site)
106SOIL TEST
107Conducting Topographical survey using digital Total station & Submission of Drawings
108Mobilization including transportation of all necessary plant and equipment’s and materials of boring, field testing and sampling, including loading & unloading, Site clearance needed if any and demobilization after completing the work. (Site visit may be done prior to quote)
109Setting up boring rig at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location including shifting of machine from bore hole to bore hole.
110Boring with rotary power drilling equipment’s in all types of soil excluding hard rock or medium rock for strata including conducting S.P.T and recovery of samples at specific intervals.
111Upto 10m
112For next 10m upto a depth of 20m
113From 20m to 30m depth from GL
114From 30m to 40m depth from GL
115Boring through soft rock/ boulders/laterite (except hard rock). N value >50 using Tungsten carbide core drilling as per specification.
1160 to 10m
11710 to 20m
11820 to 30m
119Boring through hard rock / boulders using Tungsten carbide drill coring as per specification (minimum of 2.5m to 3m per borehole is required to assess the type of joints, rock etc.)
120A comprehensive report with Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab tests (report in triplicate) (three to five boreholes for a site)
121SOIL TEST
122Conducting Topographical survey using digital Total station & Submission of Drawings
123Mobilization including transportation of all necessary plant and equipment’s and materials of boring, field testing and sampling, including loading & unloading, Site clearance needed if any and demobilization after completing the work. (Site visit may be done prior to quote)
124Setting up boring rig at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location including shifting of machine from bore hole to bore hole.
125Boring with rotary power drilling equipment’s in all types of soil excluding hard rock or medium rock for strata including conducting S.P.T and recovery of samples at specific intervals.
126Upto 10m
127For next 10m upto a depth of 20m
128From 20m to 30m depth from GL
129From 30m to 40m depth from GL
130Boring through soft rock/ boulders/laterite (except hard rock). N value >50 using Tungsten carbide core drilling as per specification.
1310 to 10m
13210 to 20m
13320 to 30m
134Boring through hard rock / boulders using Tungsten carbide drill coring as per specification (minimum of 2.5m to 3m per borehole is required to assess the type of joints, rock etc.)
135A comprehensive report with Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab tests (report in triplicate) (three to five boreholes for a site)
136SOIL TEST
137Conducting Topographical survey using digital Total station & Submission of Drawings
138Mobilization including transportation of all necessary plant and equipment’s and materials of boring, field testing and sampling, including loading & unloading, Site clearance needed if any and demobilization after completing the work. (Site visit may be done prior to quote)
139Setting up boring rig at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location including shifting of machine from bore hole to bore hole.
140Boring with rotary power drilling equipment’s in all types of soil excluding hard rock or medium rock for strata including conducting S.P.T and recovery of samples at specific intervals.
141Upto 10m
142For next 10m upto a depth of 20m
143From 20m to 30m depth from GL
144From 30m to 40m depth from GL
145Boring through soft rock/ boulders/laterite (except hard rock). N value >50 using Tungsten carbide core drilling as per specification.
1460 to 10m
14710 to 20m
14820 to 30m
149Boring through hard rock / boulders using Tungsten carbide drill coring as per specification (minimum of 2.5m to 3m per borehole is required to assess the type of joints, rock etc.)
150A comprehensive report with Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab tests (report in triplicate) (three to five boreholes for a site)
151SOIL TEST
152Conducting Topographical survey using digital Total station & Submission of Drawings
153Mobilization including transportation of all necessary plant and equipment’s and materials of boring, field testing and sampling, including loading & unloading, Site clearance needed if any and demobilization after completing the work. (Site visit may be done prior to quote)
154Setting up boring rig at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location including shifting of machine from bore hole to bore hole.
155Boring with rotary power drilling equipment’s in all types of soil excluding hard rock or medium rock for strata including conducting S.P.T and recovery of samples at specific intervals.
156Upto 10m
157For next 10m upto a depth of 20m
158From 20m to 30m depth from GL
159From 30m to 40m depth from GL
160Boring through soft rock/ boulders/laterite (except hard rock). N value >50 using Tungsten carbide core drilling as per specification.
1610 to 10m
16210 to 20m
16320 to 30m
164Boring through hard rock / boulders using Tungsten carbide drill coring as per specification (minimum of 2.5m to 3m per borehole is required to assess the type of joints, rock etc.)
165A comprehensive report with Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab tests (report in triplicate) (three to five boreholes for a site)
166SOIL TEST
167Conducting Topographical survey using digital Total station & Submission of Drawings
168Mobilization including transportation of all necessary plant and equipment’s and materials of boring, field testing and sampling, including loading & unloading, Site clearance needed if any and demobilization after completing the work. (Site visit may be done prior to quote)
169Setting up boring rig at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location including shifting of machine from bore hole to bore hole.
170Boring with rotary power drilling equipment’s in all types of soil excluding hard rock or medium rock for strata including conducting S.P.T and recovery of samples at specific intervals.
171Upto 10m
172For next 10m upto a depth of 20m
173From 20m to 30m depth from GL
174From 30m to 40m depth from GL
175Boring through soft rock/ boulders/laterite (except hard rock). N value >50 using Tungsten carbide core drilling as per specification.
1760 to 10m
17710 to 20m
17820 to 30m
179Boring through hard rock / boulders using Tungsten carbide drill coring as per specification (minimum of 2.5m to 3m per borehole is required to assess the type of joints, rock etc.)
180A comprehensive report with Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab tests (report in triplicate) (three to five boreholes for a site)
181SOIL TEST
182Conducting Topographical survey using digital Total station & Submission of Drawings
183Mobilization including transportation of all necessary plant and equipment’s and materials of boring, field testing and sampling, including loading & unloading, Site clearance needed if any and demobilization after completing the work. (Site visit may be done prior to quote)
184Setting up boring rig at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location including shifting of machine from bore hole to bore hole.
185Boring with rotary power drilling equipment’s in all types of soil excluding hard rock or medium rock for strata including conducting S.P.T and recovery of samples at specific intervals.
186Upto 10m
187For next 10m upto a depth of 20m
188From 20m to 30m depth from GL
189From 30m to 40m depth from GL
190Boring through soft rock/ boulders/laterite (except hard rock). N value >50 using Tungsten carbide core drilling as per specification.
1910 to 10m
19210 to 20m
19320 to 30m
194Boring through hard rock / boulders using Tungsten carbide drill coring as per specification (minimum of 2.5m to 3m per borehole is required to assess the type of joints, rock etc.)
195A comprehensive report with Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab tests (report in triplicate) (three to five boreholes for a site)
196SOIL TEST
197Conducting Topographical survey using digital Total station & Submission of Drawings
198Mobilization including transportation of all necessary plant and equipment’s and materials of boring, field testing and sampling, including loading & unloading, Site clearance needed if any and demobilization after completing the work. (Site visit may be done prior to quote)
199Setting up boring rig at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location including shifting of machine from bore hole to bore hole.
200Boring with rotary power drilling equipment’s in all types of soil excluding hard rock or medium rock for strata including conducting S.P.T and recovery of samples at specific intervals.
201Upto 10m
202For next 10m upto a depth of 20m
203From 20m to 30m depth from GL
204From 30m to 40m depth from GL
205Boring through soft rock/ boulders/laterite (except hard rock). N value >50 using Tungsten carbide core drilling as per specification.
2060 to 10m
20710 to 20m
20820 to 30m
209Boring through hard rock / boulders using Tungsten carbide drill coring as per specification (minimum of 2.5m to 3m per borehole is required to assess the type of joints, rock etc.)
210A comprehensive report with Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab tests (report in triplicate) (three to five boreholes for a site) Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56302869
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 2.50 Lakhs
LAST DATE 13-07-2026
Authority
Authority Name Hll Lifecare Limited
Work Description Tender for Soil Investigation For Construction Of New Building For Sc Tachankunnu, Kozhikode District, Kerala
Basic Detail
Tender No HLL/CMO/HCD/SI/RFQ-1/26-27
Bidding Type Tender
Location
City Thiruvananthapuram
State Kerala
Key Dates
Publish Date 04 Jul 2026
Submission Date 13 Jul 2026
Open Date 14 Jul 2026
Finance
Tender Value 2.50 Lakhs
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
1b5d1fe7-e8da-43ab-9c4b-1a0de5469c68.html
BOQ_1445939.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 04, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 13, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 8 days
Jul 14, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 9 days

Tender Documents

Download All (ZIP) ↓
html

1b5d1fe7-e8da-43ab-9c4b-1a0de5469c68.html

xls

BOQ_1445939.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders