Tender For Engagement Of An Agency (Si) For Implementation Of Design, Engineering, Manufacture, Supply, Wiring, Installation, Testing & Commissioning Of Hardware & Software For Implementation And Support (Amc) Of The Substation-Consolidation, Data Ac
Tender Overview
Project Description
Tender for Engagement Of An Agency (Si) For Implementation Of Design, Engineering, Manufacture, Supply, Wiring, Installation, Testing & Commissioning Of Hardware & Software For Implementation And Support (Amc) Of The Substation-Consolidation, Data Acquisition And Control (Sdac) System And Its Integration With Other Systems And Associated Works At Mppkvvcl, Jabalpur, Under Rdss
BOQ
| Sl. No. | Item Description |
| 1 | Engagement of an Agency |
| 2 | Form: 1- Project Management Cost |
| 3 | Form: 2- ZSCC (for 4 Zonal Control Centres) |
| 4 | Form: 3-Server/Workstation Hardware & Software |
| 5 | FORM-4 Substation Hardware |
| 6 | FORM 5 Communcations |
| 7 | FORM 6 Control Center Equipments |
| 8 | Form 7 Other Equipments/Accessories |
| 9 | Form 8: FMS Tender Inviting Authority: THE CHIEF GENERAL MANAGER (STORE & PURCHASE) Name of Work: Engagement of an Agency (SI) for Implementation of Design, Engineering, manufacture, Supply, wiring, Installation, Testing & Commissioning of Hardware & Software for implementation and support (AMC) of the Substation-Consolidation, Data Acquisition and Control (SDAC) System and its Integration with other Systems and Associated Works at MPPKVVCL, Jabalpur, under RDSS Contract No: TS NO DISCOM/EZ/PUR/ 1638 (e Tender no 2025_PKVVC_462896_2) Name of the Bidder/ Bidding Firm / Company : 0.0 DATA RECOVERY LOCATION: JABALPUR, REWA, SAGAR & SHAHDOL Form: 1- Project Management Cost S.No Particulars Unit Cost without Tax Tax (%) Tax (Amt) Total cost including all Taxes & Duties |
| 10 | Installation, Testing and Commissioning Cost to Integrate Entire SDAC & IT (relevant to SDAC) Infrastructure |
| 11 | Integration with legacy applications & Data Migration Rs. |
| 12 | Training for the Employees (a) Operator’s Training (i) Operator for SDAC Control Centre for 5 days Rs. 0.0 0.0 (ii) Instructor for DTS for 10 days Rs. 0.0 0.0 (b) Maintenance Training (i) Computer Hardware & System Software for 10 days Rs. 0.0 0.0 (ii) Application Software SDAC for 10 days Rs. 0.0 0.0 (iii) RTU & FRTU for 5 days Rs. 0.0 0.0 (iv) Database & display development for 5 days Rs. 0.0 0.0 (v) Auxiliary Power Supply for 3 days Rs. 0.0 0.0 (vi) Communication System including NMS for 5 days Rs. 0.0 0.0 Total (3(a) (i) & (ii) + (b) (i) to (vi)) 0.0 Total (1+2+3) 0.0 *Project management cost include applicable tax /GST etc. Specific Exclusions · Land, Control Centre & various server rooms and other Civil & Structural Works including earthing. · Infrastructures such as Air conditioning system, · External & Internal electrification & Lighting, · Firefighting system · DG Set for meeting the SDAC Control Centre critical load requirements · Any mobile equipment such as Crane, truck, Jeep, filter M/c, etc. · Any T&P, testing equipments. etc. · Furniture for the computers required for SDAC system · Any contract for IT/ Outsourcing of services of revenue expenditure type where there is no capital addition. · Communication equipments such as mobile phone, telephone etc other than those specified in MTS -SDAC · DISCOM Manpower for managing SDAC system Tender Inviting Authority: THE CHIEF GENERAL MANAGER (STORE & PURCHASE) Name of Work: Engagement of an Agency (SI) for Implementation of Design, Engineering, manufacture, Supply, wiring, Installation, Testing & Commissioning of Hardware & Software for implementation and support (AMC) of the Substation-Consolidation, Data Acquisition and Control (SDAC) System and its Integration with other Systems and Associated Works at MPPKVVCL, Jabalpur, under RDSS Contract No: TS NO DISCOM/EZ/PUR/ 1638 (e Tender no 2025_PKVVC_462896_2) Name of the Bidder/ Bidding Firm / Company : 0.0 FORM 2 DC & ZSCC (for 4 Zonal Control Centres) S. No. Equipment Unit Qty. Per Unit Cost (without taxes ) (Rs.) Tax (%) Tax (Rs.) Total Cost (including taxes & duties)Cost (Rs.) FMS Cost/year (Rs.) A Server/ workstation Hardware |
| 13 | SCADA/OMS server |
| 14 | FEP server with interface switches |
| 15 | ISR server |
| 16 | NMS server |
| 17 | DTS server |
| 18 | Developmental server |
| 19 | Commnuication Server |
| 20 | Web/Directory server |
| 21 | SMS gaterway |
| 22 | Workstation with dual TFT Monitors (S/S monitoring) |
| 23 | Workstation with dual TFT Monitors (FPI monitoring) |
| 24 | Workstation with dual TFT Monitors (S/S monitoring) -RTDAS |
| 25 | Workstation with dual TFT Monitors (FPI monitoring)-RTDAS |
| 26 | Remote VDUs with one TFT Monitors |
| 27 | Developmental console with one TFT |
| 28 | DTS/Workstation Console with dual TFTs |
| 29 | VPS screen with min 2X3 matrix with each module minimum 60” diagonal Storage & Backup Devices |
| 30 | External RAID Mass storage device (for 24 months online backup) |
| 31 | SSD or LTO Based Backup System Switches |
| 32 | Layer II switch (SCADA/DMS LAN) |
| 33 | Layer II switch (Planning & Development system LAN) Routers |
| 34 | Router for interfacing IT system & SCADA/DMS DR Centre |
| 35 | Router at remote VDU/ WS Security system (DMZ) |
| 36 | Web server with load balancing |
| 37 | Mail server |
| 38 | Router |
| 39 | Firewall & network IDS/IPS |
| 40 | Layer II switch Other Active Devices |
| 41 | GPS Time synchronisation system |
| 42 | Time, day & date digital displays Printers |
| 43 | Color inkjet printer |
| 44 | B/W Laser printer |
| 45 | Wall mounted Display Unit 65 inch for Control / data Monitring Room at Rewa & Jabalpur (including wiring and installion) |
| 46 | Wall mounted Display Unit 98 inch for data Monitring |
| 47 | Any other items required to meet functional /Performance requirement as per UMTS Sub-Total A (Hardware) 0.0 0.0 B Software for Control Centre |
| 48 | SCADA software |
| 49 | ISR Software |
| 50 | DTS software |
| 51 | OMS Software |
| 52 | Developmental software |
| 53 | Network Management Software |
| 54 | WEB /Network security software (Incl in webserver) |
| 55 | RDBMS package |
| 56 | GIS Adaptor/Engine for importing data from GIS system under IT system |
| 57 | Any other software to meet functional /performance requirement of UMTS Sub-Total -B2 (Software) 0.0 0.0 C Mandatory spares Max 5% of A |
| 58 | Mandatory spares Sub -Total C spares 0.0 0.0 Grand Total = A+B+C 0.0 0.0 Tender Inviting Authority: THE CHIEF GENERAL MANAGER (STORE & PURCHASE) Name of Work: Engagement of an Agency (SI) for Implementation of Design, Engineering, manufacture, Supply, wiring, Installation, Testing & Commissioning of Hardware & Software for implementation and support (AMC) of the Substation-Consolidation, Data Acquisition and Control (SDAC) System and its Integration with other Systems and Associated Works at MPPKVVCL, Jabalpur, under RDSS Contract No: TS NO DISCOM/EZ/PUR/ 1638 (e Tender no 2025_PKVVC_462896_2) Name of the Bidder/ Bidding Firm / Company : 0.0 FORM 3 Server/Workstation Hardware & Software S.No. Equipment Unit Quantity Per Unit Cost (without tax ) TAX Tax amt Total Cost (including taxes ) FMS Cost / year Rs. % Rs. Rs. Rs. A Server/ workstation Hardware |
| 59 | DR server |
| 60 | Commnuication Server |
| 61 | Workstation with one TFT Monitors Storage & Backup Devices 0.0 |
| 62 | External storage device |
| 63 | SSD or LTO based backup system Switches 0.0 |
| 64 | Layer II switch (DR LAN) Routers |
| 65 | Router for interfacing at SCADA DMS centre. Printers 0.0 |
| 66 | Color inkjet printer |
| 67 | B/w Laser printer |
| 68 | Any other items required to meet functional /Performance requirement as per UMTS Sub-Total A Hardware 0.0 0.0 B Software for Control Centre |
| 69 | SCADA software |
| 70 | ISR Software |
| 71 | DTS software |
| 72 | OMS Software |
| 73 | Developmental software |
| 74 | Network Management Software |
| 75 | WEB /Network security software (Incl in webserver) |
| 76 | RDBMS package |
| 77 | GIS Adaptor/Engine for importing data from GIS system under IT system |
| 78 | Any other software to meet functional /performance requirement of UMTS Sub-Total B Software 0.0 0.0 0.0 C Mandatory spares Max 5% of A |
| 79 | Mandatory spares Sub -Total C spares 0.0 0.0 Grand Total A+B+C 0.0 0.0 Tender Inviting Authority: THE CHIEF GENERAL MANAGER (STORE & PURCHASE) Name of Work: Engagement of an Agency (SI) for Implementation of Design, Engineering, manufacture, Supply, wiring, Installation, Testing & Commissioning of Hardware & Software for implementation and support (AMC) of the Substation-Consolidation, Data Acquisition and Control (SDAC) System and its Integration with other Systems and Associated Works at MPPKVVCL, Jabalpur, under RDSS Contract No: TS NO DISCOM/EZ/PUR/ 1638 (e Tender no 2025_PKVVC_462896_2) Name of the Bidder/ Bidding Firm / Company : 0.0 FORM-4 Substation Hardware Substation Hardware S. No. Equipment Unit Quantity Per Unit Cost (without tax) Tax Tax amt Total Cost (including taxes) FMS Cost / year Rs. % Rs. Rs. Rs. A RTUs B &C -TYPE |
| 80 | RTU base equipment comprising panels, racks, sub-racks, Power Supply modules, CPU, interfacing equipment, required converters & all other required items/accessories including complete wiring for all modules /TRANSDUCER, RELAYS etc |
| 81 | Single TFT PC for remote monitring in field offices |
| 82 | Any other hardware to meet functional /performance requirement of MTS Sub - Total (Hardware) -A 0.0 0.0 0.0 B Software for LDMS |
| 83 | LDMS software Sub - Total (SOFTWARE) -B 0.0 0.0 0.0 C TEST EQUIPMENTS for RTU |
| 84 | RTU Database Configuration & Maintenance Software tool |
| 85 | Master Station cum RTU Simulator & Protocol analyser software tool |
| 86 | Laptop /PC for above software tools along with interfacing hardware including Hub Sub - Total (test equipment) -C 0.0 0.0 0.0 D MANDATORY SPARES FOR RTU |
| 87 | 5% of A Sub - Total (mandatory spare) -D 0.0 0.0 0.0 Grand total A+B+C+D 0.0 0.0 0.0 Tender Inviting Authority: THE CHIEF GENERAL MANAGER (STORE & PURCHASE) Name of Work: Engagement of an Agency (SI) for Implementation of Design, Engineering, manufacture, Supply, wiring, Installation, Testing & Commissioning of Hardware & Software for implementation and support (AMC) of the Substation-Consolidation, Data Acquisition and Control (SDAC) System and its Integration with other Systems and Associated Works at MPPKVVCL, Jabalpur, under RDSS Contract No: TS NO DISCOM/EZ/PUR/ 1638 (e Tender no 2025_PKVVC_462896_2) Name of the Bidder/ Bidding Firm / Company : 0.0 FORM 5 Communcations S. No. Equipment Unit Quantity Per Unit Cost (without taxes) Tax Tax amt Total Cost (including taxes) FMS Cost / year Rs. % Rs. Rs. Rs. A MPLS/GPRS |
| 88 | Charges for 100 MBPS Links for Data Centre and DR Centre for 5 years |
| 89 | Charges for 10 MBPS Links for Zonal Control Centres for 5 years |
| 90 | Charges for 2 MBPS Links for substation RTUs for 5 years |
| 91 | MPLS Router |
| 92 | GPRS charges connectivity for RTUs / GPRS for 5 years |
| 93 | 4G/5G modems (Dual Sim) |
| 94 | Any other hardware to meet functional /performance requirement of MTS Sub - Total A (1+2+3+4) 0.0 0.0 B GPRS |
| 95 | Charges of 4G/5G (Dual Sim) –for FPIs modems for 5 years |
| 96 | Any other hardware to meet functional /performance requirement of MTS Sub - Total B (1+2+3) 0.0 0.0 C Mandatory spares 5% of A & B LS 1.0 0.0 0.0 Grand Total (A+B+C) 0.0 0.0 Note: Modems has been proposed for Rural Sub-stations and Routers for Urban Sub-stations, however, modems are also proposed for Urban Sub-stations as well as an alternative, to MPLS. Tender Inviting Authority: THE CHIEF GENERAL MANAGER (STORE & PURCHASE) Name of Work: Engagement of an Agency (SI) for Implementation of Design, Engineering, manufacture, Supply, wiring, Installation, Testing & Commissioning of Hardware & Software for implementation and support (AMC) of the Substation-Consolidation, Data Acquisition and Control (SDAC) System and its Integration with other Systems and Associated Works at MPPKVVCL, Jabalpur, under RDSS Contract No: TS NO DISCOM/EZ/PUR/ 1638 (e Tender no 2025_PKVVC_462896_2) Name of the Bidder/ Bidding Firm / Company : 0.0 form 6:- Control Center Equipments S. No. Survey Unit Quantity Per Unit Cost (Without taxes) TAX TAX amt Total Cost (including taxes) FMS Cost / year Rs. % Rs. Rs. Rs. A Main Equipments - Control centre |
| 97 | UPS with suitable rating running in parallel redundant mode* Sub- Total A 0.0 0.0 B Main Equipments - DR Centre |
| 98 | UPS with suitable rating running in parallel redundant mode* Sub-Total B 0.0 0.0 C II For RTU / Data Concentrator / Communication Eqpts. |
| 99 | DC Power Supply (DCPS) system based on SMPS Sub-Total C 0.0 0.0 D Remote VDU location |
| 100 | UPS (2 kVA ) Sub-Total D 0.0 0.0 E Mandatory Spares for UPS |
| 101 | 5% of above H1TO H5 Sub-Total E 0.0 0.0 Grand Total (A+B+C+D+E) 0.0 0.0 Tender Inviting Authority: THE CHIEF GENERAL MANAGER (STORE & PURCHASE) Name of Work: Engagement of an Agency (SI) for Implementation of Design, Engineering, manufacture, Supply, wiring, Installation, Testing & Commissioning of Hardware & Software for implementation and support (AMC) of the Substation-Consolidation, Data Acquisition and Control (SDAC) System and its Integration with other Systems and Associated Works at MPPKVVCL, Jabalpur, under RDSS Contract No: TS NO DISCOM/EZ/PUR/ 1638 (e Tender no 2025_PKVVC_462896_2) Name of the Bidder/ Bidding Firm / Company : 0.0 Form 7 Other Equipments/Accessories Other Equipments/Accessories S. No. Survey Unit Quantity Per Unit Cost (Without taxes) TAX Tax amt Total Cost (including taxes) FMS Cost / year Rs. % Rs. Rs. Rs. A FPI |
| 102 | FPI Commnicable Sub-Total A 0.0 0.0 B Relays for S/S |
| 103 | Numeric Relay (IEC-61850 Compliant)- for CHQs |
| 104 | Numeric Relay (Communicable/SCADA Compliant)- for Non-CHQs Sub-Total B 0.0 0.0 C Other equipments |
| 105 | Earthing of S/s |
| 106 | Misc. (Clamp, connector, mounting, lugs, glands etc) |
| 107 | Any other hardware to meet functional/performance requirement of MTS |
| 108 | 11 kV PT (considering installation on 2320-150 = 2170 Nos Power Transformer) |
| 109 | 33 kV PT (considering installation on 1250-150= 1100 Nos Sub-Station) |
| 110 | 11 kV 200-100/5 Amp CT (against replacement of defective units) |
| 111 | 11 kV 300-150/5 Amp CT (against replacement of defective units) |
| 112 | 11 kV 600-300/5 Amp CT (against replacement of defective units) |
| 113 | 33 kV 200-100/5 Amp CT (against replacement of defective units) |
| 114 | 33 kV 300-150/5 Amp CT (against replacement of defective units) |
| 115 | 33 kV 400-200/5 Amp CT (against replacement of defective units) |
| 116 | Copper Control Cable 4 Core. 2.5 Sq.mm. (Unarmoured- considering 60 mtr cable per PT set) |
| 117 | Copper Control Cable 2 Core. 2.5 Sq.mm. (Unarmoured- considering 40 mtr cable per PT set) |
| 118 | Marshelling box with 10 no. connectors |
| 119 | TTB (Test Terminal Block) 10 Channel |
| 120 | Control , flexible wire and Ethernet cable per substation |
| 121 | AC Distribution Board (24 AC MCB of suitable rating) |
| 122 | DC Distribution Board (30 DC MCB of suitable rating) |
| 123 | Miscellaneous mandatory Transducers, Relays, etc. |
| 124 | Lead Acid 30 Volt (15 Cells of 2.1 Volt)100 AH Battery with suitable charger Sub-Total C 0.0 0.0 D Mandatory Spares |
| 125 | 5% of above A to C Sub-Total D 0.0 0.0 Grand Total (A+B+C+D) 0.0 0.0 Tender Inviting Authority: THE CHIEF GENERAL MANAGER (STORE & PURCHASE) Name of Work: Engagement of an Agency (SI) for Implementation of Design, Engineering, manufacture, Supply, wiring, Installation, Testing & Commissioning of Hardware & Software for implementation and support (AMC) of the Substation-Consolidation, Data Acquisition and Control (SDAC) System and its Integration with other Systems and Associated Works at MPPKVVCL, Jabalpur, under RDSS Contract No: TS NO DISCOM/EZ/PUR/ 1638 (e Tender no 2025_PKVVC_462896_2) Name of the Bidder/ Bidding Firm / Company : 0.0 Form 8: FMS S. No. Description Duration Per YEAR FOR 2 YEARS FOR 5YEARS cost (Addl 3yrs) |
| 126 | FMS charges for SDAC system (maintaining overall system availability as per TS) |
| 127 | FMS charges for SDAC system (maintaining availability individual hardware & software application as per TS) Total FMS charges Five Year 0.0 · The necessary spares required for maintenance of the system during FMS shall be provided by the contractor. However, the consumables shall be provided by the owner. · FMS shall include all the supplied hardware & software under the project · Cost of overall system availability/year shall not be less than 40 % and more than 60% of total FMS charges/year · The cost of shall not be less than 20 % of total contract value. The cost per year for all 5 year shall be same Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 16 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 17 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender