Tender For Construction Of Reinforced Cement Concrete Drain Starting From North Western Corner Of P.G. Hostel No: 2 To South Western Corner Of Gents Hostel No. 4 Near Type -Iii & Iv Qtrs. Sothern Gate, Rims, Imphal (Sh:- 130 Rm Long & 14.6Rm X1.2M Sp
Tender Overview
Project Description
Tender for Construction Of Reinforced Cement Concrete Drain Starting From North Western Corner Of P.G. Hostel No: 2 To South Western Corner Of Gents Hostel No. 4 Near Type -Iii & Iv Qtrs. Sothern Gate, Rims, Imphal (Sh:- 130 Rm Long & 14.6Rm X1.2M Span Reinforced Cement Concrete Culvert)
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m |
| 2 | All kinds of soil |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. |
| 4 | Ordinary or hard rock. |
| 5 | Banking excavated earth in layers not exceeding 20 cm. in depth, breaking clods,watering, rolling each layer with ½ tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m. |
| 6 | All kinds of soil |
| 7 | Dry boulder pitching in floor. |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering --All work upto plinth level: |
| 9 | 1:4: 8 ( 1 cement : 4 coarse sand : 8 graded stone aggrt. 40mm nominal size). |
| 10 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work upto plinth level : |
| 11 | 1:1.5:3 (1 cement: 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 12 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. above plinth level upto floor five level excluding cost of centering,shuttering, finishing and reinforcement : |
| 13 | 1:1.5:3 (1 cement: 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 14 | Reinforced cement concrete work in beams, suspended floors,roofs having slope upto 15° landings, balconies, shelves, chajjas,lintels, bands, plain window sills,staircases and spiral stair cases above plinth level upto floor five level, excluding the cost of centering,shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). |
| 15 | Reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete up to plinthlevel. |
| 16 | Thermo-Mechanically Treated bars |
| 17 | Form work |
| 18 | Foundations, footings, bases of columns, etc. for mass concrete. |
| 19 | Walls (any thickness) including attached pilasters, buttresses, |
| 20 | plinth and string courses etc. |
| 21 | Lintels, beams, plinth beams, girders, bressumers and cantilevers. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender