Tender For Tender For providing And Erection Of 11/0.4 Kv 100 Kva Substation Underneath And 3-Phase Lt Extension To Improve Voltage And Reduce Lengthy Pvc Services At Village Nangal Jariyalan (Mohalla Sai Colony) In Electrical Section Nangal Jariyala
Tender Overview
Project Description
Tender for Tender For providing And Erection Of 11/0.4 Kv 100 Kva Substation Underneath And 3-Phase Lt Extension To Improve Voltage And Reduce Lengthy Pvc Services At Village Nangal Jariyalan (Mohalla Sai Colony) In Electrical Section Nangal Jariyalan Under Esd, Hpsebl, Daulatpur T.S. No. 124/2025-26 Ch. To. :- Release Of Gsc (Op) Circle Una (H.P.) (Bid No. Ged-34/2026-27)
BOQ
| Sl. No. | Item Description |
| 1 | Erection Part of 11/0.4 KV, 100 KVA Transformer |
| 2 | Erection of S/Stn. Str.:-Digging of Pit for S/T Pole and earthing, drilling of holes in X-arm, preparation of plate form str. Member CI, Alluminium Paint AI i.e X-arml, Knee bracing set, erection of D-pole,errection of plate form, ercetion of x-Arm, drop out, fuse unit, linghting arrestor, MCCB Switch of LT Box, Energy Meter, Erection of T/F, and earthing conn. to T/F G.O Switch lightning etc. erection of Stay Set, Erection of Jumper, Pipe earthing 3 Nos., Erection of LT cable, brabed wire and painting, 3 Nos. earthing to S/Stn. by prov. 50Kg Salt charcole in each earthing i/c construction of trench for earthing as per REC Board Standard complete in all respect. ( 100 KVA Transformer) |
| 3 | Prov. & erection of Chain link fencing angle iron, Gate etc. for transformer fencing. |
| 4 | Supply Part of 11/0.4 KV, 100 KVA Transformer |
| 5 | Prov. Distribution Transformer (Ordinary), 11/0.4 kV, 100 KVA (1 No. Supply by HPSEBL) |
| 6 | Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) (2 No. Supply by HPSEBL) |
| 7 | Prov. RCC Muffs with concerete filling |
| 8 | Prov. X-Arm: [Channel Iron (100x50x5 mm), Length : 2800 mm X 2 Nos] for incomer line |
| 9 | Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 1 Nos for LA. |
| 10 | Prov. X-Arm: [Channel Iron (75x40x4.8 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 11 | Transformer Belting & Knee Bracing |
| 12 | Prov. X-Arm: [Channel Iron (100x50x5 mm), Length : 2800 mm X 2 Nos] for Transformer Bed |
| 13 | Prov. X-Arm [Channel Iron (100x50x6 mm), Length : (460 mm) x 2 Nos for supporting Main Channel of Transformer] |
| 14 | Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos |
| 15 | Prov. MS Angle Iron (35X35x6 mm), Length : 460 mm x 2 Nos |
| 16 | Prov. MS Angle Iron (50X50x6 mm), Length: 950 mm x(2 Nos for Bed Knee Bracing) |
| 17 | Transformer L.T Distribution Box and GO Switch fixing Assembly |
| 18 | Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos |
| 19 | Prov. MS Angle Iron (50X50x6 mm), Length : 450 mm x 1 No. |
| 20 | Prov. Switch Handle Supporting: [Channel Iron (75x40x4.8 mm), Length : 460 mm |
| 21 | Prov. GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type (1 Set Supply by HPSEBL) |
| 22 | Prov. D.O Fuse Unit |
| 23 | Prov. Surge Arrester, 9 kV Station Class (Porcelain Type) (3 No. Supply by HPSEBL) |
| 24 | Prov. Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) (3 Set Supply by HPSEBL) |
| 25 | Prov. Stay set complete |
| 26 | Prov. Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set) |
| 27 | Prov. Pipe Earthing Set |
| 28 | Prov. 6 SWG GI wire For Earthing |
| 29 | Prov. Panel (Distribution Box LT 100 kVA DTR MS Sheet of 1.6 mm ( 900x800x200 mm ) cubide Box complete with stand etc and Al Busbar (25x6mm)inside .painted /powder coated after primar coating MCCB 160 amp 3P 35kA , ICS =100 % ICU, Kit-Kit 200 Amp 100 KVA DTR |
| 30 | Prov. Half Clamp (M.S. Flat 50X6 mm) |
| 31 | Prov. Full Clamp (M.S. Flat 50X6 mm) |
| 32 | Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 33 | Prov. Aluminium Thimble (16 Set Supply by HPSEBL) |
| 34 | Prov. Copper Thimble (4 Set Supply by HPSEBL) |
| 35 | Prov. Danger Plate (1 No Supply by HPSEBL) |
| 36 | Prov. Barbed Wire |
| 37 | Prov. LT Cable 3.5 X 120 mm² 1.1 kV XLPE Cable Unarmoured (30 Mtr. Supply by HPSEBL) |
| 38 | Prov. Aluminium Paint. |
| 39 | Prov. Red Oxide |
| 40 | Erection Part for 3-Phase LT line |
| 41 | Erection of LT line.Digging of pit of stay, Erection of Steel Pole 8 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect. |
| 42 | Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect. |
| 43 | Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect. |
| 44 | Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.15 (55mm2) Conductor of new 3-Phase LT line complete in all respect. |
| 45 | G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect. |
| 46 | Supply Part for new 3-Phase LT line |
| 47 | Prov. AAAC 7/3.15 (55mm²) {Includes 1 conductor lengths for 3Φ {Neutral conductor including 1% (Sag, Jumpering and wastage} (0.888 Kms Supply by HPSEBL) |
| 48 | Prov. ST Pole 8 mtr.long alongwith baseplate complete in all respect. (4 No. Supply by HPSEBL) |
| 49 | Prov. RCC Muffs with concrete filling complete in all respect. |
| 50 | Prov. Angle iron (75x75x6) Length 1.5 mtr. + 0.2 mtr. |
| 51 | Prov. Shackle Insulator (16 Kn) |
| 52 | Prov. D-Iron (U-Clamps) |
| 53 | Prov. Earth Knob |
| 54 | Prov. LT Stay Set |
| 55 | Prov. Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set |
| 56 | Prov. Full Clamps [ 2 No for A.I + 1 No for Stay Set] |
| 57 | Prov. Earthing Set complete |
| 58 | Prov. Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m |
| 59 | Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 60 | Prov. Spiral PVC Spacer |
| 61 | Prov. Aluminium Paint |
| 62 | Prov. Red Oxide |
| 63 | Loading of DTR/LT lines materials on truck at Divisional Store and same material unloading at road head of site of work and Manual Carriage Of DTR/LT line allied Material For Average Distance From Road To Site Of Work .(If required as per site). Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender