Power Government Departments Closing in 13 days TDR #56293500

Bids Are invited for Shifting Of 11 Kv And Lt Lines And Other Electrical Equipment

Issued by Government Departments · Etah, Uttar Pradesh
Tender Value
19 Lakhs
Estimated cost
Bid Submission
18 Jul 2026
13 days left
EMD
19000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Etah → Uttar Pradesh
EMD Exemption
Not Available
Quantity
12710

Project Description

Bids Are invited for Shifting Of 11 Kv And Lt Lines And Other Electrical Equipment Supply Of 11 Kv Line Material - Stone Pad 300X300x75 Mm , Supply Of 11 Kv Line Material - Barbed Wire , Supply Of 11 Kv Line Material - Danger Board With Cl , Supply Of 11 Kv Line Material - Ms T Off Channel With Cl , Supply Of 11 Kv Line Material - Top Channel 100X50x2240 Mm , Supply Of 11 Kv Line Material - Ms Dropper Channel , Supply Of 11 Kv Line Material - F Cl , Supply Of 11 Kv Line Material - Pg Cl , Supply Of 11 Kv Line Material - Holding Cl , Supply Of 11 Kv Line Material - Ms Angle 75X75x6x2028 Mm (With Cl And Nut And Bolts Tf Base Angle) , Supply Of 11 Kv Line Material - Guarding Angle With Cl , Supply Of 11 Kv Line Material - Nut And Bolts With Washer , Supply Of 11 Kv Line Material - Cl With Nut And Bolts , Supply Of 11 Kv Line Material - Ms Cross Bracing Angle , Supply Of 11 Kv Line Material - Red Oxide Paints , Supply Of 11 Kv Line Material - Allunimum Paints , Supply Of 11 Kv Line Material - Number Plate , Supply Of 11 Kv Line Material - E Bracket , Supply Of 11 Kv Line Material - Gi Pipe 6 Inch Dia , Supply Of 11 Kv Line Material - Hdpe Pipe 120 Mm , Supply Of 11 Kv Line Material - Allunimum Lug , Supply Of Lt Line Material - Stone Pad 300X300x75 Mm , Supply Of Lt Line Material - Gi Pipe 6 Inch Dia , Supply Of Lt Line Material - Hdpe Pipe 120 Mm , Supply Of Lt Line Material - Distribution Box Cl , Supply Of Lt Line Material - Cl With Nut And Bolts , Supply Of Lt Line Material - Pricing Connector A&B Type , Supply Of Lt Line Material - Suspension Cl , Supply Of Lt Line Material - I Hook , Supply Of Lt Line Material - Dead End Cl , Safe Carriage Of 11 Kv Line Material - Safe Carriage Of Line Material From Store Center Etah / Nearest 33/11 Kv S/S To Direct Pit Site In Distance Range 0 To 60 Km. Including Loading And Unloading At Both Side. , Safe Carriage Of 11 M Stp - Safe Carriage Of 11 Mtr Long St Pole From Store Center Etah / Nearest 33/11 Kv S/S To Direct Pit Site In Distance Range 0 To 60 Km. Including Loading And Unloading At Both Side. , Safe Carriage Of 11 Kv Xlpe Cable - Safe Carriage Of 11Kv Xlpe Cable 3X120 Sq. Mm From Store Center Etah / Nearest 33/11 Kv S/S To Direct Pit Site In Distance Range 0 To 60 Km. Including Loading And Unloading At Both Side. , Safe Carriage Of 11 Kv Xlpe Cable - Safe Carriage Of 11Kv Xlpe Cable 3X70 Sq. Mm From Store Center Etah / Nearest 33/11 Kv S/S To Direct Pit Site In Distance Range 0 To 60 Km. Including Loading And Unloading At Both Side. , Erection Of 11 M Stp Single Support - Erection Of 11 Mtr St Pole As Single Support Including Fixing Of All Ht/Lt Accessories Etc. Complet, Pole Should Be Grouted Properly As Per Dvvnl/Respo Norms. , Erection Of 11 M Stp Section Pole - Erection Of 11 Mtr Long St Pole As Section Pole Including Fixing Of All Ht/Lt Accessories Etc. Complete. Pole Should Be Grouted Properly As Per Dvvnl/Respo Norms. , Erection Of 11 M Stp Double Pole - Erection Of 11 Mtr Long St Pole As Double Pole Including Fixing Of All Ht/Lt Accessories Etc. Complete With Tpmo, Pole Should Be Grouted Properly As Per Dvvnl/Respo Norms. , Dismentalling Old Weseal Conductor - Dismentalling Of Old Acsr Weseal Conductor Stacking Of Proper Place. , Laying Acsr Weseal Conductor - Laying, Sagging Stringing, Binding, Jumpering & Fixing Of All Accessories Etc Of Acsr Weseal Conductor On The Newly/Old Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Required For Proper Completion Of Work. , Dismentalling Old Acsr Rabbit Conductor - Dismentalling Of Old Acsr Rabbit Conductor Stacking Of Proper Place. , Laying Acsr Rabbit Conductor - Laying, Sagging Stringing, Binding, Jumpering & Fixing Of All Accessories Etc Of Acsr Rabbit Conductor On The Newly/Old Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Required For Proper Completion Of Work. , Laying Of 11 Kv Xlpe Cable - Laying Of 11 Kv Xlpe Cable 3X120 Sq. Mm. On The Newly/Old Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Required For Proper Completion Of Work. , Laying Of 11 Kv Xlpe Cable - Laying Of 11 Kv Xlpe Cable 3X70 Sq. Mm. On The Newly/Old Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Required For Proper Completion Of Work. , Fixing Of Hdpe Pipe With Xlpe Cable - Fixing Of Hdpe Pipe 120 Mm Dia For U/G Laying Of 11 Kv Xlpe Cable 3X120 Sq Mm With Laid By Hdd Method Including Cable Laying , Fixing Of Hdpe Pipe With Xlpe Cable - Fixing Of Hdpe Pipe 120 Mm Dia For U/G Laying Of 11 Kv Xlpe Cable 3X70 Sq Mm With Laid By Hdd Method Including Cable Laying , Fixing Of Cable Jointiong Kit - Fixing Of 3X120 Xlpe Cable Jointing Kit Outdoor , Fixing Of Cable Jointiong Kit - Fixing Of 3X70 Xlpe Cable Jointing Kit Outdoor , Fixing Of Gi Pipe - Fixing Of Gi Pipe 6 Inch Dia , Erection Of Stone Pad - Fixing Of Stone Pad 300X300x75 Mm , Erection Of Barbed Wire - Fixing Of Barbed Wire , Erection Of F Cl - Fixing Of F Cl , Erection Of Danger Board - Fixing Of Danger Board With Cl , Erection Of Pg Cl - Fixing Of Pg Cl , Erection Of Holding Cl - Fixing Of Holding Cl , Laying Of Gi Wire 8 Swg - Laying Of Gi Wire 6 Swg All Complete Assoceries , Laying Of Gi Wire 10 Swg - Laying Of Gi Wire 8 Swg All Complete Assoceries , Erection Of Earthing Complete , Erection Of Stay Set Complete - Fixing Of Stay Set Complete Including The Work Of Nozzling Etc. , Safe Carriage Of Dismantilled Material - Safe Carriage Of Dismantilled Material (Cross Arm, Cl , F Cl , Top Channel/Weseal Conductor & Other Accessories Etc.) From The Pit Side To The Store Distance 0 To 60 Km. With Loading & Unloading At Both Ends And Proper Stacking In Store. , Safe Carriage Of Lt Line Material - Safe Carriage Of Line Material From Store Center Etah / Nearest 33/11 Kv S/S To Direct Pit Site In Distance Range 0 To 60 Km. Including Loading And Unloading At Both Side. , Safe Carriage Of 11 M Stp - Safe Carriage Of 11 Mtr Long St Pole From Store Center Etah / Nearest 33/11 Kv S/S To Direct Pit Site In Distance Range 0 To 60 Km. Including Loading And Unloading At Both Side. , Safe Carriage Of Lt Xlpe Cable - Safe Carriage Of Lt Xlpe Cable 3X120 Sq. Mm From Store Center Etah / Nearest 33/11 Kv S/S To Direct Pit Site In Distance Range 0 To 60 Km. Including Loading And Unloading At Both Side. , Safe Carriage Of Lt Ab Cable - Safe Carriage Of Lt Ab Cable 3X95 Sq. Mm From Store Center Etah / Nearest 33/11 Kv S/S To Direct Pit Site In Distance Range 0 To 60 Km. Including Loading And Unloading At Both Side. , Safe Carriage Of Lt Ab Cable - Safe Carriage Of Lt Ab Cable 1X16+1X25 Sq. Mm From Store Center Etah / Nearest 33/11 Kv S/S To Direct Pit Site In Distance Range 0 To 60 Km. Including Loading And Unloading At Both Side. , Erection Of Lt Xlpe Cable - Laying, Sagging Stringing, Binding, Jumpering & Fixing Of All Accessories Etc Of Lt Xlpe Cable 3X120 Sq. Mm On The Newly/Old Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Required For Proper Completion Of Work. , Dismentalling Of Lt Ab Cable - Dismentalling Of Lt Ab Cable 3X50+1X35+1X16 Sq. Mm Stacking Of Proper Place. , Erection Of Lt Ab Cable - Laying, Sagging Stringing, Binding, Jumpering & Fixing Of All Accessories Etc Of Lt Ab Cable 3X95 Sq. Mm On The Newly/Old Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Required For Proper Completion Of Work. , Erection Of Lt Ab Cable - Laying, Sagging Stringing, Binding, Jumpering & Fixing Of All Accessories Etc Of Lt Ab Cable 1X16+1X25 Sq. Mm On The Newly/Old Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Required For Proper Completion Of Work. , Fixing Of Hdpe Pipe With Xlpe Cable - Fixing Of Hdpe Pipe 120 Mm Dia For U/G Laying Of 11 Kv Xlpe Cable 3X120 Sq Mm With Laid By Hdd Method Including Cable Laying , Fixing Of Distribution Box With Cl - Fixing Of 3 Ph Distribution With Box Cl , Fixing Of Gi Pipe - Fixing Of Gi Pipe 6 Inch Dia , Erection Of Earthing Complete , Erection Of Stay Set Complete - Fixing Of Stay Set Complete Including The Work Of Nozzling Etc. , Safe Carriage Of Dismantilled Lt Ab Cable - Safe Carriage Of Dismantilled Material (Cable/Cl And Other Assoceries) From The Pit Side To The Store Distance 0 To 60 Km. With Loading & Unloading At Both Ends And Proper Stacking In Store. Total Quantity : 12710

BOQ

Sl. No. Item TitleItem Description
1Supply of 11 KV Line MaterialStone Pad 300x300x75 mm
2Supply of 11 KV Line MaterialBarbed Wire
3Supply of 11 KV Line MaterialDanger Board with Clamp
4Supply of 11 KV Line MaterialMS T off Channel with Clamp
5Supply of 11 KV Line MaterialTop Channel 100x50x2240 mm
6Supply of 11 KV Line MaterialMS Dropper Channel
7Supply of 11 KV Line MaterialF Clamp
8Supply of 11 KV Line MaterialPG Clamp
9Supply of 11 KV Line MaterialHolding Clamp
10Supply of 11 KV Line MaterialMS Angle 75x75x6x2028 mm (with clamp and nut and bolts TF Base angle)
11Supply of 11 KV Line MaterialGuarding Angle with Clamp
12Supply of 11 KV Line MaterialNut and Bolts with Washer
13Supply of 11 KV Line MaterialClamp with Nut and Bolts
14Supply of 11 KV Line MaterialMS Cross Bracing Angle
15Supply of 11 KV Line MaterialRed Oxide Paints
16Supply of 11 KV Line MaterialAllunimum Paints
17Supply of 11 KV Line MaterialNumber Plate
18Supply of 11 KV Line MaterialE Bracket
19Supply of 11 KV Line MaterialGI Pipe 6 inch Dia
20Supply of 11 KV Line MaterialHDPE Pipe 120 mm
21Supply of 11 KV Line MaterialAllunimum Lug
22Supply of LT Line MaterialStone Pad 300x300x75 mm
23Supply of LT Line MaterialGI Pipe 6 inch Dia
24Supply of LT Line MaterialHDPE Pipe 120 mm
25Supply of LT Line MaterialDistribution Box Clamp
26Supply of LT Line MaterialClamp with Nut and Bolts
27Supply of LT Line MaterialPricing Connector A&B Type
28Supply of LT Line MaterialSuspension Clamp
29Supply of LT Line MaterialI Hook
30Supply of LT Line MaterialDead End Clamp
31Safe Carriage of 11 KV Line MaterialSafe carriage of line material from store center Etah / nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading and unloading at both side.
32Safe Carriage of 11 M STPSafe carriage of 11 Mtr Long ST pole from store center Etah / nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading and unloading at both side.
33Safe Carriage of 11 KV XLPE CableSafe carriage of 11KV XLPE Cable 3x120 sq. mm from store center Etah / nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading and unloading at both side.
34Safe Carriage of 11 KV XLPE CableSafe carriage of 11KV XLPE Cable 3x70 sq. mm from store center Etah / nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading and unloading at both side.
35Erection of 11 M STP Single SupportErection of 11 mtr ST Pole as single support including fixing of all HT/LT accessories etc. complet, pole should be grouted properly as per DVVNL/RESPO norms.
36Erection of 11 M STP Section PoleErection of 11 mtr Long ST Pole as Section Pole including fixing of all HT/LT accessories etc. complete. Pole should be grouted properly as per DVVNL/RESPO norms.
37Erection of 11 M STP Double PoleErection of 11 mtr Long ST Pole as Double Pole including fixing of all HT/LT accessories etc. complete with TPMO, pole should be grouted properly as per DVVNL/RESPO norms.
38Dismentalling old Weseal ConductorDismentalling of old ACSR Weseal Conductor stacking of proper place.
39Laying ACSR Weseal ConductorLaying, sagging stringing, binding, jumpering & fixing of all accessories etc of ACSR Weseal Conductor on the newly/old erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work.
40Dismentalling old ACSR Rabbit ConductorDismentalling of old ACSR Rabbit Conductor stacking of proper place.
41Laying ACSR Rabbit ConductorLaying, sagging stringing, binding, jumpering & fixing of all accessories etc of ACSR Rabbit Conductor on the newly/old erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work.
42Laying of 11 KV XLPE CableLaying of 11 KV XLPE Cable 3x120 sq. mm. on the newly/old erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work.
43Laying of 11 KV XLPE CableLaying of 11 KV XLPE Cable 3x70 sq. mm. on the newly/old erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work.
44Fixing of HDPE Pipe with XLPE CableFixing of HDPE Pipe 120 mm Dia for U/G laying of 11 KV XLPE Cable 3x120 sq mm with laid by HDD method including cable laying
45Fixing of HDPE Pipe with XLPE CableFixing of HDPE Pipe 120 mm Dia for U/G laying of 11 KV XLPE Cable 3x70 sq mm with laid by HDD method including cable laying
46Fixing of Cable Jointiong KitFixing of 3x120 XLPE Cable Jointing Kit outdoor
47Fixing of Cable Jointiong KitFixing of 3x70 XLPE Cable Jointing Kit outdoor
48Fixing of GI PipeFixing of GI Pipe 6 inch Dia
49Erection of Stone PadFixing of Stone Pad 300x300x75 mm
50Erection of Barbed WireFixing of Barbed Wire
51Erection of F ClampFixing of F Clamp
52Erection of Danger BoardFixing of Danger Board with Clamp
53Erection of PG ClampFixing of PG Clamp
54Erection of Holding ClampFixing of Holding Clamp
55Laying of GI Wire 8 SWGLaying of GI Wire 6 SWG all complete assoceries
56Laying of GI Wire 10 SWGLaying of GI Wire 8 SWG all complete assoceries
57Erection of Earthing CompleteErection of Earthing Complete
58Erection of Stay Set CompleteFixing of Stay set complete including the work of nozzling etc.
59Safe Carriage of Dismantilled MaterialSafe carriage of dismantilled material (Cross Arm, Clamp, F Clamp, Top Channel/Weseal Conductor & other accessories etc.) from the pit side to the store distance 0 to 60 Km. with loading & unloading at both ends and proper stacking in store.
60Safe Carriage of LT Line MaterialSafe carriage of line material from store center Etah / nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading and unloading at both side.
61Safe Carriage of 11 M STPSafe carriage of 11 Mtr Long ST pole from store center Etah / nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading and unloading at both side.
62Safe Carriage of LT XLPE CableSafe carriage of LT XLPE cable 3x120 sq. mm from store center Etah / nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading and unloading at both side.
63Safe Carriage of LT AB CableSafe carriage of LT AB cable 3x95 sq. mm from store center Etah / nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading and unloading at both side.
64Safe Carriage of LT AB CableSafe carriage of LT AB cable 1x16+1x25 sq. mm from store center Etah / nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading and unloading at both side.
65Erection of LT XLPE CableLaying, sagging stringing, binding, jumpering & fixing of all accessories etc of LT XLPE cable 3x120 sq. mm on the newly/old erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work.
66Dismentalling of LT AB CableDismentalling of LT AB cable 3x50+1x35+1x16 sq. mm stacking of proper place.
67Erection of LT AB CableLaying, sagging stringing, binding, jumpering & fixing of all accessories etc of LT AB cable 3x95 sq. mm on the newly/old erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work.
68Erection of LT AB CableLaying, sagging stringing, binding, jumpering & fixing of all accessories etc of LT AB cable 1x16+1x25 sq. mm on the newly/old erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work.
69Fixing of HDPE Pipe with XLPE CableFixing of HDPE Pipe 120 mm Dia for U/G laying of 11 KV XLPE Cable 3x120 sq mm with laid by HDD method including cable laying
70Fixing of Distribution Box with ClampFixing of 3 Ph Distribution with Box Clamp
71Fixing of GI PipeFixing of GI Pipe 6 inch Dia
72Erection of Earthing CompleteErection of Earthing Complete
73Erection of Stay Set CompleteFixing of Stay set complete including the work of nozzling etc.
74Safe carriage of dismantilled LT AB CableSafe carriage of dismantilled material (Cable/Clamp and other assoceries) from the pit side to the store distance 0 to 60 Km. with loading & unloading at both ends and proper stacking in store.

AI Tender Summary

OUR REF NO 56293500
AUTHORITY Government Departments
TENDER VALUE 19 Lakhs
LAST DATE 18-07-2026
Authority
Authority Name Uttar Pradesh Power Corporation Limited
Work Description Bids Are invited for Shifting Of 11 Kv And Lt Lines And Other Electrical Equipment Supply Of 11 Kv Line Material - Stone Pad 300X300x75 Mm , Supply Of 11 Kv Line Material - Barbed Wire , Supply Of 11 Kv Line Material - Danger Board With Cl , Supply Of 11 Kv Line Material - Ms T Off Channel With Cl , Supply Of 11 Kv Line Material - Top Channel 100X50x2240 Mm , Supply Of 11 Kv Line Material - Ms Dropper Channel , Supply Of 11 Kv Line Material - F Cl , Supply Of 11 Kv Line Material - Pg Cl , Supply Of 11 Kv Line Material - Holding Cl , Supply Of 11 Kv Line Material - Ms Angle 75X75x6x2028 Mm (With Cl And Nut And Bolts Tf Base Angle) , Supply Of 11 Kv Line Material - Guarding Angle With Cl , Supply Of 11 Kv Line Material - Nut And Bolts With Washer , Supply Of 11 Kv Line Material - Cl With Nut And Bolts , Supply Of 11 Kv Line Material - Ms Cross Bracing Angle , Supply Of 11 Kv Line Material - Red Oxide Paints , Supply Of 11 Kv Line Material - Allunimum Paints , Supply Of 11 Kv Line Material - Number Plate , Supply Of 11 Kv Line Material - E Bracket , Supply Of 11 Kv Line Material - Gi Pipe 6 Inch Dia , Supply Of 11 Kv Line Material - Hdpe Pipe 120 Mm , Supply Of 11 Kv Line Material - Allunimum Lug , Supply Of Lt Line Material - Stone Pad 300X300x75 Mm , Supply Of Lt Line Material - Gi Pipe 6 Inch Dia , Supply Of Lt Line Material - Hdpe Pipe 120 Mm , Supply Of Lt Line Material - Distribution Box Cl , Supply Of Lt Line Material - Cl With Nut And Bolts , Supply Of Lt Line Material - Pricing Connector A&B Type , Supply Of Lt Line Material - Suspension Cl , Supply Of Lt Line Material - I Hook , Supply Of Lt Line Material - Dead End Cl , Safe Carriage Of 11 Kv Line Material - Safe Carriage Of Line Material From Store Center Etah / Nearest 33/11 Kv S/S To Direct Pit Site In Distance Range 0 To 60 Km. Including Loading And Unloading At Both Side. , Safe Carriage Of 11 M Stp - Safe Carriage Of 11 Mtr Long St Pole From Store Center Etah / Nearest 33/11 Kv S/S To Direct Pit Site In Distance Range 0 To 60 Km. Including Loading And Unloading At Both Side. , Safe Carriage Of 11 Kv Xlpe Cable - Safe Carriage Of 11Kv Xlpe Cable 3X120 Sq. Mm From Store Center Etah / Nearest 33/11 Kv S/S To Direct Pit Site In Distance Range 0 To 60 Km. Including Loading And Unloading At Both Side. , Safe Carriage Of 11 Kv Xlpe Cable - Safe Carriage Of 11Kv Xlpe Cable 3X70 Sq. Mm From Store Center Etah / Nearest 33/11 Kv S/S To Direct Pit Site In Distance Range 0 To 60 Km. Including Loading And Unloading At Both Side. , Erection Of 11 M Stp Single Support - Erection Of 11 Mtr St Pole As Single Support Including Fixing Of All Ht/Lt Accessories Etc. Complet, Pole Should Be Grouted Properly As Per Dvvnl/Respo Norms. , Erection Of 11 M Stp Section Pole - Erection Of 11 Mtr Long St Pole As Section Pole Including Fixing Of All Ht/Lt Accessories Etc. Complete. Pole Should Be Grouted Properly As Per Dvvnl/Respo Norms. , Erection Of 11 M Stp Double Pole - Erection Of 11 Mtr Long St Pole As Double Pole Including Fixing Of All Ht/Lt Accessories Etc. Complete With Tpmo, Pole Should Be Grouted Properly As Per Dvvnl/Respo Norms. , Dismentalling Old Weseal Conductor - Dismentalling Of Old Acsr Weseal Conductor Stacking Of Proper Place. , Laying Acsr Weseal Conductor - Laying, Sagging Stringing, Binding, Jumpering & Fixing Of All Accessories Etc Of Acsr Weseal Conductor On The Newly/Old Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Required For Proper Completion Of Work. , Dismentalling Old Acsr Rabbit Conductor - Dismentalling Of Old Acsr Rabbit Conductor Stacking Of Proper Place. , Laying Acsr Rabbit Conductor - Laying, Sagging Stringing, Binding, Jumpering & Fixing Of All Accessories Etc Of Acsr Rabbit Conductor On The Newly/Old Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Required For Proper Completion Of Work. , Laying Of 11 Kv Xlpe Cable - Laying Of 11 Kv Xlpe Cable 3X120 Sq. Mm. On The Newly/Old Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Required For Proper Completion Of Work. , Laying Of 11 Kv Xlpe Cable - Laying Of 11 Kv Xlpe Cable 3X70 Sq. Mm. On The Newly/Old Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Required For Proper Completion Of Work. , Fixing Of Hdpe Pipe With Xlpe Cable - Fixing Of Hdpe Pipe 120 Mm Dia For U/G Laying Of 11 Kv Xlpe Cable 3X120 Sq Mm With Laid By Hdd Method Including Cable Laying , Fixing Of Hdpe Pipe With Xlpe Cable - Fixing Of Hdpe Pipe 120 Mm Dia For U/G Laying Of 11 Kv Xlpe Cable 3X70 Sq Mm With Laid By Hdd Method Including Cable Laying , Fixing Of Cable Jointiong Kit - Fixing Of 3X120 Xlpe Cable Jointing Kit Outdoor , Fixing Of Cable Jointiong Kit - Fixing Of 3X70 Xlpe Cable Jointing Kit Outdoor , Fixing Of Gi Pipe - Fixing Of Gi Pipe 6 Inch Dia , Erection Of Stone Pad - Fixing Of Stone Pad 300X300x75 Mm , Erection Of Barbed Wire - Fixing Of Barbed Wire , Erection Of F Cl - Fixing Of F Cl , Erection Of Danger Board - Fixing Of Danger Board With Cl , Erection Of Pg Cl - Fixing Of Pg Cl , Erection Of Holding Cl - Fixing Of Holding Cl , Laying Of Gi Wire 8 Swg - Laying Of Gi Wire 6 Swg All Complete Assoceries , Laying Of Gi Wire 10 Swg - Laying Of Gi Wire 8 Swg All Complete Assoceries , Erection Of Earthing Complete , Erection Of Stay Set Complete - Fixing Of Stay Set Complete Including The Work Of Nozzling Etc. , Safe Carriage Of Dismantilled Material - Safe Carriage Of Dismantilled Material (Cross Arm, Cl , F Cl , Top Channel/Weseal Conductor & Other Accessories Etc.) From The Pit Side To The Store Distance 0 To 60 Km. With Loading & Unloading At Both Ends And Proper Stacking In Store. , Safe Carriage Of Lt Line Material - Safe Carriage Of Line Material From Store Center Etah / Nearest 33/11 Kv S/S To Direct Pit Site In Distance Range 0 To 60 Km. Including Loading And Unloading At Both Side. , Safe Carriage Of 11 M Stp - Safe Carriage Of 11 Mtr Long St Pole From Store Center Etah / Nearest 33/11 Kv S/S To Direct Pit Site In Distance Range 0 To 60 Km. Including Loading And Unloading At Both Side. , Safe Carriage Of Lt Xlpe Cable - Safe Carriage Of Lt Xlpe Cable 3X120 Sq. Mm From Store Center Etah / Nearest 33/11 Kv S/S To Direct Pit Site In Distance Range 0 To 60 Km. Including Loading And Unloading At Both Side. , Safe Carriage Of Lt Ab Cable - Safe Carriage Of Lt Ab Cable 3X95 Sq. Mm From Store Center Etah / Nearest 33/11 Kv S/S To Direct Pit Site In Distance Range 0 To 60 Km. Including Loading And Unloading At Both Side. , Safe Carriage Of Lt Ab Cable - Safe Carriage Of Lt Ab Cable 1X16+1X25 Sq. Mm From Store Center Etah / Nearest 33/11 Kv S/S To Direct Pit Site In Distance Range 0 To 60 Km. Including Loading And Unloading At Both Side. , Erection Of Lt Xlpe Cable - Laying, Sagging Stringing, Binding, Jumpering & Fixing Of All Accessories Etc Of Lt Xlpe Cable 3X120 Sq. Mm On The Newly/Old Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Required For Proper Completion Of Work. , Dismentalling Of Lt Ab Cable - Dismentalling Of Lt Ab Cable 3X50+1X35+1X16 Sq. Mm Stacking Of Proper Place. , Erection Of Lt Ab Cable - Laying, Sagging Stringing, Binding, Jumpering & Fixing Of All Accessories Etc Of Lt Ab Cable 3X95 Sq. Mm On The Newly/Old Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Required For Proper Completion Of Work. , Erection Of Lt Ab Cable - Laying, Sagging Stringing, Binding, Jumpering & Fixing Of All Accessories Etc Of Lt Ab Cable 1X16+1X25 Sq. Mm On The Newly/Old Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Required For Proper Completion Of Work. , Fixing Of Hdpe Pipe With Xlpe Cable - Fixing Of Hdpe Pipe 120 Mm Dia For U/G Laying Of 11 Kv Xlpe Cable 3X120 Sq Mm With Laid By Hdd Method Including Cable Laying , Fixing Of Distribution Box With Cl - Fixing Of 3 Ph Distribution With Box Cl , Fixing Of Gi Pipe - Fixing Of Gi Pipe 6 Inch Dia , Erection Of Earthing Complete , Erection Of Stay Set Complete - Fixing Of Stay Set Complete Including The Work Of Nozzling Etc. , Safe Carriage Of Dismantilled Lt Ab Cable - Safe Carriage Of Dismantilled Material (Cable/Cl And Other Assoceries) From The Pit Side To The Store Distance 0 To 60 Km. With Loading & Unloading At Both Ends And Proper Stacking In Store. Total Quantity : 12710
Basic Detail
Tender No GEM/2026/B/7730915
Bidding Type Tender
Location
City Etah
State Uttar Pradesh
Key Dates
Publish Date 03 Jul 2026
Submission Date 18 Jul 2026
Open Date 18 Jul 2026
Finance
Tender Value 19 Lakhs
Tender Fee Ref. Documents
EMD 19000
Exemption Not Available
Document List
atcpilua_2026-07-01-13-27-44_02cd2cf6309b2b9bfb208a0b9a4df7ce.pdf
ATCPilua_e25b2be7-65cc-4bad-a4711782893213533_BUYEREDCETAH.pdf
06236aca-8dc4-466f-8ba0-edb924546e9f.pdf
9543218_Boq_1.xlsx

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 03, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 18, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 13 days
Jul 18, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 13 days

Tender Documents

Download All (ZIP) ↓
pdf

atcpilua_2026-07-01-13-27-44_02cd2cf6309b2b9bfb208a0b9a4df7ce.pdf

pdf

ATCPilua_e25b2be7-65cc-4bad-a4711782893213533_BUYEREDCETAH.pdf

pdf

06236aca-8dc4-466f-8ba0-edb924546e9f.pdf

xlsx

9543218_Boq_1.xlsx

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders