Tender For 11Kv Line (1Km) With Dtr 100Kva At El Ally Temple (Cw-5707-202526-15)
Tender Value
7.61 Lakhs
Estimated cost
Bid Submission
13 Jul 2026
1 days left
EMD
19100
Bank guarantee accepted
Document Fee
1888
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Kottayam → Kerala
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for 11Kv Line (1Km) With Dtr 100Kva At El Ally Temple (Cw-5707-202526-15)
BOQ
| Sl. No. | Item Description |
| 1 | Stringing of one km 3 PH 11kV line with XLPE Insulated ACSR Raccoon and installing 100KVA TFR |
| 2 | Providing Transformer fencing to a height of 1.8 m above ground level using MS Angle frames of size ISA 50x50x6mm for outer frame, 2 runs of 40 x 6 MS flat for horizondal brasing and grills with MS rods 8 mm Dia @ 10cm c/c for verticals, providing gate with locking arrangements, providing danger board & name board, embeding the legs in cement concrete 1:2:4, footing of size 30cmx30cmx50cm, painting with synthetic enamel paint two coats over one coat of iron primer etc complete, incl cost of transportation |
| 3 | Cleaning and levelling of transformer yard/RMU, spreading 40 mm broken stone in yard for a thickness of 10 cm above bed of 10 cm thick 6 mm broken stone, after constructing a curb wall of height 20cm above ground and 10cm below level including cost of all materials and charges for conveying, spreading, consolidating etc. |
| 4 | Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). |
| 5 | Fitting 5 channel cross arms, AB switch, DO fuse, LA(Ord), HT & LT connections upto OH lines, etc. on existing DP structure, Fixing distribution box/provision for one set (3No.) of LT fuses, , drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing & mounting of Transformer on poles. |
| 6 | Fitting one Additional V cross arm in existing single pole including conveyance of materials. |
| 7 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 8 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 9 | Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 10 | Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 11 | Dismantling (without damage) one km LT additional conductor line by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 12 | Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and ACSR Weasel for Neutral & Street Main, for one km LT 3ph 5 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. |
| 13 | Providing one Driven Earth using GI earth pipe of size 38.1mm dia, 2.5m length at minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in loose soil. |
| 14 | Fitting one additional Fuse unit and giving connection from Transformer to fuse and Distribution box to LT OH line. |
| 15 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials. |
| 16 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 17 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 18 | Transporting Transformers by hired vehicle to a distance upto 5km and carrying upto 2 numbers of 63/100/160/250kVA Transformers / Ring Main Units excluding loading& unloading charges. |
| 19 | Erecting one 100kVA Transformer to existing DP and giving connections,including loading from TMR/SRS/other stacking place & unloading at site but excluding cost for transporting transformer. |
| 20 | Additional rate for providing one disc set, PG clamp etc. complete, on any type of HT pole for making cut point. |
| 21 | Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing. |
| 22 | Fitting and providing one Strut using HT PSC pole including digging and back filling pit in ordinary soil. |
| 23 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 24 | Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 25 | Providing WP support with PSC pole including digging & back filling pit in ordinary soil. excluding transportation of poles. |
| 26 | Renewal of existing damaged/broken old LT stay in existing stay rod. |
| 27 | Renewal of existing damaged/broken old 11kV Stay to the existing stay rod. |
| 28 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. |
| 29 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires. |
| 30 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 31 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 32 | Additional rate for refitting/redoing one Shackle Set, including reshacling one span, while renewing any type of LT pole. |
| 33 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LT. pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. |
| 34 | Stringing of one km 3 PH 11kV line with XLPE Insulated ACSR Raccoon or equivalant (3 conductors) after fitting insulators, binding conductors to pin insulators using suitable tie and anchoring with wedge type anchoring clamps including cutting and removing tree branches wherever necessary excluding cut point works. |
| 35 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. |
| 36 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 37 | Dismantling (without damage) LT stay including digging pit in all classes of soil and backfilling. |
| 38 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 39 | Dismantling one damaged LT PSC/RCC Strut pole including removal of clamps and stacking. |
| 40 | Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 41 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 03, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedJul 13, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 1 dayJul 14, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender