Bids Are invited for Replacement Of Ac Copper Pipe And Duct Cover In Ac At Various Location At Af Stn Jammu
Tender Overview
Project Description
Bids Are invited for Replacement Of Ac Copper Pipe And Duct Cover In Ac At Various Location At Af Stn Jammu Supply And Fix Copper Pipe - Supply And Fix Copper Pipe 5 Oblique 8 Feet And Removing Old Unserviceable Copper Pipe At Various Location In Tech Area At Af Stn Complete All As Specified And Directed By Engineer-In-Charge. , Supply And Fix Copper Pipe 1 - Supply And Fix Copper Pipe 1 Oblique 4 Feet And Removing Old Unserviceable Copper Pipe At Various Location In Tech Area At Af Stn Complete All As Specified And Directed By Engineer-In-Charge. , Supply And Fixing Duct Cover - Supply And Fixing Duct Cover Size 4X2 Feet With Proper Fitting On Walls In Existing Air Conditioner Complete All As Specified And Directed. , Supply And Fix Foaming Insulator For Ac - Supply And Fix Foaming Insulator For Ac Suction Cooling Line7 Oblique 8 Feet Approx - Length 5.9 Ft Complete All As Specified And Directed. , Supply And Fixing The Nylon White Tape - Supply And Fixing The Nylon White Tape On Isulation On Suction Cooilng Pipe Complete All As Specified Aand Directed. , Supply And Fixing Xlpe Isulated - Supply And Fixing Xlpe Isulated Umaoured Heavy Duty Electric Cable With Copper Conductor1100 Volts Grade 4 Core Cross Sectional Area 4 Sqmm Complete All As Specified And Directed. , Material And Labour For System Fusing Welding - Material And Labour For System Fusing Welding Soldering Vaccumising And Gas Charging To Split Type Air Conditioners For The Following Capacity Upto 2 Ton. , Supply And Applying The Silicon Gel - Supply And Applying The Silicon Gel On The Gap Of Air Conditioner Duct Pipe With Proper Filling The Duct Pipe. , Supply And Fix Drain Pipe For Ac Approx Length - Supply And Fix Drain Pipe For Ac Approx Length Of Pipeis 6 Oblique 9 Feet Of Plastic Body , Supply And Applying The Flare On The Joint Of Ac - Supply And Applying The Flare On The Joint Of Ac Copper Pipe With The Outer Unit Of Air Conditioner Complete All As Specified And Directed. , Supply And Fix Pu Foam For Closing - Supply And Fix Pu Foam For Closing The Gap Of Ducting And Hole At Stn Jammu. , Supply And Fix Capping Casing Of Wodden Finish - Supply And Fix Capping Casing Of Wodden Finish For Cable In Various Location Air Force Station Total Quantity : 607
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Supply and Fix copper pipe | Supply and Fix copper pipe 5 oblique 8 feet and removing old unserviceable copper pipe at various location in Tech Area at AF Stn complete all as specified and directed by Engineer-in-charge. |
| 2 | Supply and Fix copper pipe 1 | Supply and Fix copper pipe 1 oblique 4 feet and removing old unserviceable copper pipe at various location in Tech Area at AF Stn complete all as specified and directed by Engineer-in-charge. |
| 3 | Supply and fixing duct cover | Supply and fixing duct cover size 4X2 feet with proper fitting on walls in existing air conditioner complete all as specified and directed. |
| 4 | Supply and fix foaming insulator for AC | Supply and fix foaming insulator for AC suction cooling line7 oblique 8 feet Approx - length 5.9 ft complete all as specified and directed. |
| 5 | Supply and fixing the nylon white tape | Supply and fixing the nylon white tape on isulation on suction cooilng pipe complete all as specified aand directed. |
| 6 | Supply and fixing XLPE isulated | Supply and fixing XLPE isulated umaoured heavy duty electric cable with copper conductor1100 volts grade 4 core cross sectional area 4 sqmm complete all as specified and directed. |
| 7 | Material and labour for system fusing welding | Material and labour for system fusing welding soldering vaccumising and gas charging to split type air conditioners for the following capacity upto 2 Ton. |
| 8 | Supply and applying the silicon gel | Supply and applying the silicon gel on the gap of air conditioner duct pipe with proper filling the Duct pipe. |
| 9 | Supply and fix drain pipe for AC approx length | Supply and fix drain pipe for AC approx length of pipeis 6 oblique 9 feet of plastic body |
| 10 | Supply and applying the flare on the joint of AC | Supply and applying the flare on the joint of AC copper pipe with the outer unit of air conditioner complete all as specified and directed. |
| 11 | Supply and fix PU foam for closing | Supply and fix PU foam for closing the gap of ducting and hole at stn jammu. |
| 12 | Supply and fix capping casing of wodden finish | Supply and fix capping casing of wodden finish for cable in various location air force station |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 9 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender