Bids Are invited for Modular Work Stations (V3) (Q2) - Name Of Work , Estimated Cost , Procurement Mode , Delivery Period , Warranty , 15 Heavy-Duty Modular L-Shape Workstations , 15 Ergonomic High-Back Chairs , Integrated Electrical Raceway System ,
Tender Overview
Project Description
Bids Are invited for Modular Work Stations (V3) (Q2) - Name Of Work , Estimated Cost , Procurement Mode , Delivery Period , Warranty , 15 Heavy-Duty Modular L-Shape Workstations , 15 Ergonomic High-Back Chairs , Integrated Electrical Raceway System , Modular Power Sockets , Lan Cabling And Data Ports , Telephone Cabling And Ports , Complete Installation And Commissioning , Transportation, Loading And Unloading , Labour And Accessories , Workstation Type , Quantity , Main Desk Size , Return Size , Desk Height , Board Material , Surface Finish , Edge Banding , Structure , Steel Thickness , Powder Coating , Anti-Rust Treatment , Partition Height , Partition Thickness , Storage , Locking , Wire Management , Cpu Provision , Power Module , Data Provision , Telephone Provision , Cable Access , Load Capacity , Quantity , Chair Type , Backrest , Seat , Headrest , Lumbar Support , Armrest , Mechanism , Gas Lift , Base , Castors , Load Capacity , Warranty , 03 Modular Power Sockets , 01 Lan Data Port , 01 Telephone Port , Concealed Wiring Arrangement , Raceway System For Power And Data , Complete Cabling And Termination , Cat-6 Lan Cabling , Oem Or Authorized Dealer , Valid Quality Certifications , Minimum 5-Year Warranty , Experience In Institutional Furniture , Technical Compliance Submission , 25 Mm Hdhmr Board , 1.2 Mm Steel Structure , 2 Mm Pvc Edge Banding , Acoustic Partition , 3 Power Sockets , Lan Port , Telephone Port , Ergonomic High Back Chair , 5 Years Warranty , Heavy Duty Modular L-Shape Workstation , Ergonomic High Back Chair , Power Modules, Wiring And Accessories , Lan Cabling And Termination , Telephone Cabling And Termination , Transportation , Installation And Labour Total Quantity : 15
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Name of Work | Name of Work |
| 2 | Estimated Cost | Estimated Cost |
| 3 | Procurement Mode | Procurement Mode |
| 4 | Delivery Period | Delivery Period |
| 5 | Warranty | Warranty |
| 6 | 15 Heavy-Duty Modular L-Shape Workstations | 15 Heavy-Duty Modular L-Shape Workstations |
| 7 | 15 Ergonomic High-Back Chairs | 15 Ergonomic High-Back Chairs |
| 8 | Integrated Electrical Raceway System | Integrated Electrical Raceway System |
| 9 | Modular Power Sockets | Modular Power Sockets |
| 10 | LAN Cabling and Data Ports | LAN Cabling and Data Ports |
| 11 | Telephone Cabling and Ports | Telephone Cabling and Ports |
| 12 | Complete Installation and Commissioning | Complete Installation and Commissioning |
| 13 | Transportation, Loading and Unloading | Transportation, Loading and Unloading |
| 14 | Labour and Accessories | Labour and Accessories |
| 15 | Workstation Type | Workstation Type |
| 16 | Quantity | Quantity |
| 17 | Main Desk Size | Main Desk Size |
| 18 | Return Size | Return Size |
| 19 | Desk Height | Desk Height |
| 20 | Board Material | Board Material |
| 21 | Surface Finish | Surface Finish |
| 22 | Edge Banding | Edge Banding |
| 23 | Structure | Structure |
| 24 | Steel Thickness | Steel Thickness |
| 25 | Powder Coating | Powder Coating |
| 26 | Anti-Rust Treatment | Anti-Rust Treatment |
| 27 | Partition Height | Partition Height |
| 28 | Partition Thickness | Partition Thickness |
| 29 | Storage | Storage |
| 30 | Locking | Locking |
| 31 | Wire Management | Wire Management |
| 32 | CPU Provision | CPU Provision |
| 33 | Power Module | Power Module |
| 34 | Data Provision | Data Provision |
| 35 | Telephone Provision | Telephone Provision |
| 36 | Cable Access | Cable Access |
| 37 | Load Capacity | Load Capacity |
| 38 | Quantity | Quantity |
| 39 | Chair Type | Chair Type |
| 40 | Backrest | Backrest |
| 41 | Seat | Seat |
| 42 | Headrest | Headrest |
| 43 | Lumbar Support | Lumbar Support |
| 44 | Armrest | Armrest |
| 45 | Mechanism | Mechanism |
| 46 | Gas Lift | Gas Lift |
| 47 | Base | Base |
| 48 | Castors | Castors |
| 49 | Load Capacity | Load Capacity |
| 50 | Warranty | Warranty |
| 51 | 03 Modular Power Sockets | 03 Modular Power Sockets |
| 52 | 01 LAN Data Port | 01 LAN Data Port |
| 53 | 01 Telephone Port | 01 Telephone Port |
| 54 | Concealed Wiring Arrangement | Concealed Wiring Arrangement |
| 55 | Raceway System for Power and Data | Raceway System for Power and Data |
| 56 | Complete Cabling and Termination | Complete Cabling and Termination |
| 57 | Cat-6 LAN Cabling | Cat-6 LAN Cabling |
| 58 | OEM or Authorized Dealer | OEM or Authorized Dealer |
| 59 | Valid Quality Certifications | Valid Quality Certifications |
| 60 | Minimum 5-Year Warranty | Minimum 5-Year Warranty |
| 61 | Experience in Institutional Furniture | Experience in Institutional Furniture |
| 62 | Technical Compliance Submission | Technical Compliance Submission |
| 63 | 25 mm HDHMR Board | 25 mm HDHMR Board |
| 64 | 1.2 mm Steel Structure | 1.2 mm Steel Structure |
| 65 | 2 mm PVC Edge Banding | 2 mm PVC Edge Banding |
| 66 | Acoustic Partition | Acoustic Partition |
| 67 | 3 Power Sockets | 3 Power Sockets |
| 68 | LAN Port | LAN Port |
| 69 | Telephone Port | Telephone Port |
| 70 | Ergonomic High Back Chair | Ergonomic High Back Chair |
| 71 | 5 Years Warranty | 5 Years Warranty |
| 72 | Heavy Duty Modular L-Shape Workstation | Heavy Duty Modular L-Shape Workstation |
| 73 | Ergonomic High Back Chair | Ergonomic High Back Chair |
| 74 | Power Modules, Wiring and Accessories | Power Modules, Wiring and Accessories |
| 75 | LAN Cabling and Termination | LAN Cabling and Termination |
| 76 | Telephone Cabling and Termination | Telephone Cabling and Termination |
| 77 | Transportation | Transportation |
| 78 | Installation and Labour | Installation and Labour |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 19 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 19 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender