Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rate Contract For Repair Of Two (02) Lp Air Compressors; Lp Air Compressor; Service Provider - Removal And Dismantling Of Lp Air Compressor Screw Un
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rate Contract For Repair Of Two (02) Lp Air Compressors; Lp Air Compressor; Service Provider - Removal And Dismantling Of Lp Air Compressor Screw Unit Along With Entire Accessories Viz, Canopy System, Hose Assembly, Filters, Separators, Spacers, Etc From Foundation Skid , Repair/ Replacement Of Air Inlet System, Including Intake Valve, Air Filter, Indicator Air Filter, Stage Valves, Etc , Repair/ Replacement Of Control System Parts, Including Solenoids, Pressure Regulators, Tubes, Pcbs, Display Panel (Hmi), Etc , Repair/ Replacement Of Discharge System, Discharge Valve, Pipe, Element Separator, Ball Valve, Check Valve, Pressure Maintaining Valve, Etc , Repair/ Replacement Of Cooling System, Cooler Assembly, Etc , Repair/ Replacement Of Lubrication System, Hose Assembly Cooler In-Out, Hose Assembly Oil Injection, Filter Assembly, Etc , Removal Of Corroded Discharge Pipelines , Supply And Installation Of Discharge Pipelines Along With Necessary Accessories, Valves, Bends, Gaskets, O-Rings, Fasteners, Etc , Re-Assembly And Alignment Of All The Removed Parts Along With Accessories On New Foundation Skid. , Top-Up Oil Cooler And Lub Oil To The Level, With The Lubricant As Recommended In The Manual. , Test/ Trials Of The Lp Air Compressors And Its Associated Pipelines.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Removal and dismantling of LP air compressor screw unit along with entire accessories viz, canopy system, hose assembly, filters, separators, spacers, etc from foundation skid | Removal and dismantling of LP air compressor screw unit along with entire accessories viz, canopy system, hose assembly, filters, separators, spacers, etc from foundation skid |
| 2 | Repair/ replacement of air inlet system, including intake valve, air filter, indicator air filter, stage valves, etc | Repair/ replacement of air inlet system, including intake valve, air filter, indicator air filter, stage valves, etc |
| 3 | Repair/ replacement of control system parts, including solenoids, pressure regulators, tubes, PCBs, display panel (HMI), etc | Repair/ replacement of control system parts, including solenoids, pressure regulators, tubes, PCBs, display panel (HMI), etc |
| 4 | Repair/ replacement of discharge system, discharge valve, pipe, element separator, ball valve, check valve, pressure maintaining valve, etc | Repair/ replacement of discharge system, discharge valve, pipe, element separator, ball valve, check valve, pressure maintaining valve, etc |
| 5 | Repair/ replacement of cooling system, cooler assembly, etc | Repair/ replacement of cooling system, cooler assembly, etc |
| 6 | Repair/ replacement of lubrication system, hose assembly cooler in-out, hose assembly oil injection, filter assembly, etc | Repair/ replacement of lubrication system, hose assembly cooler in-out, hose assembly oil injection, filter assembly, etc |
| 7 | Removal of corroded discharge pipelines | Removal of corroded discharge pipelines |
| 8 | Supply and installation of discharge pipelines along with necessary accessories, valves, bends, gaskets, o-rings, fasteners, etc | Supply and installation of discharge pipelines along with necessary accessories, valves, bends, gaskets, o-rings, fasteners, etc |
| 9 | Re-assembly and alignment of all the removed parts along with accessories on new foundation skid. | Re-assembly and alignment of all the removed parts along with accessories on new foundation skid. |
| 10 | Top-up oil cooler and lub oil to the level, with the lubricant as recommended in the manual. | Top-up oil cooler and lub oil to the level, with the lubricant as recommended in the manual. |
| 11 | Test/ trials of the LP air compressors and its associated pipelines. | Test/ trials of the LP air compressors and its associated pipelines. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 13 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 13 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender