Tender For 07 - Construction Of cement concrete Road Bhichor To Mining Area Km 0/00 To 1/500 Under Dmft Scheme Year 2025-26
Tender Value
2.76 Crore
Estimated cost
Bid Submission
23 Jul 2026
19 days left
EMD
5.52 Lakhs
Bank guarantee accepted
Document Fee
2000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Chittorgarh → Rajasthan
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for 07 - Construction Of cement concrete Road Bhichor To Mining Area Km 0/00 To 1/500 Under Dmft Scheme Year 2025-26
BOQ
| Sl. No. | Item Description |
| 1 | PART-A CC Pavement |
| 2 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201 By Mechanical Means In area of non-thorny jungle |
| 3 | Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300-1 and 300-2 for embankment construction as per MoRTH Specification Clause 305.3.4 |
| 4 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 |
| 5 | Carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete.Earth, Sand, Lime, Morrum manure or sludge . For 5 km |
| 6 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 7 | Providing crushed run stone aggregate greading conforming to table 400-14 depositing on a prepared surface by hauling vehicles, spreading and mixing with a motor grader, watering and compacting with a three wheel 80-100 kN static roller as per MoRTH Specification Clause 407 to form a layer of sub-base/base By mixing plant method With 53 mm maximum size of aggregates |
| 8 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. |
| 9 | Construction of un-reinforced , plain cement concrete pavement M-40 (Grade), thickness as per design, over a prepared sub base, with 43/53 grade cement as per Clause 602, coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 31.5 mm, mixed in a in fully automatic Batching Plant and transported to site in transit mixer for having continuous agitated mixer, manufactured as per approved mix design including pumping of R.M.C. from transit mixer to site of laying , with all lead and lift including cost of admixtures in recommended portion as per IS 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge laid with a Fixed Form Paver (laying and fixing of 150 micron thick polythene Film and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using water finishing to lines and grade as per drawing and MoRTH Specification Clause 602 including vaccum dewatering process with all required equipments (Dowel Bars will be paid seprately). |
| 10 | Providing and Fixing of Dowel Bars of Mild Steel confirming to IS : 432 of specified length and diameters as per MoRTH Specification IRC 15 & 58 including cutting, placing in position across transverse joint with proper spacing, providing with PVC sleeve complete as per drawing, technical specification and as per direction of the Engineer-in-charge. |
| 11 | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause |
| 12 | 600 mm dia |
| 13 | 300 mm dia |
| 14 | Part \\"B\\" CD Work (i) ( RCC Slab Culvert) |
| 15 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per MoRTH Specification Clause 202.By Mechanical Means Cement Concrete |
| 16 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per MoRTH Specification Clause 202.Rubble Stone Masonry in Cement Mortar |
| 17 | FOUNDATION |
| 18 | Earth work in excavation for foundation of structure complete with all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per MoRTH specification |
| 19 | In ordinary soil Depth upto 3 metre |
| 20 | in hard rock |
| 21 | Providing and laying Cement concrete for plain/reinforced concrete in open foundation as per drawing and technical specification as per MoRTH Specification : Section 1500, 1700 & 2100 including form work at any level. P.C.C. grade M20 |
| 22 | Structural cement concrete (Design Mix) in open foundations, with form work, at any level. Cement concrete for plain/reinforced concrete in open foundations as per drawing and technical specification. [MoRTH Specification : Section 1700 & 1500]. With 20mm nominal size aggregate By using concrete mixer R.C.C. M-20 grade |
| 23 | Providing and laying steel reinforcement at any level in foundation/ pile/ pile cap complete as per drawing and clause 1600 of MoRT&H Specification including all material, labour and machinery. 'The structural steel to be used should be used ballot by Primary Steel manufactured and approved by Engineering in charged .'FE 415/500 Steel reinforcement |
| 24 | SUB STRUCTURE |
| 25 | Structural Cement concrete for plain concrete/ reinforced concrete for substructure at any level, complete as per drawing and technical specification. Using Batching Plant, Transit Mixture, and Concrete Pump. Design mix concrete - [MoRTH Specification : Clause 1500&1700] R.C.C including formwork R.C.C. grade M30 upto 5 metre height |
| 26 | Supplying, fitting and placing reinforcement in sub structure/ superstructure at all level complete as per drawing and clause 1600 & 2200 of MoRT&H Specification including all material, labour, machinary etc.The structural steel to be used should be used ballot by Primary Steel manufactured and approved by Engineering in charged, 'FE 415/500D HYSD Steel reinforcement |
| 27 | Providing A.C pipe Weep holes 150mm dia in Masonry/Plain Concrete/.Reinforced Concrete abutment, wing wall/return wall complete as per drawing and technical specfication as per MoRTH Specification Clause 2205 |
| 28 | SUPER STRUCTURE |
| 29 | Structural Cement concrete for reinforced concrete in superstructure at any level complete including steel formwork, scaffolding etc. as per drawing and technical specification as per Design mix MoRTH Specification 1500 & 1700. M 35 grade solid slab superstructure |
| 30 | Supplying, fitting and placing reinforcement in sub structure/ superstructure at all level complete as per drawing and clause 1600 & 2200 of MoRT&H Specification including all material, labour, machinary etc.The structural steel to be used should be used ballot by Primary Steel manufactured and approved by Engineering in charged, 'FE 415/500D HYSD Steel reinforcement |
| 31 | Providing and laying Expansion Joint complete as per drawing and technical specification Providing & Fixing in position 20mm thick pre-moulded joint filler in expansion joint complete |
| 32 | Providing and filling joint sealing compound -Coarse sand with bitumen (6% by weight) |
| 33 | P&F on culverts/ bridges deck rain water spouts made of cast iron as per MoRTH specification complete |
| 34 | Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRT&H specifications with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification including all material, labour, machinery as per clause 710.1.4 of IRC:78 and clause 2200 of MoRT&H specification. |
| 35 | Back filling behind abutment, wing wall and return wall in 150mm layers, with mechanical compaction, complete with all lead and lift as per drawing and technical specification as per MoRTH Specification : Clause : 304 Sandy material |
| 36 | P.C.C. M 15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and MoRTH specifications Clauses 1700 and 2704 Nominal mix (1:2.5:5) |
| 37 | Reinforced Cement Concrete M 25 grade approach slab including reinforcement and formwork complete as per drawing and MoRTH specifications Clauses 1700 and 2704 |
| 38 | Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and MoRTH specifications Clauses 1700 and 2702.2 |
| 39 | Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and MoRTH specifications Clauses 1700, 1500 and 2703.3 |
| 40 | Total Part \\"B\\" CD Work (i) ( RCC Slab Culvert) |
| 41 | Part \\"B\\" CD Work (ii) ( Hume pipe Culvert) |
| 42 | Earthwork in excavation for structures as per drawing and MoRTH specifications Clause 304.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary soil Upto 3 m depth |
| 43 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104 P.C.C grade M 10 Nominal mix 1:3:6 |
| 44 | Plain/reinforced cement concrete in substructure complete as per drawings and MoRTH specification Clauses 1700 and 2200 R.C.C grade M 20 |
| 45 | Providing and Laying Reinforced Cement Concrete Pipe NP4 as per design in Single Row Providing and laying reinforced cement concrete pipe NP4 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 2905. |
| 46 | Providing and laying steel reinforcement at any level in foundation/ pile/ pile cap complete as per drawing and clause 1600 of MoRT&H Specification including all material, labour and machinery. 'The structural steel to be used should be used ballot by Primary Steel manufactured and approved by Engineering in charged .'FE 415/500 Steel reinforcement |
| 47 | Part ''D'' PROTECTION Work\\"D\\" |
| 48 | Earthwork in excavation for structures as per drawing and MoRTH specifications Clause 304.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary soil Upto 3 m depth |
| 49 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104 P.C.C grade M 10 Nominal mix 1:3:6 |
| 50 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104 R.C.C grade M 20 |
| 51 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and MoRTH specification Clauses 1409, 2204.4, 2206.4 & 2706 |
| 52 | Providing and laying steel reinforcement at any level in foundation/ pile/ pile cap complete as per drawing and clause 1600 of MoRT&H Specification including all material, labour and machinery. 'The structural steel to be used should be used ballot by Primary Steel manufactured and approved by Engineering in charged .'FE 415/500 Steel reinforcement |
| 53 | Total Part \\"F\\" ROAD FURNITURE WORK |
| 54 | Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and MoRTH Specification Clause 801 |
| 55 | Ordinary Kilometer Stone (Precast) |
| 56 | 200 m stone (precast) |
| 57 | Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 801.3.1 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and MoRTH Specification Clause 801 900 mm equilateral triangle |
| 58 | Providing and erecting direction and place identification retroreflectorised sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 801.3.1, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on RCC Post 100 mm x 100 mm firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 450 x 450 x 600 mm, 600 mm below ground level as per approved drawing and MoRTH Specification Clause 801,upto 0.9 sqm size board |
| 59 | Supply & Fixing of flood gauge (water Gauge) as per I.R.C. 67 standard 200 cm long fixed on angle iron posts 50x50x6 mm, 2.6 M. long. |
| 60 | Marking Centre Line and stop lines etc. on road as per IRC pattern with thermoplastic paint of approved quality and make with 8% glass beads laid on the road surface at temperature 160\\" C with a special applicator machine complete with a special applicator machine complete with labour material and traffic diversion arrangements. |
| 61 | Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and MoRTH Specification Clause 807 |
| 62 | Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and MoRTH Specification Clause 801 |
| 63 | Supply of Hazard Marker made out of 2 mm thick M.S. sheet size 300x300x3 mm framed with angle iron 25x25x3 mm and fixed on channel posts 75x40x6 mm and hold fast at bottom whole body is painted in white stoving enamel and 6 Nos., 5 cm dia reflective sheet on white reflective background with additional border of 1.25 cm all arount it. |
| 64 | Providing and Erecting typical Citizen's information Board as per approved drawing & specification made of two MS sheet of 1.6 mm thick each of size 900mm x 750mm stiffend by angle iron 25mmx25mm x 3mm all around the plate & plates fixed on frame of 75mm dia pipe of 12 SWG sheet (vertical post 3050 mm with angle holdfasts and horizontal member 900mm) to be joined by embedded in cement concrete M-15 grade of block of 600mmx 600mm x 750 mm size below ground level as per enclosed drawings & as directed by Engineering incharge. All MS will be stove anmeled on both side lettering. Figuring and border will be with ready mixed synthethic enamel paint of superior quality in required shade and colour etc complete in all respect. All sections of framed post and steel tube will be painted with primer and two coat of epoxy paint as per drawing and as per Specification. |
| 65 | Construction of Foundation / Inaugration Pedastal in 23 cm thick Brick masonry in CM 1:4 of size 1.20m x 1.80m above ground level with adequate foundation including providing and fixing of Granite stone of size 0.75m x0.60m with engraving letters and figures,cement plaster,white washing etc. complete as per direction of Engineer in charge. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 03, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedJul 23, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 19 daysJul 27, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 23 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender