Tender For Supplying, Installation And Commissioning Of Domestic Type Ro+Uv Water Purifier In Hostel Building, Hanger Building & Administrative Building And Supplying, Installation And Commissioning Of New Hdpe Water Tanks And Allied Works At Air Por
Tender Overview
Project Description
Tender for Supplying, Installation And Commissioning Of Domestic Type Ro+Uv Water Purifier In Hostel Building, Hanger Building & Administrative Building And Supplying, Installation And Commissioning Of New Hdpe Water Tanks And Allied Works At Air Port C Us Dumka. , Hostel Building At Air Port Campus Dumka , Cost Towards Supply/Fixing Polyethelene Water Storage Tank Of Mark With Cover And Suitable Locking System In Triple Layer Confirming To Is:12701-1996 With Latest Revision. , Cost Towards Dismantling, Removing And Bringing Down Existing 1500 Ltrs Hdpe Water Tank Including Removal Of Damaged Ball Valve, Tank Connector And Damaged Pipe Including Supplying All Materials, Tools Etc. All Complete. , Supplying All Materials Labours Tools And Equipment For Laying In Of Isi Mark Upvc Pipe With Solvent Cement Including Cutting, Jointing Where Necessary Etc. All Complete As Per Specification And Direction Of E/I. Make-Supreme/Asirwad/Astral/Reputed Isi Make. (I) 50 Mm Dia. Upvc Pipe. , (Ii) 32 Mm Dia Upvc Pipe , (Iii) 25Mm Dia. Upvc Pipe For Over Flow , Supplying All Materials Labours Tools And Equipment For Fitting And Fixing Special Type Chrome Plated Upvc Fittings Of Approved Make All Complete As Per Specification And Direction Of The E/I. Make-Supreme/ Ashirwad/Astral/Reputed Isi Make For New Water Storage Tank. (01 No). I. Union - 50 Mm Dia. Upvc. , Ii. Tank Connector-50 Mm Dia. Upvc. , Iii. Tee-50 Dia. Upvc. , Iv. 50 Mm Dia. Ball Valve Upvc. , V. Elbow - 50 Mm Dia. Upvc. , Vi. Plain Coupler-50 Mm Dia. Upvc. , Vii. Elbow - 32 Mm Dia. Upvc. , Viii. Plain Coupler-32Mm Dia. Upvc. , Ix. 32 Mm Dia. Ball Valve Upvc. , Supplying All Materials Labours Tools And Equipment For Laying In Of Isi Mark Upvc Pipe With Solvent Cement Including Cutting, Jointing Where Necessary Etc. All Complete As Per Specification And Direction Of E/I. Make-Supreme/Asirwad/Astral/Reputed Isi Make For Existing & Damaged Water Storage Tank. (05 Nos.) Including Over Flow. (I) 50 Mm Dia. Upvc Pipe. , (Ii) 32 Mm Dia. Upvc Pipe , (Iii) 25Mm Dia. Upvc Pipe For Over Flow , Supplying All Materials Labours Tools And Equipment For Fitting And Fixing Special Type Chrome Plated Upvc Fittings Of Approved Make All Complete As Per Specification And Direction Of The E/I. Make-Supreme/ Ashirwad/ Astral/ Reputed Isi Make For Old & Existing Water Storage Tank. (05 Nos.) Including Over Flow. I. Union - 50 Mm Dia. Upvc , Ii. Tank Connector-50 Mm Dia. Upvc , Iii. Tee-50 Dia. Upvc , Iv. 50 Mm Dia. Ball Valve Upvc , V. Elbow - 50 Mm Dia. Upvc , Vi. Plain Coupler-50 Mm Dia. Upvc , Vii. Elbow - 32 Mm Dia. Upvc , Viii. Plain Coupler-32Mm Dia. Upvc , Ix. 32 Mm Dia. Ball Valve Upvc , X. 25Mm Dia. Coupler Upvc , Xi. 25Mm Dia. Elbow Upvc , Xii. 1500 Ltrs Hdpe Tank Lid Cover. , Supply, Installation, Testing And Commissioning Of Ro+Uv Based Domestic Water Purifier Of Reputed Make Like Aquaguard (Eureka Forbes) / Kent / Pureit/Kinnova Or Equivalent, Having Following Specifications: Purification Technology: Ro + Uv Purification Stages: Minimum 8-9 Stage Purification System Input Water Quality: Tds Handling Capacity: Up To 1500-2000 Mg/L Turbidity: Up To 15 Ntu Iron: Up To 0.3 Mg/L Chlorine: Up To 0.2 Mg/L Purified Water Output: Minimum 9 Lph Or Higher (Acceptable) Storage Capacity: Minimum 6-8 Litres Power Requirement: 220-230V Ac, 50 Hz Body Material: Food Grade Abs / High-Quality Plastic, Corrosion Resistant Auto Shut-Off System Suitable For Municipal / Borewell / Tanker Water Installation: Complete With All Accessories, Fittings, Connection To Storage/Chiller If Required. , Consumable For 1 Year- Ro Candle Set , Contractor Profit And Overhead Charges @ 14.95% Of Sl. No. 1.30 And 1.31 , Cost Towards Making Of Water Connection Point For Water Purifier System With Supply And Fitting Of 1 Dia. Upvc Pipe 1 Dia. Upvc/Steel Ball Valve, Upvc Elbow, Upvc Socket, Upvc Solvent And Teflon Tap And Electric Connection Point For Water Purifier System With Supply And Fitting Of 32Amp. Five Pin Socket With Board, Switches, Wire, Flat Casing Pipe As Required At Site With All Labour Tools And Tackles Etc. All Complete Job. In Ground Floor. , Cost Towards Making Of Water Connection Point For Water Purifier System With Supply And Fitting Of 1 Dia. Upvc Pipe 1 Dia. Upvc/Steel Ball Valve, Upvc Elbow, Upvc Socket, Upvc Solvent And Teflon Tap And Cost Towards Making Waste Water Outlet By Wall Cutting And Electric Connection Point For Water Purifier System With Supply And Fitting Of 32Amp. Five Pin Socket With Board, Switches, Wire, Flat Casing Pipe As Required At Site With All Labour Tools And Tackles Etc. All Complete Job. In 1St Floor. , Hanger Building At Air Port Campus Dumka , Supply, Installation, Testing And Commissioning Of Ro+Uv Based Domestic Water Purifier Of Reputed Make Like Aquaguard (Eureka Forbes) / Kent / Pureit/Kinnova Or Equivalent, Having Following Specifications: Purification Technology: Ro + Uv Purification Stages: Minimum 8-9 Stage Purification System Input Water Quality: Tds Handling Capacity: Up To 1500-2000 Mg/L Turbidity: Up To 15 Ntu Iron: Up To 0.3 Mg/L Chlorine: Up To 0.2 Mg/L Purified Water Output: Minimum 9 Lph Or Higher (Acceptable) Storage Capacity: Minimum 6-8 Litres Power Requirement: 220-230V Ac, 50 Hz Body Material: Food Grade Abs / High-Quality Plastic, Corrosion Resistant Auto Shut-Off System Suitable For Municipal / Borewell / Tanker Water Installation: Complete With All Accessories, Fittings, Connection To Storage/Chiller If Required. , Consumable For 1 Year- Ro Candle Set , Contractor Profit And Overhead Charges @ 14.95% Of Sl. No. 2.01 And 2.02 , Cost Towards Making Of Water Connection Point For Water Purifier System With Supply And Fitting Of 1 Dia. Upvc Pipe 1 Dia. Upvc/Steel Ball Valve, Upvc Elbow, Upvc Socket, Upvc Solvent And Teflon Tap And Electric Connection Point For Water Purifier System With Supply And Fitting Of 32Amp. Five Pin Socket With Board, Switches, Wire, Flat Casing Pipe As Required At Site With All Labour Tools And Tackles Etc. All Complete Job. , Supplying All Materials Labours Tools And Equipment For Fitting And Fixing Special Type Chrome Plated Upvc Fittings Of Approved Make All Complete As Per Specification And Direction Of The E/I. Make-Supreme/ Ashirwad/ Astral/ Reputed Isi Make For Old Water Storage Tank (02 Nos.) Including Over Flow. I. 1500 Ltrs Hdpe Tank Lid Cover. , Ii. 25Mm Dia Upvc Pipe For Over Flow. , Iii. Plain Coupler-25Mm Dia Upvc , Administrative Building At Air Port Campus Dumka , Cost Towards Supply/Fixing Polyethelene Water Storage Tank Of Mark With Cover And Suitable Locking System In Two Layer Confirming To Is:12701-1996 With Latest Revision. (2 Nos.) , Cost Towards Dismantling, Removing And Bringing Down Existing 1000 Ltrs Hdpe Water Tank Including Removal Of Damaged Ball Valve, Tank Connector And Damaged Pipe Including Supplying All Materials, Tools Etc. All Complete. , Supplying All Materials Labours Tools And Equipment For Laying In Of Isi Mark Upvc Pipe With Solvent Cement Including Cutting, Jointing Where Necessary Etc. All Complete As Per Specification And Direction Of E/I. Make-Supreme/Asirwad/Astral/Reputed Isi Make. (I) 50 Mm Dia. Upvc Pipe. , (Ii) 32 Mm Dia Upvc Pipe , (Iii) 25Mm Dia. Upvc Pipe For Over Flow , Supplying All Materials Labours Tools And Equipment For Fitting And Fixing Special Type Chrome Plated Upvc Fittings Of Approved Make All Complete As Per Specification And Direction Of The E/I. Make-Supreme/ Ashirwad/Astral/Reputed Isi Make For New Water Storage Tank. (01 No). I. Union - 50 Mm Dia. Upvc , Ii. Tank Connector-50 Mm Dia. Upvc , Iii. Tee-50 Dia. Upvc , Iv. 50 Mm Dia. Ball Valve Upvc , V. Elbow - 50 Mm Dia. Upvc , Vi. Plain Coupler-50 Mm Dia. Upvc , Vii. Elbow - 32 Mm Dia. Upvc , Viii. Plain Coupler-32Mm Dia. Upvc , Ix. 32 Mm Dia. Ball Valve Upvc , Supplying All Materials Labours Tools And Equipment For Laying In Of Isi Mark Upvc Pipe With Solvent Cement Including Cutting, Jointing Where Necessary Etc. All Complete As Per Specification And Direction Of E/I. Make-Supreme/Asirwad/Astral/Reputed Isi Make For New Connection Of Garden. (I) 50 Mm Dia. Upvc Pipe. , (Ii) 32 Mm Dia. Upvc Pipe , (Iii) 25Mm Dia. Upvc Pipe For Over Flow , Supplying All Materials Labours Tools And Equipment For Fitting And Fixing Special Type Chrome Plated Upvc Fittings Of Approved Make All Complete As Per Specification And Direction Of The E/I. Make-Supreme/ Ashirwad/ Astral/ Reputed Isi Make For Old & Existing Water Storage Tank (05 Nos.) Including Over Flow. I. Brass Garden Bibcock , Ii. G.I. Nipple- 25Mm Dia. , Iii. Tee-50 Dia. Upvc , Iv. 50 Mm Dia. Ball Valve Upvc , V. Elbow - 50 Mm Dia. Upvc , Vi. Plain Coupler-50 Mm Dia. Upvc , Vii. Elbow - 32 Mm Dia. Upvc , Viii. Plain Coupler-32Mm Dia. Upvc , Ix. 32 Mm Dia. Ball Valve Upvc , X. 25Mm Dia. Coupler Upvc , Xi. 25Mm Dia. Elbow Upvc , Earth Work In Excavation (As Per I.S. 3114) 1965 For Laying Of Different Type And Sizes Of Pipe So As To Give One Meter Average Cover Over The Socket Of Pipe With Disposal Of Excavated Earth Within Initial Lead And Lift As Per Specification & Direction E/I. Upvc Pipe 32Mm -6.66M3 Upvc Pipe 25Mm-2.18M3 90% Of Total (As Per Soil Item Class A) , 10% Of Total (As Per Soil Item Class B) , Earth Work In Back Filling In The Trenches After Laying Different Sizes Of Pipe With Earth Removed During Excavation Lead & Left As Per Specification & Direction Of E/I. , Supply, Installation, Testing And Commissioning Of Ro+Uv Based Domestic Water Purifier Of Reputed Make Like Aquaguard (Eureka Forbes) / Kent / Pureit/Kinnova Or Equivalent, Having Following Specifications: Purification Technology: Ro + Uv Purification Stages: Minimum 8-9 Stage Purification System Input Water Quality: Tds Handling Capacity: Up To 1500-2000 Mg/L Turbidity: Up To 15 Ntu Iron: Up To 0.3 Mg/L Chlorine: Up To 0.2 Mg/L Purified Water Output: Minimum 9 Lph Or Higher (Acceptable) Storage Capacity: Minimum 6-8 Litres Power Requirement: 220-230V Ac, 50 Hz Body Material: Food Grade Abs / High-Quality Plastic, Corrosion Resistant Auto Shut-Off System Suitable For Municipal / Borewell / Tanker Water Installation: Complete With All Accessories, Fittings, Connection To Storage/Chiller If Required , Consumable For 1 Year- Ro Candle Set , Contractor Profit And Overhead Charges @ 14.95% Of Sl. No. 3.32 And 3.33 , Cost Towards Making Of Water Connection Point For Water Purifier System With Supply And Fitting Of 1 Dia. Upvc Pipe 1 Dia. Upvc/Steel Ball Valve, Upvc Elbow, Upvc Socket, Upvc Solvent And Teflon Tap And Electric Connection Point For Water Purifier System With Supply And Fitting Of 32Amp. Five Pin Socket With Board, Switches, Wire, Flat Casing Pipe As Required At Site With All Labour Tools And Tackles Etc. All Complete Job. , Existing Ro Installed At Airport Campus-4 Nos. , Cost Towards Supply/Fixing Of Existing Ro- Ro Candle Set , Contractor Profit And Overhead Charges @ 14.95% Of Sl. No. 4.01 , Electric Run Submersible Pump Sets A Accessories Installed In Hydt At Airport Campus. , Supplying & Fitting Of 03 Hp, 3 Phase Submersible Pump Starter Having Suitable Contactor, Relay, On-Off Push Buttons, Voltmeter & Ampere Meter In Ss Enclosure, One Set Complete In Place Of Burnt Starter In Solar Inverter. Make-L&T/HavellS/Any Reputed Make Isi Mark. (For Hostel Building) , 32 annual periodical maintenance Tpn Main Switch L&T/HavellS/Hpl Any Reputed Isi Make HavellS/Any Reputed Make. , Supplying And Fitting Of 3 Core 4 Sq. Mm Flat Flexible Submersible Cable, Copper Conductor, Pvc Insulated And Pvc Sheathed As Per Is:7098. , Supply/Fixing Of 16 annual periodical maintenance Spn Mcb With Pvc Moulded Box Etc. L&T/HavellS/Hpl/ Any Reputed Isi Make. , Supplying & Fitting Of 02 Hp, 1-Phase Submersible Pump Starter Having Suitable Contactor, Relay, On-Off Push Buttons, Voltmeter & Ampere Meter In Ss Enclosure, One Set Complete In Place Of Burnt Starter In Solar Inverter. Make-L&T/HavelS/C&S Make Isi Mark. (For Hanger Building) , 18% Gst , 1% Labour Cess
BOQ
| Sl. No. | Item Description |
| 1 | Hostel Building at Air Port Campus Dumka |
| 2 | Cost towards S/F Polyethelene water storage tank of mark with cover and suitable locking system in triple layer confirming to IS:12701-1996 with Latest revision. |
| 3 | Cost towards dismantling, removing and bringing down existing 1500 Ltrs HDPE water tank including removal of damaged ball valve, tank connector and damaged pipe including supplying all materials, tools etc. all complete. |
| 4 | Supplying all materials labours tools and equipment for laying in of ISI mark UPVC Pipe with solvent cement including Cutting, jointing where necessary etc. all complete as per specification and direction of E/I. Make-Supreme/Asirwad/Astral/Reputed ISI Make.(i) 50 mm dia. UPVC pipe. |
| 5 | (ii) 32 mm dia UPVC pipe |
| 6 | (iii) 25mm dia. UPVC Pipe for over flow |
| 7 | Supplying all materials labours tools and equipment for fitting and fixing special type chrome plated UPVC fittings of approved make all complete as per specification and direction of the E/I. Make-Supreme/ Ashirwad/Astral/reputed ISI make for new water storage tank. (01 No).i. Union - 50 mm dia. UPVC. |
| 8 | ii. Tank connector-50 mm dia. UPVC. |
| 9 | iii. Tee-50 dia. UPVC. |
| 10 | iv. 50 mm dia. ball valve UPVC. |
| 11 | v. Elbow - 50 mm dia. UPVC. |
| 12 | vi. Plain Coupler-50 mm dia. UPVC. |
| 13 | vii. Elbow - 32 mm dia. UPVC. |
| 14 | viii. Plain Coupler-32mm dia. UPVC. |
| 15 | ix. 32 mm dia. ball valve UPVC. |
| 16 | Supplying all materials labours tools and equipment for laying in of ISI mark UPVC Pipe with solvent cement including Cutting, jointing where necessary etc. all complete as per specification and direction of E/I. Make-Supreme/Asirwad/Astral/Reputed ISI Make for existing & damaged water storage tank. (05 Nos.) including over flow.(i) 50 mm dia. UPVC pipe. |
| 17 | (ii) 32 mm dia. UPVC pipe |
| 18 | (iii) 25mm dia. UPVC Pipe for over flow |
| 19 | Supplying all materials labours tools and equipment for fitting and fixing special type chrome plated UPVC fittings of approved make all complete as per specification and direction of the E/I. Make-Supreme/ Ashirwad/ Astral/ reputed ISI make for old & existing water storage tank. (05 Nos.) Including over flow.i. Union - 50 mm dia. UPVC |
| 20 | ii. Tank connector-50 mm dia. UPVC |
| 21 | iii. Tee-50 dia. UPVC |
| 22 | iv. 50 mm dia. ball valve UPVC |
| 23 | v. Elbow - 50 mm dia. UPVC |
| 24 | vi. Plain Coupler-50 mm dia. UPVC |
| 25 | vii. Elbow - 32 mm dia. UPVC |
| 26 | viii. Plain Coupler-32mm dia. UPVC |
| 27 | ix. 32 mm dia. ball valve UPVC |
| 28 | x. 25mm dia. Coupler UPVC |
| 29 | xi. 25mm dia. Elbow UPVC |
| 30 | xii. 1500 Ltrs HDPE Tank lid cover. |
| 31 | Supply, installation, testing and commissioning of RO+UV based domestic water purifier of reputed make like Aquaguard (Eureka Forbes) / Kent / Pureit/Kinnova or equivalent, having following specifications:Purification Technology:RO + UVPurification Stages:Minimum 8–9 stage purification systemInput Water Quality:TDS handling capacity: up to 1500–2000 mg/lTurbidity: up to 15 NTUIron: up to 0.3 mg/lChlorine: up to 0.2 mg/lPurified Water Output:Minimum 9 LPH or higher (acceptable)Storage Capacity:Minimum 6–8 litresPower Requirement:220–230V AC, 50 HzBody Material:Food grade ABS / high-quality plastic, corrosion resistantAuto shut-off systemSuitable for municipal / borewell / tanker waterInstallation:Complete with all accessories, fittings, connection to storage/chiller if required. |
| 32 | Consumable for 1 year- RO candle set |
| 33 | Contractor profit and overhead charges @ 14.95% of Sl. No. 1.30 and 1.31 |
| 34 | Cost towards making of water connection point for water purifier system with supply and fitting of 1” dia. UPVC pipe 1” dia. UPVC/Steel ball valve, UPVC elbow, UPVC socket, UPVC solvent and Teflon tap and electric connection point for water purifier system with supply and fitting of 32Amp. Five pin socket with board, switches, wire, flat casing pipe as required at site with all labour tools and tackles etc. all complete job. In ground floor. |
| 35 | Cost towards making of water connection point for water purifier system with supply and fitting of 1” dia. UPVC pipe 1” dia. UPVC/Steel ball valve, UPVC elbow, UPVC socket, UPVC solvent and Teflon tap and cost towards making waste water outlet by wall cutting and electric connection point for water purifier system with supply and fitting of 32Amp. Five pin socket with board, switches, wire, flat casing pipe as required at site with all labour tools and tackles etc. all complete job. In 1st floor. |
| 36 | Hanger Building at Air Port Campus Dumka |
| 37 | Supply, installation, testing and commissioning of RO+UV based domestic water purifier of reputed make like Aquaguard (Eureka Forbes) / Kent / Pureit/Kinnova or equivalent, having following specifications:Purification Technology:RO + UVPurification Stages:Minimum 8–9 stage purification systemInput Water Quality:TDS handling capacity: up to 1500–2000 mg/lTurbidity: up to 15 NTUIron: up to 0.3 mg/lChlorine: up to 0.2 mg/lPurified Water Output:Minimum 9 LPH or higher (acceptable)Storage Capacity:Minimum 6–8 litresPower Requirement:220–230V AC, 50 HzBody Material:Food grade ABS / high-quality plastic, corrosion resistantAuto shut-off systemSuitable for municipal / borewell / tanker waterInstallation:Complete with all accessories, fittings, connection to storage/chiller if required. |
| 38 | Consumable for 1 year- RO candle set |
| 39 | Contractor profit and overhead charges @ 14.95% of Sl. No. 2.01 and 2.02 |
| 40 | Cost towards making of water connection point for water purifier system with supply and fitting of 1” dia. UPVC pipe 1” dia. UPVC/Steel ball valve, UPVC elbow, UPVC socket, UPVC solvent and Teflon tap and electric connection point for water purifier system with supply and fitting of 32Amp. Five pin socket with board, switches, wire, flat casing pipe as required at site with all labour tools and tackles etc. all complete job. |
| 41 | Supplying all materials labours tools and equipment for fitting and fixing special type chrome plated UPVC fittings of approved make all complete as per specification and direction of the E/I. Make-Supreme/ Ashirwad/ Astral/ reputed ISI make for old water storage tank (02 Nos.) including over flow.i. 1500 Ltrs HDPE Tank lid cover. |
| 42 | ii. 25mm dia UPVC pipe for over flow. |
| 43 | iii. Plain Coupler-25mm dia UPVC |
| 44 | Administrative Building at Air Port Campus Dumka |
| 45 | Cost towards S/F Polyethelene water storage tank of mark with cover and suitable locking system in two layer confirming to IS:12701-1996 with Latest revision. (2 Nos.) |
| 46 | Cost towards dismantling, removing and bringing down existing 1000 Ltrs HDPE water tank including removal of damaged ball valve, tank connector and damaged pipe including supplying all materials, tools etc. all complete. |
| 47 | Supplying all materials labours tools and equipment for laying in of ISI mark UPVC Pipe with solvent cement including Cutting, jointing where necessary etc. all complete as per specification and direction of E/I. Make-Supreme/Asirwad/Astral/Reputed ISI Make.(i) 50 mm dia. UPVC pipe. |
| 48 | (ii) 32 mm dia UPVC pipe |
| 49 | (iii) 25mm dia. UPVC Pipe for over flow |
| 50 | Supplying all materials labours tools and equipment for fitting and fixing special type chrome plated UPVC fittings of approved make all complete as per specification and direction of the E/I. Make-Supreme/ Ashirwad/Astral/reputed ISI make for new water storage tank. (01 No).i. Union - 50 mm dia. UPVC |
| 51 | ii. Tank connector-50 mm dia. UPVC |
| 52 | iii. Tee-50 dia. UPVC |
| 53 | iv. 50 mm dia. ball valve UPVC |
| 54 | v. Elbow - 50 mm dia. UPVC |
| 55 | vi. Plain Coupler-50 mm dia. UPVC |
| 56 | vii. Elbow - 32 mm dia. UPVC |
| 57 | viii. Plain Coupler-32mm dia. UPVC |
| 58 | ix. 32 mm dia. ball valve UPVC |
| 59 | Supplying all materials labours tools and equipment for laying in of ISI mark UPVC Pipe with solvent cement including Cutting, jointing where necessary etc. all complete as per specification and direction of E/I. Make-Supreme/Asirwad/Astral/Reputed ISI Make for new connection of garden.(i) 50 mm dia. UPVC pipe. |
| 60 | (ii) 32 mm dia. UPVC pipe |
| 61 | (iii) 25mm dia. UPVC Pipe for over flow |
| 62 | Supplying all materials labours tools and equipment for fitting and fixing special type chrome plated UPVC fittings of approved make all complete as per specification and direction of the E/I. Make-Supreme/ Ashirwad/ Astral/ reputed ISI make for old & existing water storage tank (05 Nos.) including over flow.i. Brass garden bibcock |
| 63 | ii. G.I. Nipple- 25mm dia. |
| 64 | iii. Tee-50 dia. UPVC |
| 65 | iv. 50 mm dia. ball valve UPVC |
| 66 | v. Elbow - 50 mm dia. UPVC |
| 67 | vi. Plain Coupler-50 mm dia. UPVC |
| 68 | vii. Elbow - 32 mm dia. UPVC |
| 69 | viii. Plain Coupler-32mm dia. UPVC |
| 70 | ix. 32 mm dia. ball valve UPVC |
| 71 | x. 25mm dia. Coupler UPVC |
| 72 | xi. 25mm dia. Elbow UPVC |
| 73 | Earth work in excavation (As per I.S. 3114) 1965 for laying of different type and sizes of pipe so as to give one meter average cover over the socket of pipe with disposal of excavated earth within initial lead and lift as per specification & direction E/I.UPVC Pipe 32mm -6.66m3UPVC Pipe 25mm-2.18m390% of Total (as per Soil item Class \\"A\\") |
| 74 | 10% of Total (as per Soil item Class \\"B\\") |
| 75 | Earth work in back filling in the trenches after laying different sizes of pipe with earth removed during excavation lead & left as per specification & direction of E/I. |
| 76 | Supply, installation, testing and commissioning of RO+UV based domestic water purifier of reputed make like Aquaguard (Eureka Forbes) / Kent / Pureit/Kinnova or equivalent, having following specifications:Purification Technology:RO + UVPurification Stages:Minimum 8–9 stage purification systemInput Water Quality:TDS handling capacity: up to 1500–2000 mg/lTurbidity: up to 15 NTUIron: up to 0.3 mg/lChlorine: up to 0.2 mg/lPurified Water Output:Minimum 9 LPH or higher (acceptable)Storage Capacity:Minimum 6–8 litresPower Requirement:220–230V AC, 50 HzBody Material:Food grade ABS / high-quality plastic, corrosion resistantAuto shut-off systemSuitable for municipal / borewell / tanker waterInstallation:Complete with all accessories, fittings, connection to storage/chiller if required |
| 77 | Consumable for 1 year- RO candle set |
| 78 | Contractor profit and overhead charges @ 14.95% of Sl. No. 3.32 and 3.33 |
| 79 | Cost towards making of water connection point for water purifier system with supply and fitting of 1” dia. UPVC pipe 1” dia. UPVC/Steel ball valve, UPVC elbow, UPVC socket, UPVC solvent and Teflon tap and electric connection point for water purifier system with supply and fitting of 32Amp. Five pin socket with board, switches, wire, flat casing pipe as required at site with all labour tools and tackles etc. all complete job. |
| 80 | Existing RO installed at Airport Campus-4 Nos. |
| 81 | Cost towards S/F of Existing RO- RO Candle set |
| 82 | Contractor profit and overhead charges @ 14.95% of Sl. No. 4.01 |
| 83 | Electric run Submersible pump sets a accessories installed in HYDT at Airport Campus. |
| 84 | Supplying & fitting of 03 HP, 3 phase submersible pump starter having suitable contactor, relay, on-off push buttons, Voltmeter & ampere meter in SS enclosure, one set complete in place of burnt starter in solar inverter.Make-L&T/Havell’s/any reputed make ISI mark. (For Hostel Building) |
| 85 | 32 Amp TPN main switch L&T/Havell’s/HPL any reputed ISI make Havell’s/any reputed make. |
| 86 | Supplying and fitting of 3 core 4 sq. mm flat flexible submersible cable, copper conductor, PVC insulated and PVC sheathed as per IS:7098. |
| 87 | S/F of 16 Amp SPN MCB with PVC moulded Box etc. L&T/Havell’s/HPL/ any reputed ISI make. |
| 88 | Supplying & fitting of 02 HP, 1-phase submersible pump starter having suitable contactor, relay, on-off push buttons, Voltmeter & ampere meter in SS enclosure, one set complete in place of burnt starter in solar inverter.Make-L&T/Havel’s/C&S make ISI mark.(For Hanger Building) |
| 89 | 18% GST |
| 90 | 1% Labour Cess Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender