Agriculture Cooperative Closing in 10 days TDR #56278977

Bids Are invited for Clarification And Evaporator Fabrication Works

Issued by Cooperative · Saharanpur, Uttar Pradesh
Tender Value
14.55 Lakhs
Estimated cost
Bid Submission
18 Jul 2026
10 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Saharanpur → Uttar Pradesh
EMD Exemption
Not Available
Quantity
6469

Project Description

Bids Are invited for Clarification And Evaporator Fabrication Works Removing The Calandria Of The Evaporator And Installing And Fitting A New Calandria Of 650 M Square Heating Surface And Installing All The Pipe Lines Valves And Accessories In Their Place - Clarification And Evaporator , Replacing An Old And Worn Out Grand Consultant Juice Plaza Condensate Syrup Bottle With An 8 10 Mm Msc Plate By Connecting All Connections. - Clarification And Evaporator , The Worn Out Umbrella Plate In The Vapor Cell Semi Concentrator Was Removed And The Plate Was Repaired And Replaced With Plastic - Clarification And Evaporator , Replacing The Umbrella In The Wide Body Vapor Cell Semi Concentrator With A Dated And 6 8 Mm Msc Plate And Conducting A Trial. - Clarification And Evaporator , Removing The Neck Selvage Of The Quad Body Semi Container And Replacing It With A New 8 10 Mm Ms Plate And Testing It. - Clarification And Evaporator , Removing The Neck Selvage Of The Quad Body Semi Container And Repairing It With The Provided Plate And Testing It. - Clarification And Evaporator , Cutting Out The Weakened Roof Of The Quad Body And Replacing It With A 12Mm Plate Provided And Testing It. - Clarification And Evaporator , Cutting Out The Weakened Part Of The Semi Capacitor Vapor Cell Quad Body Cell And Replacing It With A 10 12Mm Plate Provided And Testing It For A Satisfactory Leak Proofing Test. - Clarification And Evaporator , Removal Of The Weak Part Of The Exhaust Pipeline Going To The Semi Condenser Vapor Shell And Fitting A New 800 Mm Diameter Pipeline Using The Provided 8 10 Mm Plate In Its Place. - Clarification And Evaporator , Cutting Out The Worn Partition Plates Of The Top And Bottom Headers Of The Juice Heater And Replacing Them With The Provided 8 10 Mm Plate Arranging For Fitting The Rubber Strip - Clarification And Evaporator , Installing And Strengthening The Umbrella Fitted To The Vapor Shell Semiconductor Quad Body And Conducting A Satisfactory Trial. - Clarification And Evaporator , Removing The Weak Intermediate First Vapor Second Vapor Pipes Of The Quad Bodies And Constructing New Ones With A Diameter Of 500 650 Mm Using An 8 10 Mm Plate And Conducting A Satisfactory Trial. - Clarification And Evaporator , Removing The Weakened Intermediate First Vapor Second Vapor Pipes Of The Quad Bodies And Installing New Ones With A Diameter Of 700 850 Mm From 8 10 Mm Plates And Conducting A Satisfactory Trial. - Clarification And Evaporator , Dismantle Fabricate And Erect A 600 800 Mm Band And Conduct A Satisfactory Trial. - Clarification And Evaporator , Dismantle Fabricate And Erect A 900 1100 Mm Band And Conduct A Satisfactory Trial. - Clarification And Evaporator , Remove The Steam Valve From The Juice Heater And Install A New Right Angle Valve Size 400 500 Mm With The Corresponding Pipe Connection Modifications And Conduct A Trial. - Clarification And Evaporator , Cut And Remove The Double Beat Valve From The Juice Heater And Install A New Double Beat Valve Size 8 Diameter And Conduct A Trial - Clarification And Evaporator , Remove The Intermediate Coolers From The Film Type Sulfur Furnaces And Install Them Using The Provided Pipe Plate And Conduct A Trial. - Clarification And Evaporator , Install The Sublimation Pipes From The Satvik Type Sulfur Furnaces Using The Provided Pipe Or A New One And Conduct A Trial. - Clarification And Evaporator , Remove The Empty Filtrate Bottle From The Vacuum Filter And Install A New Filtrate Bottle Using An 8 10 Mm Ms Plate And Conduct A Trial. Make All Connections And Conduct A Trial. - Clarification And Evaporator , Removing The Filtrate Bottle Plate Of The Vacuum Filter And Repairing It With The Provided Plate And Giving It A Trial. - Clarification And Evaporator , Removing The Filtrate Plate Of The Vacuum Filter Tray And Repairing It With The Provided Plate. - Clarification And Evaporator , Cutting And Removing The Neck Shell Of The Lime Slaker At The Lime Station And Replacing It With A New One Using The Provided Plate And Giving It A Trial. - Clarification And Evaporator , Creating The Melter From The Satvik Sulfur Furnace With A New 8 10 Mm Plate And Giving It A Satisfactory Trial By Installing The Steam Coil. - Clarification And Evaporator , Removing The Worn Out Coils In The Melters Of The Satvik Sulfur Furnace Replacing Them With New Ones And Conducting Hydraulic Testing And Giving A Satisfactory Trial. - Clarification And Evaporator , Removing The Worn Out Plates Of The Vacuum Filter Condensers Replacing Them With New Ones And Giving A Satisfactory Trial - Clarification And Evaporator , Removing The Damaged Weak Steam Coils In The Film Tine Sulfur Melters Replacing Them With New Ones And Conducting Hydraulic Testing And Giving A Satisfactory Trial - Clarification And Evaporator , Renovate And Install A New So2 Chamber Inside The Coolers Of The Satvik Sulfur Furnace And Conduct A Trial. - Clarification And Evaporator , Remove The Old Corroded So2 Gas Line At The Sulfur Furnace Station And Install The New Seamless Ms Line With Flanges Tightening The Joints And Bolts - Clarification And Evaporator , Remove The Grooved Plate Of The Mud Mixture On The Vacuum Filter And Repair It With The New Plate Provided - Clarification And Evaporator , Remove The Grooved Plate Of The Filtrate Tank Located Below The Vacuum Filter Install The Plate Provided And Perform A Trial. - Clarification And Evaporator , Repairing The Weak Parts Of Juice And Mud With Dry Box Of Clarifier And Making All The Connections. - Clarification And Evaporator , Patch The Weak Shell Of The Burning Chamber Of The Film Type Sulfur Furnace With The Plate Provided For A Length Of Approximately 5 Feet From The Bottom And Give A Satisfactory Trial. - Clarification And Evaporator , Patch The Weak And Rotten Platforms Of Both Vacuum Filters With A New Burner From The Provided Plate. - Clarification And Evaporator , Removing The So2 Chamber Inside The Last Cooler Of The Film Type Sulfur Furnace And Installing A New One Using The Provided 10 Mm Ms Plate And Making All Connections. - Clarification And Evaporator , Repairing The Damaged Clear Juice Bottles Near The Clear Juice Pumps And Making All The Connections And Giving Satisfactory Trial. - Clarification And Evaporator , Cut Out And Remove All Rotten Mud Scrapers Inside The Door Clarifier And Install The Provided Plates And Belts According To Size And Give A Satisfactory Trial. - Clarification And Evaporator , Coat And Remove The Weak Mud Boot Plates In Each Compartment Of The Clarifier And Install The Provided New Plates. - Clarification And Evaporator , Repairing The Weak Parts Of The Agitator Fitted On The Vacuum Filter And Giving Satisfactory Trial. - Clarification And Evaporator , Removing The Screw Conveyor That Had Been Skewed Inside The Mud Mixture And Installing A New One Using The Provided New Plate And Pipe And Giving It A Trial. - Clarification And Evaporator , Cutting Out All The Worn Out Weak Cooling Pipes And Flanges Of The Coolers Of The Satvik Sulphur Furnace And Installing New Flanges And Cooling Pipes Using The Provided Pipe Lines And Plates - Clarification And Evaporator , Cutting Out The Worn Out Weak Flanges Of The Coolers Of The Sulphur Furnace And Installing New Flanges Using The Provided Plate And Giving It A Satisfactory Trial By Welding Dia 1200 Ms - Clarification And Evaporator , Cut And Remove The Weak Corroded Cross In The Gas Pipeline At The Sulphur Furnace Station And Install The Cross By Making A New Flange From The Provided Ms Pipeline And Plate - Clarification And Evaporator , Cut And Remove The Weak Corroded Header Of The Sulphur Furnace And Install It From The Provided Plate And Pipeline And Connect The Nipples And Give A Satisfactory Trial. - Clarification And Evaporator , Repairing The Bagasse Line Leading To The Mill Installed Above The Vacuum Filter Station In The Boiling House And Conducting A Satisfactory Trial. - Clarification And Evaporator , Remove The Brass Ss Tubes From The Quad And Store Them. - Clarification And Evaporator , Install The New Brass Ss Tubes Provided By The Mill Committee In The Calandria Expand Them And Conduct Hydraulic Testing Of The Calandria At A Pressure Of 4 Kg Cm2 And Give A Satisfactory Trial - Clarification And Evaporator , A Dismantling Old Columns Beam Channels Etc. B Manufacturing And Installing New Columns Beam Channels Etc. - Clarification And Evaporator , Removing The Old Corroded Platform And Replacing It With A New One - Clarification And Evaporator , Installing 16 Inch 18 Inch Manholes With Blinds. - Clarification And Evaporator , Constructing A Bed For The Pump Fitting The Pump And Motor And Conducting A Trial Run Of Up To 20 Hp. - Clarification And Evaporator , Dismantling Fabricating And Erecting Weak Corroded Pipe Lines Up To 12 And Providing Satisfactory Leak Proof Trials. - Clarification And Evaporator , Dismantling Fabricating And Erecting Weak Corroded Tees Up To 12 And Providing Satisfactory Leak Proof Trials. - Clarification And Evaporator , Dismantling Fabricating And Erecting Weak Corroded Nipples Up To 12 And Providing Satisfactory Leak Proof Trials. - Clarification And Evaporator , Dismantling Fabricating And Erecting A Weak Throated Cross Member Up To 12 And Providing Satisfactory Leak Proof Trials. - Clarification And Evaporator , Dismantling Fabricating And Erecting A Weak Throated Band Up To 12 And Providing Satisfactory Leak Proof Trials. - Clarification And Evaporator , Dismantling Fabricating And Erecting A Weak Throated Flange Up To 12 And Providing Satisfactory Leak Proof Trials. - Clarification And Evaporator , Dismantling Fabricating And Erecting A Weak Sloping Reducer Up To 12 And Providing A Satisfactory Leak Proof Trial. - Clarification And Evaporator Total Quantity : 6469

BOQ

Sl. No. Item TitleItem Description
1Removing the calandria of the Evaporator and installing and fitting a new calandria of 650 m square heating surface and installing all the pipe lines valves and accessories in their placeClarification and evaporator
2Replacing an old and worn out Grand Consultant Juice Plaza condensate syrup bottle with an 8 10 mm MSC plate by connecting all connections.Clarification and evaporator
3The worn out umbrella plate in the Vapor Cell Semi Concentrator was removed and the plate was repaired and replaced with plasticClarification and evaporator
4Replacing the umbrella in the Wide Body Vapor Cell Semi Concentrator with a dated and 6 8 mm MSC plate and conducting a trial.Clarification and evaporator
5Removing the neck selvage of the quad body semi container and replacing it with a new 8 10 mm MS plate and testing it.Clarification and evaporator
6Removing the neck selvage of the quad body semi container and repairing it with the provided plate and testing it.Clarification and evaporator
7Cutting out the weakened roof of the quad body and replacing it with a 12mm plate provided and testing it.Clarification and evaporator
8Cutting out the weakened part of the semi capacitor vapor cell quad body cell and replacing it with a 10 12mm plate provided and testing it for a satisfactory leak proofing test.Clarification and evaporator
9Removal of the weak part of the exhaust pipeline going to the semi condenser vapor shell and fitting a new 800 mm diameter pipeline using the provided 8 10 mm plate in its place.Clarification and evaporator
10Cutting out the worn partition plates of the top and bottom headers of the juice heater and replacing them with the provided 8 10 mm plate arranging for fitting the rubber stripClarification and evaporator
11Installing and strengthening the umbrella fitted to the vapor shell semiconductor quad body and conducting a satisfactory trial.Clarification and evaporator
12Removing the weak intermediate first vapor second vapor pipes of the quad bodies and constructing new ones with a diameter of 500 650 mm using an 8 10 mm plate and conducting a satisfactory trial.Clarification and evaporator
13Removing the weakened intermediate first vapor second vapor pipes of the quad bodies and installing new ones with a diameter of 700 850 mm from 8 10 mm plates and conducting a satisfactory trial.Clarification and evaporator
14Dismantle fabricate and erect a 600 800 mm band and conduct a satisfactory trial.Clarification and evaporator
15Dismantle fabricate and erect a 900 1100 mm band and conduct a satisfactory trial.Clarification and evaporator
16Remove the steam valve from the juice heater and install a new right angle valve size 400 500 mm with the corresponding pipe connection modifications and conduct a trial.Clarification and evaporator
17Cut and remove the double beat valve from the juice heater and install a new double beat valve size 8 diameter and conduct a trialClarification and evaporator
18Remove the intermediate coolers from the film type sulfur furnaces and install them using the provided pipe plate and conduct a trial.Clarification and evaporator
19Install the sublimation pipes from the Satvik type sulfur furnaces using the provided pipe or a new one and conduct a trial.Clarification and evaporator
20Remove the empty filtrate bottle from the vacuum filter and install a new filtrate bottle using an 8 10 mm MS plate and conduct a trial. Make all connections and conduct a trial.Clarification and evaporator
21Removing the filtrate bottle plate of the vacuum filter and repairing it with the provided plate and giving it a trial.Clarification and evaporator
22Removing the filtrate plate of the vacuum filter tray and repairing it with the provided plate.Clarification and evaporator
23Cutting and removing the neck shell of the lime slaker at the lime station and replacing it with a new one using the provided plate and giving it a trial.Clarification and evaporator
24Creating the melter from the Satvik Sulfur Furnace with a new 8 10 mm plate and giving it a satisfactory trial by installing the steam coil.Clarification and evaporator
25Removing the worn out coils in the melters of the Satvik Sulfur Furnace replacing them with new ones and conducting hydraulic testing and giving a satisfactory trial.Clarification and evaporator
26Removing the worn out plates of the vacuum filter condensers replacing them with new ones and giving a satisfactory trialClarification and evaporator
27Removing the damaged weak steam coils in the film tine sulfur melters replacing them with new ones and conducting hydraulic testing and giving a satisfactory trialClarification and evaporator
28Renovate and install a new SO2 chamber inside the coolers of the Satvik Sulfur Furnace and conduct a trial.Clarification and evaporator
29Remove the old corroded SO2 gas line at the sulfur furnace station and install the new seamless MS line with flanges tightening the joints and boltsClarification and evaporator
30Remove the grooved plate of the mud mixture on the vacuum filter and repair it with the new plate providedClarification and evaporator
31Remove the grooved plate of the filtrate tank located below the vacuum filter install the plate provided and perform a trial.Clarification and evaporator
32Repairing the weak parts of juice and mud with dry box of clarifier and making all the connections.Clarification and evaporator
33Patch the weak shell of the burning chamber of the film type sulfur furnace with the plate provided for a length of approximately 5 feet from the bottom and give a satisfactory trial.Clarification and evaporator
34Patch the weak and rotten platforms of both vacuum filters with a new burner from the provided plate.Clarification and evaporator
35Removing the SO2 chamber inside the last cooler of the film type sulfur furnace and installing a new one using the provided 10 mm MS plate and making all connections.Clarification and evaporator
36Repairing the damaged clear juice bottles near the clear juice pumps and making all the connections and giving satisfactory trial.Clarification and evaporator
37Cut out and remove all rotten mud scrapers inside the door clarifier and install the provided plates and belts according to size and give a satisfactory trial.Clarification and evaporator
38Coat and remove the weak mud boot plates in each compartment of the clarifier and install the provided new plates.Clarification and evaporator
39Repairing the weak parts of the agitator fitted on the vacuum filter and giving satisfactory trial.Clarification and evaporator
40Removing the screw conveyor that had been skewed inside the mud mixture and installing a new one using the provided new plate and pipe and giving it a trial.Clarification and evaporator
41Cutting out all the worn out weak cooling pipes and flanges of the coolers of the Satvik Sulphur Furnace and installing new flanges and cooling pipes using the provided pipe lines and platesClarification and evaporator
42Cutting out the worn out weak flanges of the coolers of the Sulphur Furnace and installing new flanges using the provided plate and giving it a satisfactory trial by welding Dia 1200 MSClarification and evaporator
43Cut and remove the weak corroded cross in the gas pipeline at the Sulphur Furnace Station and install the cross by making a new flange from the provided MS pipeline and plateClarification and evaporator
44Cut and remove the weak corroded header of the Sulphur Furnace and install it from the provided plate and pipeline and connect the nipples and give a satisfactory trial.Clarification and evaporator
45Repairing the bagasse line leading to the mill installed above the vacuum filter station in the boiling house and conducting a satisfactory trial.Clarification and evaporator
46Remove the brass SS tubes from the quad and store them.Clarification and evaporator
47Install the new brass SS tubes provided by the mill committee in the calandria expand them and conduct hydraulic testing of the calandria at a pressure of 4 kg cm2 and give a satisfactory trialClarification and evaporator
48a Dismantling old columns beam channels etc. b Manufacturing and installing new columns beam channels etc.Clarification and evaporator
49Removing the old corroded platform and replacing it with a new oneClarification and evaporator
50Installing 16 inch 18 inch manholes with blinds.Clarification and evaporator
51Constructing a bed for the pump fitting the pump and motor and conducting a trial run of up to 20 HP.Clarification and evaporator
52Dismantling fabricating and erecting weak corroded pipe lines up to 12 and providing satisfactory leak proof trials.Clarification and evaporator
53Dismantling fabricating and erecting weak corroded tees up to 12 and providing satisfactory leak proof trials.Clarification and evaporator
54Dismantling fabricating and erecting weak corroded nipples up to 12 and providing satisfactory leak proof trials.Clarification and evaporator
55Dismantling fabricating and erecting a weak throated cross member up to 12 and providing satisfactory leak proof trials.Clarification and evaporator
56Dismantling fabricating and erecting a weak throated band up to 12 and providing satisfactory leak proof trials.Clarification and evaporator
57Dismantling fabricating and erecting a weak throated flange up to 12 and providing satisfactory leak proof trials.Clarification and evaporator
58Dismantling fabricating and erecting a weak sloping reducer up to 12 and providing a satisfactory leak proof trial.Clarification and evaporator

AI Tender Summary

OUR REF NO 56278977
AUTHORITY Cooperative
TENDER VALUE 14.55 Lakhs
LAST DATE 18-07-2026
Authority
Authority Name Uttar Pradesh Cooperative Sugar Factories Federation Limited
Work Description Bids Are invited for Clarification And Evaporator Fabrication Works Removing The Calandria Of The Evaporator And Installing And Fitting A New Calandria Of 650 M Square Heating Surface And Installing All The Pipe Lines Valves And Accessories In Their Place - Clarification And Evaporator , Replacing An Old And Worn Out Grand Consultant Juice Plaza Condensate Syrup Bottle With An 8 10 Mm Msc Plate By Connecting All Connections. - Clarification And Evaporator , The Worn Out Umbrella Plate In The Vapor Cell Semi Concentrator Was Removed And The Plate Was Repaired And Replaced With Plastic - Clarification And Evaporator , Replacing The Umbrella In The Wide Body Vapor Cell Semi Concentrator With A Dated And 6 8 Mm Msc Plate And Conducting A Trial. - Clarification And Evaporator , Removing The Neck Selvage Of The Quad Body Semi Container And Replacing It With A New 8 10 Mm Ms Plate And Testing It. - Clarification And Evaporator , Removing The Neck Selvage Of The Quad Body Semi Container And Repairing It With The Provided Plate And Testing It. - Clarification And Evaporator , Cutting Out The Weakened Roof Of The Quad Body And Replacing It With A 12Mm Plate Provided And Testing It. - Clarification And Evaporator , Cutting Out The Weakened Part Of The Semi Capacitor Vapor Cell Quad Body Cell And Replacing It With A 10 12Mm Plate Provided And Testing It For A Satisfactory Leak Proofing Test. - Clarification And Evaporator , Removal Of The Weak Part Of The Exhaust Pipeline Going To The Semi Condenser Vapor Shell And Fitting A New 800 Mm Diameter Pipeline Using The Provided 8 10 Mm Plate In Its Place. - Clarification And Evaporator , Cutting Out The Worn Partition Plates Of The Top And Bottom Headers Of The Juice Heater And Replacing Them With The Provided 8 10 Mm Plate Arranging For Fitting The Rubber Strip - Clarification And Evaporator , Installing And Strengthening The Umbrella Fitted To The Vapor Shell Semiconductor Quad Body And Conducting A Satisfactory Trial. - Clarification And Evaporator , Removing The Weak Intermediate First Vapor Second Vapor Pipes Of The Quad Bodies And Constructing New Ones With A Diameter Of 500 650 Mm Using An 8 10 Mm Plate And Conducting A Satisfactory Trial. - Clarification And Evaporator , Removing The Weakened Intermediate First Vapor Second Vapor Pipes Of The Quad Bodies And Installing New Ones With A Diameter Of 700 850 Mm From 8 10 Mm Plates And Conducting A Satisfactory Trial. - Clarification And Evaporator , Dismantle Fabricate And Erect A 600 800 Mm Band And Conduct A Satisfactory Trial. - Clarification And Evaporator , Dismantle Fabricate And Erect A 900 1100 Mm Band And Conduct A Satisfactory Trial. - Clarification And Evaporator , Remove The Steam Valve From The Juice Heater And Install A New Right Angle Valve Size 400 500 Mm With The Corresponding Pipe Connection Modifications And Conduct A Trial. - Clarification And Evaporator , Cut And Remove The Double Beat Valve From The Juice Heater And Install A New Double Beat Valve Size 8 Diameter And Conduct A Trial - Clarification And Evaporator , Remove The Intermediate Coolers From The Film Type Sulfur Furnaces And Install Them Using The Provided Pipe Plate And Conduct A Trial. - Clarification And Evaporator , Install The Sublimation Pipes From The Satvik Type Sulfur Furnaces Using The Provided Pipe Or A New One And Conduct A Trial. - Clarification And Evaporator , Remove The Empty Filtrate Bottle From The Vacuum Filter And Install A New Filtrate Bottle Using An 8 10 Mm Ms Plate And Conduct A Trial. Make All Connections And Conduct A Trial. - Clarification And Evaporator , Removing The Filtrate Bottle Plate Of The Vacuum Filter And Repairing It With The Provided Plate And Giving It A Trial. - Clarification And Evaporator , Removing The Filtrate Plate Of The Vacuum Filter Tray And Repairing It With The Provided Plate. - Clarification And Evaporator , Cutting And Removing The Neck Shell Of The Lime Slaker At The Lime Station And Replacing It With A New One Using The Provided Plate And Giving It A Trial. - Clarification And Evaporator , Creating The Melter From The Satvik Sulfur Furnace With A New 8 10 Mm Plate And Giving It A Satisfactory Trial By Installing The Steam Coil. - Clarification And Evaporator , Removing The Worn Out Coils In The Melters Of The Satvik Sulfur Furnace Replacing Them With New Ones And Conducting Hydraulic Testing And Giving A Satisfactory Trial. - Clarification And Evaporator , Removing The Worn Out Plates Of The Vacuum Filter Condensers Replacing Them With New Ones And Giving A Satisfactory Trial - Clarification And Evaporator , Removing The Damaged Weak Steam Coils In The Film Tine Sulfur Melters Replacing Them With New Ones And Conducting Hydraulic Testing And Giving A Satisfactory Trial - Clarification And Evaporator , Renovate And Install A New So2 Chamber Inside The Coolers Of The Satvik Sulfur Furnace And Conduct A Trial. - Clarification And Evaporator , Remove The Old Corroded So2 Gas Line At The Sulfur Furnace Station And Install The New Seamless Ms Line With Flanges Tightening The Joints And Bolts - Clarification And Evaporator , Remove The Grooved Plate Of The Mud Mixture On The Vacuum Filter And Repair It With The New Plate Provided - Clarification And Evaporator , Remove The Grooved Plate Of The Filtrate Tank Located Below The Vacuum Filter Install The Plate Provided And Perform A Trial. - Clarification And Evaporator , Repairing The Weak Parts Of Juice And Mud With Dry Box Of Clarifier And Making All The Connections. - Clarification And Evaporator , Patch The Weak Shell Of The Burning Chamber Of The Film Type Sulfur Furnace With The Plate Provided For A Length Of Approximately 5 Feet From The Bottom And Give A Satisfactory Trial. - Clarification And Evaporator , Patch The Weak And Rotten Platforms Of Both Vacuum Filters With A New Burner From The Provided Plate. - Clarification And Evaporator , Removing The So2 Chamber Inside The Last Cooler Of The Film Type Sulfur Furnace And Installing A New One Using The Provided 10 Mm Ms Plate And Making All Connections. - Clarification And Evaporator , Repairing The Damaged Clear Juice Bottles Near The Clear Juice Pumps And Making All The Connections And Giving Satisfactory Trial. - Clarification And Evaporator , Cut Out And Remove All Rotten Mud Scrapers Inside The Door Clarifier And Install The Provided Plates And Belts According To Size And Give A Satisfactory Trial. - Clarification And Evaporator , Coat And Remove The Weak Mud Boot Plates In Each Compartment Of The Clarifier And Install The Provided New Plates. - Clarification And Evaporator , Repairing The Weak Parts Of The Agitator Fitted On The Vacuum Filter And Giving Satisfactory Trial. - Clarification And Evaporator , Removing The Screw Conveyor That Had Been Skewed Inside The Mud Mixture And Installing A New One Using The Provided New Plate And Pipe And Giving It A Trial. - Clarification And Evaporator , Cutting Out All The Worn Out Weak Cooling Pipes And Flanges Of The Coolers Of The Satvik Sulphur Furnace And Installing New Flanges And Cooling Pipes Using The Provided Pipe Lines And Plates - Clarification And Evaporator , Cutting Out The Worn Out Weak Flanges Of The Coolers Of The Sulphur Furnace And Installing New Flanges Using The Provided Plate And Giving It A Satisfactory Trial By Welding Dia 1200 Ms - Clarification And Evaporator , Cut And Remove The Weak Corroded Cross In The Gas Pipeline At The Sulphur Furnace Station And Install The Cross By Making A New Flange From The Provided Ms Pipeline And Plate - Clarification And Evaporator , Cut And Remove The Weak Corroded Header Of The Sulphur Furnace And Install It From The Provided Plate And Pipeline And Connect The Nipples And Give A Satisfactory Trial. - Clarification And Evaporator , Repairing The Bagasse Line Leading To The Mill Installed Above The Vacuum Filter Station In The Boiling House And Conducting A Satisfactory Trial. - Clarification And Evaporator , Remove The Brass Ss Tubes From The Quad And Store Them. - Clarification And Evaporator , Install The New Brass Ss Tubes Provided By The Mill Committee In The Calandria Expand Them And Conduct Hydraulic Testing Of The Calandria At A Pressure Of 4 Kg Cm2 And Give A Satisfactory Trial - Clarification And Evaporator , A Dismantling Old Columns Beam Channels Etc. B Manufacturing And Installing New Columns Beam Channels Etc. - Clarification And Evaporator , Removing The Old Corroded Platform And Replacing It With A New One - Clarification And Evaporator , Installing 16 Inch 18 Inch Manholes With Blinds. - Clarification And Evaporator , Constructing A Bed For The Pump Fitting The Pump And Motor And Conducting A Trial Run Of Up To 20 Hp. - Clarification And Evaporator , Dismantling Fabricating And Erecting Weak Corroded Pipe Lines Up To 12 And Providing Satisfactory Leak Proof Trials. - Clarification And Evaporator , Dismantling Fabricating And Erecting Weak Corroded Tees Up To 12 And Providing Satisfactory Leak Proof Trials. - Clarification And Evaporator , Dismantling Fabricating And Erecting Weak Corroded Nipples Up To 12 And Providing Satisfactory Leak Proof Trials. - Clarification And Evaporator , Dismantling Fabricating And Erecting A Weak Throated Cross Member Up To 12 And Providing Satisfactory Leak Proof Trials. - Clarification And Evaporator , Dismantling Fabricating And Erecting A Weak Throated Band Up To 12 And Providing Satisfactory Leak Proof Trials. - Clarification And Evaporator , Dismantling Fabricating And Erecting A Weak Throated Flange Up To 12 And Providing Satisfactory Leak Proof Trials. - Clarification And Evaporator , Dismantling Fabricating And Erecting A Weak Sloping Reducer Up To 12 And Providing A Satisfactory Leak Proof Trial. - Clarification And Evaporator Total Quantity : 6469
Basic Detail
Tender No GEM/2026/B/7718994
Bidding Type Tender
Location
City Saharanpur
State Uttar Pradesh
Key Dates
Publish Date 03 Jul 2026
Submission Date 18 Jul 2026
Open Date 18 Jul 2026
Finance
Tender Value 14.55 Lakhs
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
f7613914-c7fb-4eee-85ec-50f03f5a2631.pdf
1782576300.xlsx
9529487_Boq_1.xlsx
sanction_2026-06-27-21-22-52_c31b8e65f402b59c2369d093df8e774f.pdf
sanction_9307a190-d50e-47d6-800e1782576441657_karanrathi.ssw.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 03, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 18, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 10 days
Jul 18, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 10 days

Tender Documents

Download All (ZIP) ↓
pdf

f7613914-c7fb-4eee-85ec-50f03f5a2631.pdf

xlsx

1782576300.xlsx

xlsx

9529487_Boq_1.xlsx

pdf

sanction_2026-06-27-21-22-52_c31b8e65f402b59c2369d093df8e774f.pdf

ssw

sanction_9307a190-d50e-47d6-800e1782576441657_karanrathi.ssw.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders