Power Government Departments Closing in 9 days TDR #56278588

Bids Are invited for Upgradation Of Existing Sas

Issued by Government Departments · Kurnool, Andhra Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
13 Jul 2026
9 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Kurnool → Andhra Pradesh
EMD Exemption
Not Available
Quantity
177

Project Description

Bids Are invited for Upgradation Of Existing Sas Upgradation Of Existing Sas At Kurnool Ss- Supply Portion - Supply Of Industrial Grade Pc With Latest Operating System (Windows 11) With 7 Years Support And With Pc Specifications As Mentioned In Scope Of Worki Server- 02 Nos Ii Client- 02 Nos Iii Gateway- 02 Nos Iv Dr-Ews Pc- 01 No V Historians - 02 Nos , Upgradation Of Existing Sas At Kurnool Ss- Supply Portion - Supply Of Next Generation Fire Walls(Ngfw) As Per The Powergrid Specifications , Upgradation Of Existing Sas At Kurnool Ss- Supply Portion - Monitors- 27 Inch , Upgradation Of Existing Sas At Kurnool Ss- Supply Portion - Loading Of Latest Scada And Other Software Licensed Version In Servers-Hmis- Gateways And Dr-Ews Pcs Compatible With Latest Os Version With Seven Year Patch Support , Upgradation Of Existing Sas At Kurnool Ss- Supply Portion - Configuration And Software Loading In Pc (Supply And Installation Of Antivirus, Network Management System And Other Softwares ) Licensed , Upgradation Of Existing Sas At Kurnool Ss- Supply Portion - Engineering, Loading And Testing & Commissioning Of New Database , Upgradation Of Existing Sas At Kurnool Ss- Supply Portion - Ethernet Switches With 12Cu Plus 12 Fo. , Upgradation Of Existing Sas At Kurnool Ss- Supply Portion - Gps With Powergrid Ts , Upgradation Of Existing Sas At Kurnool Ss- Supply Portion - Inverters 2Kva , Upgradation Of Existing Sas At Kurnool Ss- Supply Portion - Bay Control Unit ( For Swapping During Firmware Upgrdataion) , Upgradation Of Existing Sas At Kurnool Ss- Supply Portion - Patch Cords , Upgradation Of Existing Sas At Kurnool Ss- Service Portion - Final Data Base Modification At Site, Testing And Commissioning Limited To 30 Days , Upgradation Of Existing Sas At Kurnool Ss- Service Portion - Installation And Commissioning Of Next Generation Fire Walls(Ngfw) As Per The Powergrid Specifications , Upgradation Of Existing Sas At Raichur Ss- Supply Portion - Supply Of Industrial Grade Pc With Latest Operating System(Windows 11) With 7 Years Support And With Pc Specifications As Mentioned In Scope Of Worki) Server- 03 Nos Ii) Client- 02 Nos Iii) Gateway- 02 Nos Iv) Dr/Ews Pc- 01 No V)Historians - 02 Nos , Upgradation Of Existing Sas At Raichur Ss- Supply Portion - Supply Of Next Generation Fire Walls(Ngfw) As Per The Powergrid Specifications , Upgradation Of Existing Sas At Raichur Ss- Supply Portion - Monitors- 27 Inch , Upgradation Of Existing Sas At Raichur Ss- Supply Portion - Loading Of Latest Scada And Other Software Licensed Version In Servers -Hmis-Gateways And Dr-Ews Pcs Compatible With Latest Os Version With Seven Year Patch Support , Upgradation Of Existing Sas At Raichur Ss- Supply Portion - Configuration And Software Loading In Pc (Supply And Installation Of Antivirus, Network Management System And Other Softwares ) Licensed , Upgradation Of Existing Sas At Raichur Ss- Supply Portion - Engineering, Loading And Testing & Commissioning Of New Database , Upgradation Of Existing Sas At Raichur Ss- Supply Portion - Ethernet Switches With 12Cu Plus 12 Fo. , Upgradation Of Existing Sas At Raichur Ss- Supply Portion - Gps With Powergrid Ts , Upgradation Of Existing Sas At Raichur Ss- Supply Portion - Inverters 2Kva , Upgradation Of Existing Sas At Raichur Ss- Supply Portion - Bay Control Unit ( For Swapping During Firmware Upgrdataion) , Upgradation Of Existing Sas At Raichur Ss- Supply Portion - Patch Cords , Upgradation Of Existing Sas At Raichur Ss- Service Portion - Final Data Base Modification At Site, Testing And Commissioning Limited To 30 Days , Upgradation Of Existing Sas At Raichur Ss- Service Portion - Installation And Commissioning Of Next Generation Fire Walls(Ngfw) As Per The Powergrid Specifications , Upgradation Of Existing Sas At Nellore Ps- Supply Portion - Supply Of Industrial Grade Pc With Latest Operating System(Windows 11) With 7 Years Support. And With Pc Specifications As Mentioned In Scope Of Worki) Server- 03 Nos Ii) Client- 02 Nos Iii) Gateway- 02 Nos Iv) Dr/Ews Pc- 02 No V)Historians - 02 Nos , Upgradation Of Existing Sas At Nellore Ps- Supply Portion - Supply Of Next Generation Fire Walls(Ngfw) As Per The Powergrid Specifications , Upgradation Of Existing Sas At Nellore Ps- Supply Portion - Monitors- 27 Inch , Upgradation Of Existing Sas At Nellore Ps- Supply Portion - Loading Of Latest Scada And Other Software Licensed Version In Servers -Hmis- Gateways And Dr-Ews Pcs Compatible With Latest Os Version With Seven Year Patch Support , Upgradation Of Existing Sas At Nellore Ps- Supply Portion - Configuration And Software Loading In Pc (Supply And Installation Of Antivirus, Network Management System And Other Softwares ) Licensed , Upgradation Of Existing Sas At Nellore Ps- Supply Portion - Engineering, Loading And Testing & Commissioning Of New Database , Upgradation Of Existing Sas At Nellore Ps- Supply Portion - Ethernet Switches With 12Cu Plus 12 Fo. , Upgradation Of Existing Sas At Nellore Ps- Supply Portion - Gps With Powergrid Ts , Upgradation Of Existing Sas At Nellore Ps- Supply Portion - Inverters 2Kva , Upgradation Of Existing Sas At Nellore Ps- Supply Portion - Bay Control Unit ( For Swapping During Firmware Upgrdataion) , Upgradation Of Existing Sas At Nellore Ps- Supply Portion - Patch Cords , Upgradation Of Existing Sas At Nellore Ps- Service Portion - Final Data Base Modification At Site, Testing And Commissioning Limited To 30 Days , Upgradation Of Existing Sas At Nellore Ps- Service Portion - Installation And Commissioning Of Next Generation Fire Walls(Ngfw) As Per The Powergrid Specifications Total Quantity : 177

BOQ

Sl. No. Item TitleItem Description
1Upgradation of existing SAS at Kurnool SS- Supply PortionSupply of industrial grade PC with latest operating System (Windows 11) with 7 Years Support and with PC specifications as mentioned in SCOPE of worki Server- 02 nos ii Client- 02 nos iii Gateway- 02 nos iv DR-EWS PC- 01 no V Historians - 02 Nos
2Upgradation of existing SAS at Kurnool SS- Supply PortionSupply of Next Generation Fire Walls(NGFW) as per the POWERGRID specifications
3Upgradation of existing SAS at Kurnool SS- Supply PortionMonitors- 27 Inch
4Upgradation of existing SAS at Kurnool SS- Supply PortionLoading of latest SCADA and other software licensed version in Servers-HMIs- Gateways and DR-EWS PCs compatible with latest OS Version with Seven Year patch support
5Upgradation of existing SAS at Kurnool SS- Supply PortionConfiguration and software loading in PC (Supply and installation of Antivirus, Network management system and other softwares ) licensed
6Upgradation of existing SAS at Kurnool SS- Supply PortionEngineering, loading and testing & Commissioning of new database
7Upgradation of existing SAS at Kurnool SS- Supply PortionEthernet Switches with 12CU plus 12 FO.
8Upgradation of existing SAS at Kurnool SS- Supply PortionGPS with POWERGRID TS
9Upgradation of existing SAS at Kurnool SS- Supply PortionInverters 2KVA
10Upgradation of existing SAS at Kurnool SS- Supply PortionBay control Unit ( For Swapping during Firmware Upgrdataion)
11Upgradation of existing SAS at Kurnool SS- Supply PortionPatch Cords
12Upgradation of existing SAS at Kurnool SS- Service PortionFinal Data base modification at site, testing and commissioning limited to 30 days
13Upgradation of existing SAS at Kurnool SS- Service PortionInstallation and commissioning of Next Generation Fire Walls(NGFW) as per the Powergrid Specifications
14Upgradation of existing SAS at Raichur SS- Supply PortionSupply of industrial grade PC with latest operating System(Windows 11) with 7 Years Support and with PC specifications as mentioned in SCOPE of worki) Server- 03 nos ii) Client- 02 nos iii) Gateway- 02 nos iv) DR/EWS PC- 01 no V)Historians - 02 Nos
15Upgradation of existing SAS at Raichur SS- Supply PortionSupply of Next Generation Fire Walls(NGFW) as per the POWERGRID specifications
16Upgradation of existing SAS at Raichur SS- Supply PortionMonitors- 27 Inch
17Upgradation of existing SAS at Raichur SS- Supply PortionLoading of latest SCADA and other software licensed version in Servers -HMIs-Gateways and DR-EWS PCs compatible with latest OS Version with Seven Year patch support
18Upgradation of existing SAS at Raichur SS- Supply PortionConfiguration and software loading in PC (Supply and installation of Antivirus, Network management system and other softwares ) licensed
19Upgradation of existing SAS at Raichur SS- Supply PortionEngineering, loading and testing & Commissioning of new database
20Upgradation of existing SAS at Raichur SS- Supply PortionEthernet Switches with 12CU plus 12 FO.
21Upgradation of existing SAS at Raichur SS- Supply PortionGPS with POWERGRID TS
22Upgradation of existing SAS at Raichur SS- Supply PortionInverters 2KVA
23Upgradation of existing SAS at Raichur SS- Supply PortionBay control Unit ( For Swapping during Firmware Upgrdataion)
24Upgradation of existing SAS at Raichur SS- Supply PortionPatch Cords
25Upgradation of existing SAS at Raichur SS- Service PortionFinal Data base modification at site, testing and commissioning limited to 30 days
26Upgradation of existing SAS at Raichur SS- Service PortionInstallation and commissioning of Next Generation Fire Walls(NGFW) as per the Powergrid Specifications
27Upgradation of existing SAS at Nellore PS- Supply PortionSupply of industrial grade PC with latest operating System(Windows 11) with 7 Years Support. And with PC specifications as mentioned in SCOPE of worki) Server- 03 nos ii) Client- 02 nos iii) Gateway- 02 nos iv) DR/EWS PC- 02 no V)Historians - 02 Nos
28Upgradation of existing SAS at Nellore PS- Supply PortionSupply of Next Generation Fire Walls(NGFW) as per the POWERGRID specifications
29Upgradation of existing SAS at Nellore PS- Supply PortionMonitors- 27 Inch
30Upgradation of existing SAS at Nellore PS- Supply PortionLoading of latest SCADA and other software licensed version in Servers -HMIs- Gateways and DR-EWS PCs compatible with latest OS Version with Seven Year patch support
31Upgradation of existing SAS at Nellore PS- Supply PortionConfiguration and software loading in PC (Supply and installation of Antivirus, Network management system and other softwares ) licensed
32Upgradation of existing SAS at Nellore PS- Supply PortionEngineering, loading and testing & Commissioning of new database
33Upgradation of existing SAS at Nellore PS- Supply PortionEthernet Switches with 12CU plus 12 FO.
34Upgradation of existing SAS at Nellore PS- Supply PortionGPS with POWERGRID TS
35Upgradation of existing SAS at Nellore PS- Supply PortionInverters 2KVA
36Upgradation of existing SAS at Nellore PS- Supply PortionBay control Unit ( For Swapping during Firmware Upgrdataion)
37Upgradation of existing SAS at Nellore PS- Supply PortionPatch Cords
38Upgradation of existing SAS at Nellore PS- Service PortionFinal Data base modification at site, testing and commissioning limited to 30 days
39Upgradation of existing SAS at Nellore PS- Service PortionInstallation and commissioning of Next Generation Fire Walls(NGFW) as per the Powergrid Specifications

AI Tender Summary

OUR REF NO 56278588
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 13-07-2026
Authority
Authority Name Power Grid Corporation Of India Limited
Work Description Bids Are invited for Upgradation Of Existing Sas Upgradation Of Existing Sas At Kurnool Ss- Supply Portion - Supply Of Industrial Grade Pc With Latest Operating System (Windows 11) With 7 Years Support And With Pc Specifications As Mentioned In Scope Of Worki Server- 02 Nos Ii Client- 02 Nos Iii Gateway- 02 Nos Iv Dr-Ews Pc- 01 No V Historians - 02 Nos , Upgradation Of Existing Sas At Kurnool Ss- Supply Portion - Supply Of Next Generation Fire Walls(Ngfw) As Per The Powergrid Specifications , Upgradation Of Existing Sas At Kurnool Ss- Supply Portion - Monitors- 27 Inch , Upgradation Of Existing Sas At Kurnool Ss- Supply Portion - Loading Of Latest Scada And Other Software Licensed Version In Servers-Hmis- Gateways And Dr-Ews Pcs Compatible With Latest Os Version With Seven Year Patch Support , Upgradation Of Existing Sas At Kurnool Ss- Supply Portion - Configuration And Software Loading In Pc (Supply And Installation Of Antivirus, Network Management System And Other Softwares ) Licensed , Upgradation Of Existing Sas At Kurnool Ss- Supply Portion - Engineering, Loading And Testing & Commissioning Of New Database , Upgradation Of Existing Sas At Kurnool Ss- Supply Portion - Ethernet Switches With 12Cu Plus 12 Fo. , Upgradation Of Existing Sas At Kurnool Ss- Supply Portion - Gps With Powergrid Ts , Upgradation Of Existing Sas At Kurnool Ss- Supply Portion - Inverters 2Kva , Upgradation Of Existing Sas At Kurnool Ss- Supply Portion - Bay Control Unit ( For Swapping During Firmware Upgrdataion) , Upgradation Of Existing Sas At Kurnool Ss- Supply Portion - Patch Cords , Upgradation Of Existing Sas At Kurnool Ss- Service Portion - Final Data Base Modification At Site, Testing And Commissioning Limited To 30 Days , Upgradation Of Existing Sas At Kurnool Ss- Service Portion - Installation And Commissioning Of Next Generation Fire Walls(Ngfw) As Per The Powergrid Specifications , Upgradation Of Existing Sas At Raichur Ss- Supply Portion - Supply Of Industrial Grade Pc With Latest Operating System(Windows 11) With 7 Years Support And With Pc Specifications As Mentioned In Scope Of Worki) Server- 03 Nos Ii) Client- 02 Nos Iii) Gateway- 02 Nos Iv) Dr/Ews Pc- 01 No V)Historians - 02 Nos , Upgradation Of Existing Sas At Raichur Ss- Supply Portion - Supply Of Next Generation Fire Walls(Ngfw) As Per The Powergrid Specifications , Upgradation Of Existing Sas At Raichur Ss- Supply Portion - Monitors- 27 Inch , Upgradation Of Existing Sas At Raichur Ss- Supply Portion - Loading Of Latest Scada And Other Software Licensed Version In Servers -Hmis-Gateways And Dr-Ews Pcs Compatible With Latest Os Version With Seven Year Patch Support , Upgradation Of Existing Sas At Raichur Ss- Supply Portion - Configuration And Software Loading In Pc (Supply And Installation Of Antivirus, Network Management System And Other Softwares ) Licensed , Upgradation Of Existing Sas At Raichur Ss- Supply Portion - Engineering, Loading And Testing & Commissioning Of New Database , Upgradation Of Existing Sas At Raichur Ss- Supply Portion - Ethernet Switches With 12Cu Plus 12 Fo. , Upgradation Of Existing Sas At Raichur Ss- Supply Portion - Gps With Powergrid Ts , Upgradation Of Existing Sas At Raichur Ss- Supply Portion - Inverters 2Kva , Upgradation Of Existing Sas At Raichur Ss- Supply Portion - Bay Control Unit ( For Swapping During Firmware Upgrdataion) , Upgradation Of Existing Sas At Raichur Ss- Supply Portion - Patch Cords , Upgradation Of Existing Sas At Raichur Ss- Service Portion - Final Data Base Modification At Site, Testing And Commissioning Limited To 30 Days , Upgradation Of Existing Sas At Raichur Ss- Service Portion - Installation And Commissioning Of Next Generation Fire Walls(Ngfw) As Per The Powergrid Specifications , Upgradation Of Existing Sas At Nellore Ps- Supply Portion - Supply Of Industrial Grade Pc With Latest Operating System(Windows 11) With 7 Years Support. And With Pc Specifications As Mentioned In Scope Of Worki) Server- 03 Nos Ii) Client- 02 Nos Iii) Gateway- 02 Nos Iv) Dr/Ews Pc- 02 No V)Historians - 02 Nos , Upgradation Of Existing Sas At Nellore Ps- Supply Portion - Supply Of Next Generation Fire Walls(Ngfw) As Per The Powergrid Specifications , Upgradation Of Existing Sas At Nellore Ps- Supply Portion - Monitors- 27 Inch , Upgradation Of Existing Sas At Nellore Ps- Supply Portion - Loading Of Latest Scada And Other Software Licensed Version In Servers -Hmis- Gateways And Dr-Ews Pcs Compatible With Latest Os Version With Seven Year Patch Support , Upgradation Of Existing Sas At Nellore Ps- Supply Portion - Configuration And Software Loading In Pc (Supply And Installation Of Antivirus, Network Management System And Other Softwares ) Licensed , Upgradation Of Existing Sas At Nellore Ps- Supply Portion - Engineering, Loading And Testing & Commissioning Of New Database , Upgradation Of Existing Sas At Nellore Ps- Supply Portion - Ethernet Switches With 12Cu Plus 12 Fo. , Upgradation Of Existing Sas At Nellore Ps- Supply Portion - Gps With Powergrid Ts , Upgradation Of Existing Sas At Nellore Ps- Supply Portion - Inverters 2Kva , Upgradation Of Existing Sas At Nellore Ps- Supply Portion - Bay Control Unit ( For Swapping During Firmware Upgrdataion) , Upgradation Of Existing Sas At Nellore Ps- Supply Portion - Patch Cords , Upgradation Of Existing Sas At Nellore Ps- Service Portion - Final Data Base Modification At Site, Testing And Commissioning Limited To 30 Days , Upgradation Of Existing Sas At Nellore Ps- Service Portion - Installation And Commissioning Of Next Generation Fire Walls(Ngfw) As Per The Powergrid Specifications Total Quantity : 177
Basic Detail
Tender No GEM/2026/B/7714204
Bidding Type Tender
Location
City Kurnool
State Andhra Pradesh
Key Dates
Publish Date 03 Jul 2026
Submission Date 13 Jul 2026
Open Date 13 Jul 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
b82ee272-32e1-4809-af74-f9a04cf3501c.pdf
9524063_Boq_1.xlsx
BATC0332_12d1494a-4ce0-43af-9c331782818960881_consigneecpc2.pdf
IP_fefb49fb-cb6a-41aa-a62f1782810103196_consigneecpc2.pdf
merged_ts-specific_requirement-sld_2026-06-26-11-19-30_d85fee94576278d04d9928dc1e27e259.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 03, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 13, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 9 days
Jul 13, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 9 days

Tender Documents

Download All (ZIP) ↓
pdf

b82ee272-32e1-4809-af74-f9a04cf3501c.pdf

xlsx

9524063_Boq_1.xlsx

pdf

BATC0332_12d1494a-4ce0-43af-9c331782818960881_consigneecpc2.pdf

pdf

IP_fefb49fb-cb6a-41aa-a62f1782810103196_consigneecpc2.pdf

pdf

merged_ts-specific_requirement-sld_2026-06-26-11-19-30_d85fee94576278d04d9928dc1e27e259.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders