Tender For Replacement Of Trestle Tower At Agatti Lighthouse In The Ut Of Lakshadweep - Transportation, Errection Of Trestle Tower & Construction Of Service Room For Trestle Tower At Agatti Lh Site.
Tender Overview
Project Description
Tender for Replacement Of Trestle Tower At Agatti Lighthouse In The Ut Of Lakshadweep - Transportation, Errection Of Trestle Tower & Construction Of Service Room For Trestle Tower At Agatti Lh Site.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 23-Jul-2026 | Correction in Accounting Unit of BOQ no. 16 | Financial Bid | 30-Jul-2026 |
| 2 | 23-Jul-2026 | CORRIGENDUM (I) EXTENSION OF DATE | Date | 30-Jul-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Transportation of 30m high GI Trestle tower members from Deep Bhavan, Kochi to Agatti Lighthouse, Agatti Island, Lakshadweep including cost of all loading, unloading, transportation, ship /Manchu/barge rent charges, boat fare charges,tractor and hydra rent charge etc, stacking of materials at Agatti Lighthouse site and all other charges etc. complete as directed. |
| 2 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to Tower height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineerin-charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding. |
| 3 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead Including cost of all labour, tools and plants etc. complete as directed. |
| 4 | Dismantling existing damaged 30m high G.I. trestle tower carefully with out damaging the good members of the trestle tower and stacking materials carefully with numbering for transporting and use at other place where required including cost of labour, tools and plants, scaffolding charges etc. complete as directed. |
| 5 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge including cost of labour, tools and plants, scaffolding charges etc. complete as directed.. |
| 6 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge and cost of all labour, tools and plants,scaffolding etc. complete as directed. |
| 7 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.- Ordinary rock including cost of all labour, tools and plants etc. complete as directed. |
| 8 | Providing and laying in position cement concrete of specified grade 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) excluding the cost of centering and shuttering in foundation and plinth including compacting,curing and cost of all labour,materials tools & plants etc complete as directed. |
| 9 | Providing and laying in position specified grade of reinforced cement concrete 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) excluding the cost of centering, shuttering, finishing and reinforcement,including cost of all labour, tools and plants,vibrator,curing etc. complete as directed.- All work up to plinth level |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level,excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) including cost of all labour, tools and plants etc. complete as directed. |
| 11 | Steel reinforcement of TMT bars of grade Fe-500D or more for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level and cost of all materials, labours, tools and plants etc. complete as directed. |
| 12 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers including cost of all labour,materials tools & plants etc complete as directed. (a) Foundations, footings, bases of columns, etc. for mass concrete |
| 13 | (b) Suspended floors, roofs, landings, balconies and access platform |
| 14 | Providing and laying factory made Precast concrete solid blocks of 200 mm thickness of grade M10 made of C&D waste from approved manufacturer in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all labour,materials tools & plants etc complete as directed. |
| 15 | Providing and laying factory made Precast concrete solid blocks of 200 mm thickness of grade M10 made of C&D waste from approved manufacturer in superstructure above plinth level up to floor V level : Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all labour,materials tools & plants etc complete as directed. |
| 16 | Filling available excavated earth (excluding rock,debris) in trenches, plinth,sides of Trestle foundations etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m including cost of all labour, tools and plants, etc. as directed |
| 17 | Erection of 30m high G.I. trestle tower as per drawing with all bracing, platform, hand rails, ladder, tightening of bolts and nuts with washers, punching for proper holes, g.i welding wherever required and setting up template in position, mounting, fixing anchor foundation bolts in position, leveling, checking diagonals etc. required for erection to tower ,wind speed up to 170KMPH, including cost of all labour, tools and plants, equipments, ropes, pulleys, safety belts, scaffolding charges etc.complete as directed . |
| 18 | Carrying out greasing of foundation bolts, nuts of the trestle tower with multi purpose grease after removal of old grease, cleaning and removal of rust, dust etc and covering with tarpauline including cost of all materials, labour tools and plants etc. complete as directed. |
| 19 | Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand (zone - III) : 6 graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth, including cost of all materials, labour tools and plants etc. complete as directed. |
| 20 | 15 mm cement plaster 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement on the rough side of single or half brick wall and cost of all materials, labour, tools and plants,scaffolding etc. complete as directed. |
| 21 | Plaster drip course/ groove in plastered surface or moulding to R.C.C. projections including cost of all materials, labour, tools and plants,scaffolding etc. complete as directed. . |
| 22 | Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm), including cost of all labour, materials, tools & plants etc complete as directed. |
| 23 | Applying priming coat: With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works. |
| 24 | Painting two or more coats with synthetic enamel paint to 36 M high Trestle Tower and its other components/ accessories of approved brand and manufacture of required colour to give an even shade over an under coat of suitable shade with ordinary paint of approved brand and manufacture after cleaning and preparing the surface at all heights to make an even shade including cost of all materials labours.tools & plants and all charges etc. complete as directed. |
| 25 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length etc complete as directed including cost of all materials, labour, tools & plants, etc. complete as directed - Second class teak wood |
| 26 | Providing and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows, fixing with butt hinges of required size with necessary screws, excluding panelling which will be paid for separately, all complete as per direction of Engineer-in-charge. Second class teak wood- 35 mm thick shutters, including cost of all materials, labours, tools & plants etc. complete as directed. |
| 27 | Providing and fixing glazed shutters for doors, windows and clerestory windows using 4 mm thick float glass panes, including cost of all materials, labour, tools & plants, etc. complete as directed- thick second class teak wood. |
| 28 | Providing and fixing aluminium tower bolts- 150x10 mm, ISI marked, transparent or dyed to required colour or shade, with necessary screws etc. complete, including cost of all materials, labour, tools & plants, scaffolding etc. complete. |
| 29 | Providing and fixing aluminium tower bolts- 100x10 mm, ISI marked, transparent or dyed to required colour or shade, with necessary screws etc. complete, including cost of all materials, labour, tools & plants, scaffolding etc. complete. |
| 30 | Providing and fixing aluminium handles 125 mm , ISI marked, transparent or dyed to required colour or shade, with necessary screws etc. complete, including cost of all materials, labour, tools & plants, scaffolding etc. complete. |
| 31 | Providing and fixing aluminium handles 75 mm , ISI marked, transparent or dyed to required colour or shade, with necessary screws etc. complete, including cost of all materials, labour, tools & plants, scaffolding etc. complete. |
| 32 | Providing and fixing aluminium casement stays,door stopper ISI marked, transparent or dyed to required colour and shade, with necessary screws etc.complete, including cost of all materials, labour, tools & plants, scaffolding etc. complete. |
| 33 | Providing and fixing aluminium sliding door bolts, ISI marked anodised (anodic coating not less than grade AC 10 as per IS : 1868), transparent or dyed to required colour or shade, with nuts and screws etc. complete : 300x16 mm including cost of all materials, labour, tools & plants, scaffolding etc. complete. |
| 34 | Providing and fixing stainless steel butt hinges 100x60x2.5 mm with necessary stainless steel screws etc. as directed including cost of all materials, labour, tools & plants etc. complete . |
| 35 | Providing and fixing stainless steel butt hinges 75x50x2.5 mm with necessary stainless steel screws etc. as directed including cost of all materials, labour, tools & plants etc. complete . |
| 36 | Providing and laying vitrified floor tiles of 600x600mm (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including grouting the joints with white cement and matching pigments etc.including cost of all materials, labour, tools & plants etc. complete . |
| 37 | Providing and laying Vitrified tiles of Glazed Vitrified tiles Matt/Antiskid finish of approved size in floor ,steps(thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid on 20 mm thick cement mortar 1:4 (1 cement:4 coarse sand) jointing with grey cement slurry @3.3 kg/sqm including grouting the joints with white cement and matching pigments etc. The tiles must be cut with the zero chipping diamond cutter only . Laying of tiles will be done with the notch trowel, plier, wedge, clips of required thickness, leveling system and rubber mallet for placing the tiles gently and easily including cost of all labour, tools and plants etc complete as directed. . |
| 38 | Removing the Lantern without damaging from the fixed position before dismantling of the existing trestle tower, keeping it in a safe place, re-erecting the lantern and fixing in position after erection of new trestle tower including cost of all labour, tools and plants etc complete as directed. |
| 39 | Providing and fixing 18 mm thick gang saw cut, mirror polished, premoulded and prepolished, machine cut for Name board, vanity counters, window sills, facias and similar locations of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels. Granite of any colour and shade Area of slab over 0.50 sqm including cost of all materials, labour, tools & plants. |
| 40 | Engraving letters in hard stone / Granite per cm height per letter including cost of all materials, labour, tools & plants etc complete as directed. |
| 41 | Hire charges of mechanized boat 38 / 45 feet for the , embarkation & dis embarkation of dept officials from ship including cost of labour, fuel charges etc complete. |
| 42 | Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal?local authoriy dumping ground for lead upto 10 km for all lifts etc complete as per directions of Engineer-in-charge. |
| 43 | RECOVERY ITEMS - Scrap value of dismantled existing damaged 15m high G.I. trestle tower including cost of all labour, transporation, removing from site and making site clear etc complete Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 5 daysCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 5 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysTender Documents