Water Resources and Irrigation Government Departments Closing in 12 days TDR #56275357

Tender For Construction Of 04 (Four) Nos Single Lane Reinforced Cement Concrete Bridge At Mouza Chak Purusott Ur And Radhaballavpur Over Bhasra Khal In Block & P.S.-Debra, And Mouza Barbasantapur, Jinshar Over Midnapore Main Canal In Block Kharagpur-

Issued by Government Departments · Medinipur West, West Bengal
Tender Value
8.43 Crore
Estimated cost
Bid Submission
24 Jul 2026
12 days left
EMD
10 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Medinipur West → West Bengal
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Construction Of 04 (Four) Nos Single Lane Reinforced Cement Concrete Bridge At Mouza Chak Purusott Ur And Radhaballavpur Over Bhasra Khal In Block & P.S.-Debra, And Mouza Barbasantapur, Jinshar Over Midnapore Main Canal In Block Kharagpur-Ii, P.S.- Kharagpur (Local) In The Dist.- Paschim Medinipur In Connection With Construction Of 133 Numbers Of Reinforced Cement Concrete Bridges Over Drainage Channels And Irrigation Canals As A Part Of Infrastructure Gap Project In The Districts Of Purba Medinipur And Paschim Medinipur In West Bengal (Phase I- 60 Nos Of Reinforced Cement Concrete Bridges In The District Of Paschim Medinipur).(Scheme Id No.Iw/Br/1/2/Package-Ii/Phase-I.)[ 2Nd Call To The 1St Call Of Wbiw/Ctu/Ce(Sw) /E-Nit- 53 (E)/2025-26 , S.L.- 02]

BOQ

Name of Work:- Construction of 04 (four) nos single lane RCC Bridge at Mouza Chak Purusott ur and Radhaballavpur over Bhasra Khal in Block & P.S.-Debra, and Mouza BarBasantapur, Jinshar over Midnapore Main Canal in Block Kharagpur-II, P.S.- Kharagpur (Local) in the Dist.- Paschim Medinipur in connection with Construction of 133 numbers of RCC bridges over Drainage Channels and Irrigation Canals as a part of Infrastructure GAP Project in the districts of Purba Medinipur and Paschim Medinipur in West Bengal (Phase I- 60 Nos of RCC Bridges in the District of Paschim Medinipur).(Scheme ID No.IW/BR/1/2/Package-II/Phase-I.)[ 2nd call to the 1st call of WBIW/CTU/CE(SW) /e-NIT- 53 (e)/2025-26 , S.L.- 02]
Sl. No. Item Description
1Providing Bored Cast-in-situ R.C.C. pile in position as per specifications in all kinds of soil including cost of boring using drilling mud to stabilize the bore and flushing the bore of excess mud with freshly repared drilling fluid by using pumps prior to placing concrete by tremie pipe in one continuous operation and including the cost of all materials and labour for placing of concrete and also including the cost of mobilization and hire charges of all equipment necessary for boring, welding of reinforcement cage as necessary and lowering of reinforcement cage, preparation and placing of concrete, including the cost of concrete but excluding the cost of reinforcement and labour for bending binding etc. complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Work to be executed as per IS: 2911 (Part II Sec 2). Conc. Grade M35. (b) Using tripod, winches i) Pile diameter - 750 mm. Bridge-17
2Bridge-28
3i) Pile diameter - 1000 mm. Bridge-29
4Bridge-30
5Providing MS casing pipe around RCC cast-in-situ bored piles of different diameters in position including cost of all materials, fabrication, handling etc. complete as per direction of Engineer-in- Charge.
6Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge .I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. a) Upto 3m depth (i) With pumping out water including shoring as required.
7b) 3 m to 6m depth. (i) With pumping out water including shoring as required.
8c) Above 6m depth(i) With pumping out water including shoring as required.
9Performing Vertical load test on single Pile in accordance with IS:2911(Part-IV) by hydraulic jacks on pile/piles with 1.5 times the design load including preparation of the head of piles with concrete of required strength for receiving the jacks with all ancillary arrangements for setting up gauges, construction of suitable platforms, keeping the loads and dismantling and removing all arrangement etc. complete as per IS specification and direction of Engineer-in-charge.iii) Testing load between 150 T and 200 T
10Providing and laying Design Mix concrete for plain / reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works.a) M15 Grade (PCC) Using concrete mixerBridge-17
11Bridge-28
12Bridge-29
13Bridge-30
14c) M25 Grade Using concrete mixer Bridge-17
15Bridge-28
16Bridge-29
17Bridge-30
18d) M30 Grade Using concrete mixer Bridge-17
19Bridge-28
20Bridge-29
21Bridge-30
22Cement Concrete for Reinforced Concrete in Pile Cap complete as per drawing and Technical Specification.D) RCC Grade M35Using concrete mixer Bridge-17
23Bridge-28
24Bridge-29
25Bridge-30
26Plain / Reinforced Cement Concrete in Sub structure with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality, cement and water reducing admixtures, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete as per drawing and technical specification including the cost of necessary form work and staging complete as per drawing and technical specifications. G)RCC Grade M35 Hight upto 5m I) Using concrete Mixer Bridge-17
27Bridge-28
28Bridge-29
29Bridge-30
30Furnishing and Placing Reinforced / Pre-stressed Cement concrete in Super-structure with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement and admixtures, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete as per drawing and technical specification including the cost of necessary form work and staging complete. as per drawing and technical specifications. B) RCC/PSC Grade M-35I) Using concrete Mixer(i) For solid slab super- structure(a) Height upto 5m Bridge-17
31Bridge-28
32Bridge-29
33B) RCC/PSC Grade M-40I) Using concrete Mixer(ii) For T-beam & slab,(a) Height upto 5m Bridge-30
34Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with reinforced cement concrete with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer-in-Charge, all as specified.(A) RCC Grade M40 crush barier Bridge-17
35Bridge-28
36Bridge-29
37Bridge-30
38Providing and laying Cement concrete Wearing coat M-30 grade with graded stone chips 19mm down including screening and cleaning approved stone chips and sand as necessary laying, finishing complete to camber and grade, curing with water, including cost and carriage of all materials and hire charges for form work including reinforcement complete as per drawing and Technical Specifications vide clause no. 2702 of MoRT&H’s Specification for Road & Bridge Works.
39Cast-in-situ cement concrete blocks or lining units as per designed section and specification, in nominal mix proportion 1:1.5:3 (corresponding to M20 Grade) with well graded 20 mm down stone metal aggregate, laid in position by casting in alternative panels or otherwise to keep a gap of 12mm between the adjacent units, over a layer of polythene sheet of thickness not less than 100m to act as a separator between the bottom surface of the block and the sand cushion/ filter material laid below the blocks, including dressing, ramming, shuttering, finishing the exposed surface by trowel without adding any additional cement and sand morter, curing and filling the gaps between the adjacent units by 5.6 mm down coarse aggregate to be compactedproperly, with all leads and lifts including supply and carriage of all materials, complete, without the cost of sand cushion/ filter.Stone aggregates of Pakur varieties. Bridge-17
40Bridge-28
41Bridge-29
42Bridge-30
43Supplying, fitting and placing un-coated HYSD bar reinforcement in Bridge Foundation including initial traightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications and direction of Engineer-in-charge.ii) a. Tor Steel rods / HYSD bars / TMT bars (SAIL/ TATA/ RINL )(Fe 415 /Fe 500 /Fe 500D, conforms to IS: 1786) Bridge-17
44Bridge-28
45Bridge-29
46Bridge-30
47Supplying, fitting and placing HYSD bar reinforcement in Sub-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications and direction of Engineer-in-charge.ii) a. Tor Steel rods / HYSD bars / TMT bars (SAIL/ TATA/ RINL )(Fe 415 /Fe 500 /Fe 500D, conforms to IS: 1786) Bridge-17
48Bridge-28
49Bridge-29
50Bridge-30
51Supplying, fitting and placing HYSD bar reinforcement in Bridge Super-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications.ii) a. Tor Steel rods / HYSD bars / TMT bars (SAIL/ TATA/ RINL )(Fe 415 /Fe 500 /Fe 500D, conforms to IS: 1786) Bridge-17
52Bridge-28
53Bridge-29
54Bridge-30
55Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction.b) Where staging is not required
56Providing and laying of Filter media with granular materials/stone crushed aggregates/brick aggregates /river bed materials satisfying the requirements laid down in clause 2504.2.2 of MoRT&H Specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.
57Making filter with well graded 40 mm down ballasts and laying uniformly behind weep holes, below pitching on bed, side slopes including supply and carriage of all materials to site including preparing bed with earthwork up to 30 cm depth, where necessary and compacting with wooden malllet after laying to achieve designed section as per direction of the Engineer- in - Charge (measurements will be on finished work / in stack after deducting necessary void).(b) 1st class brick ballast
58Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 80 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer / supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.
59Providing weep holes in Brick masonry / Plain / Reinforced concrete abutment, wing wall / return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical specifications.
60Sand filling in foundation trenches and at the back of abutments, wing-walls etc. with good local sand free from earth in layers not exceeding 15 cm. including inundating each layer by profuse water and poking and ramming layer by layer complete including supply of sand. Quality of sand is to be approved by the Engineer-in-charge.
61Drainage Spouts in Superstructure including providing drip mouldings and also including supplying,fitting and fixing approved type of materials complete as per drawing and Technical specification vide clause no.2705 of MoRT&H’s Specification for Road & Bridge Works.
62R.C. Guard post Supplying fitting and fixing R.C. guard post 1.37m long with C.C. 1:2:4 with graded stone chips of 13.2mm down casting , curing complete including cost of providing 4nos.of 12mm dia. rod of length 1.54m as main reinforcement and 6 nos. of round shaped 8mm dia rods used as binders; the placing of the first binder should be at 75mm below the top finished surface and the other 5 nos of binders should be placed at 245mm c/c ; the guard post is of octagonal section with inscribed circle of dia 24cm at the base tapering to corresponding dimensions of 16cm at the top including two coats of painting with best quality synthetic enamel paint of approved make and grade to form 6 nos. horizontal alternate bands in white/tannery yellow and black to 90 cm length standing up above ground after mending good damages if any during striking off shuttering, making hole in ground of 47cm depth and 30cm. minimum dia, fixing the guard posts in the same holes and repacking the earth properly so as to keep the guard posts standing properly erect in correct position true to line and length including carriage of R. C. Guard Post with due care to the site including loading into the truck and unloading at site complete in all respect. With Pakur variety stone chips
63Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.
64Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.iii) 15 cm av. Diameter
65Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tacklesiii) 15 cm av. diameter. (Note-for driving by pile engine set)
66Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site.(a) Width of thinner end above 10 cm. and less than 15 cm.(i) Jhaw / Eucalyptus.
67Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg).
68Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag
69Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts.
70Bailing out water by pump including all leads and lifts and including making all arrangements for disposal, where continuous flow or seepage of water is encountered and rating of pumps and hours of operation is specifically ascertained as per direction of the Engineer-in-charge.
71Supplying & laying Double Wall Corrugated (with external annular corrugation and smooth internal walls) High Density Polyethelene Pipes conforming to IS 16098 (Part-I):2013 having Stiffness Class of SN 8 with Ring Stiffness not less than 8.00 KN/Sqm. and Impact Resistance TIR value not more than 10% including necessary jointing materials for onpressure underground Drainage, Sewerage & Cross drainage application. (i) 150mm internal dia.
72Supplying, fitting,fixing CI Grating ( Heavy Type ) (b) above 100 mm and upto 150 mm square or round
73M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1956 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 1957, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for thework including all incidental chages such as electricity charges, labour insurance charges etc. i) For structural members and specified sections weighing less than 22.5 kg./m.
74Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specifications Clause 202 for Rural Roads of MORD. By Mechanical Meansc) Reinforced Cement Concrete
75Supplying, spreading and consolidating Moorum to a depth of 75 mm at desired density and C.B.R. as per specification with power roller to proper gradient and camber including watering as necessary, and lighting, guarding, barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3 days, mending cracks by rolling where necessary including all incidental charges of roller, cost of fuel & lubricants etc. complete as per specification. Bridge-17
76Bridge-28
77Bridge-29
78Bridge-30
79Supplying and laying brick Khoa of ordinary bats of size (38 mmx 63 mm)of approved quality in 100 mm layer (loose) filling in gaps with small ones rammed and compact as directed true to level and grade.
80Taking out bullah wailing pieces after removing nuts, bolts and iron nails and stacking the same within 150 metre from the site of work including sorting out and stacking serviceable meterials.
81Taking out Jhaw / Eucalyptus piles from river bed or from elsewhere including carrying, stacking materials in the nearest stack yard.(a) Up to 17.5 cm. diameter
82Removing earth/sand filled poly bags/gunny bags from the channel bed/slope and initially depositing the same near channel bank at a place as directed by the Engineer-in Charge for measurement of Bag. & then disposing off the same at a distance not less than 150 metre from the channel site.
83Painting the vertical end faces of posts, wheel guards or railing or parapet with alternate bands of different colours as directed by the Engineer-in-charge with approved synthetic enamel paint.b) Two Coat
84Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. In Ground Floor:(a) One Coat
85(a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.
86B) Painting with superior quality aluminium paint of approved make and brand including smoothening surface by sand papering etc. on steel surface :(b) Two coats
87Providing & fixing Concrete Sign Board as per IRC specification of size 900 x 750 x 37 mm. thick made with RCC 1:1½:3 with pakur variety stone chips reinforced with double layer IRC febric (75 x 75 mm. mesh) and fixed with necessary nuts & bolts on two RC precast posts 100 mm. x 150 mm. of height 2.65 m. of which top 750 mm. is of section 100 x 13 mm. and 1.90 metre above GL & 0.75 metre below GL including digging hole, repacking the same with cement concrete 1:3:6 with jhama khoa or with local stone chips etc. complete including painting two coats on both faces lettering sign marks etc. as per direction of the Engineer-in-Charge. (The rate is inclusive of cost of reinforcement, concrete, shuttering, nuts & bolts, washer etc. complete.)
88Earthwork from borrow pits over existing embankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile.
89Earthwork in filling in foundation trenches with good earth in layers not exceeding 15cm. including watering and ramming layer by layer complete with earth obtained from excavation of foundation or from fresh excavation of land arranged by Department within a lead of 150 m.
90Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety Bridge-17
91Bridge-28
92Bridge-29
93Bridge-30
94Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land, including loading, transporting, unloading and stacking with a lllifts bothways and head load where necessary and depositing the same on embankments,clannels,filling depressions in requisite profile,levelling as per direction of the Engineer-in-charge within a lead of,A) Beyond 500 metre and upto 1.00 km
95B) Beyond 1.00 km and upto 2.00 km
96Supplying, fitting and fixing in position true to line and level Elastomeric bearing conforming to IRC: 83 (Part-II) Section IX and Clause 2005 of MoRT&H specifications complete including all accessories as per drawing and Technical Specifications.
97Earthwork in excavation in the canals / drainage channels / borrow pits / River bed / slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge.(a) Ordinary soil / local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56275357
AUTHORITY Government Departments
TENDER VALUE 8.43 Crore
LAST DATE 24-07-2026
Authority
Authority Name Irrigation And Waterways Department
Work Description Tender for Construction Of 04 (Four) Nos Single Lane Reinforced Cement Concrete Bridge At Mouza Chak Purusott Ur And Radhaballavpur Over Bhasra Khal In Block & P.S.-Debra, And Mouza Barbasantapur, Jinshar Over Midnapore Main Canal In Block Kharagpur-Ii, P.S.- Kharagpur (Local) In The Dist.- Paschim Medinipur In Connection With Construction Of 133 Numbers Of Reinforced Cement Concrete Bridges Over Drainage Channels And Irrigation Canals As A Part Of Infrastructure Gap Project In The Districts Of Purba Medinipur And Paschim Medinipur In West Bengal (Phase I- 60 Nos Of Reinforced Cement Concrete Bridges In The District Of Paschim Medinipur).(Scheme Id No.Iw/Br/1/2/Package-Ii/Phase-I.)[ 2Nd Call To The 1St Call Of Wbiw/Ctu/Ce(Sw) /E-Nit- 53 (E)/2025-26 , S.L.- 02]
Basic Detail
Tender No WBIW/CTU/CE(SW) /e-NIT- 13 (e)/2026-27
Bidding Type Tender
Location
City Medinipur West
State West Bengal
Key Dates
Publish Date 03 Jul 2026
Submission Date 24 Jul 2026
Open Date 25 Jul 2026
Finance
Tender Value 8.43 Crore
Tender Fee Ref. Documents
EMD 10 Lakhs
Exemption Available
Document List
BARCHART2.pdf
BOQ_2530679.xls
d86dbac3-313f-4004-8edf-7b5918a00bbd.html
DRAWING02.pdf
OID_0001.pdf
Tendernotice_1 (15).pdf
WB2911.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 03, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 24, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 12 days
Jul 25, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 13 days

Tender Documents

Download All (ZIP) ↓
pdf

BARCHART2.pdf

xls

BOQ_2530679.xls

html

d86dbac3-313f-4004-8edf-7b5918a00bbd.html

pdf

DRAWING02.pdf

pdf

OID_0001.pdf

pdf

Tendernotice_1 (15).pdf

pdf

WB2911.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders