Power Boards / Undertakings / PSU Closing in 2 days TDR #56273602

Tender For Constructing 11 Kv Line Using Covered Conductor And Installing Transformer Kallantharamedu Kanhiradu Under Electrical Section Kodenchery

Issued by Boards / Undertakings / PSU · Thiruvallur, Tamil Nadu
Tender Value
10.94 Lakhs
Estimated cost
Bid Submission
09 Jul 2026
2 days left
EMD
27400
Bank guarantee accepted
Document Fee
5900
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Thiruvallur → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Constructing 11 Kv Line Using Covered Conductor And Installing Transformer Kallantharamedu Kanhiradu Under Electrical Section Kodenchery

BOQ

Name of Work:- CONSTRUCTING 11 KV LINE USING COVERED CONDUCTOR AND INSTALLING TRANSFORMER KALLANTHARAMEDU KANHIRADU UNDER ELECTRICAL SECTION KODENCHERY
Sl. No. Item Description
1Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite.
2Additional rate for excavation of Pit for A type pole in Laterite.
3Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite.
4Doing one cable end termination on HT ABC of sizes Up to 3x150+1x120 sqmm and connecting to existing MVT or other terminals,using the cable end termination kit supplied departmentally including charges for cable jointer etc. complete as per the direction of the departmental officers.
5Additional rate for refitting/redoing one Shackle Set, including reshacling one span, while renewing any type of LT pole.
6Fiting One No MVT on existing cross arm excluding termination work (for One phase) of any rating for 11 kV AB Cable
7Pole numbering using printed Aluminium sheets of 22 SWG having size 20 x 12 cm or Painting the surface of line supports where numbers are to be inscribed, Pole numbers shall be painted in circular / rectangular background, using approved quality anti algal yellow paint in two coat after scraping and cleaning the surface at a height of 2.5 metre above ground level. The number and letters should be in black synthetic enamel paint. The size of the number should be at least 2cm in height x 1.5cm in width. including cost of paint.
8Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt & nut etc.
9Dismantling one section fuse from structure and bringing back to section store.
10Fitting one Additional V cross arm in existing single pole including conveyance of materials.
11Fitting one LT 4 line cross arm on HT or LT existing poles including fitting insulators and binding the same with LT Line.
12Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling.
13Stringing of one km 3 PH 11kV line with XLPE Insulated ACSR Raccoon or equivalant (3 conductors) after fitting insulators, binding conductors to pin insulators using suitable tie and anchoring with wedge type anchoring clamps including cutting and removing tree branches wherever necessary excluding cut point works.
14Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides.
15Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing).
16Drilling hole of various sizes on existing Channel/Cross Arm.
17Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle).
18Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges.
19Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle).
20Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing).
21Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing).
22Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same.
23Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same.
24Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete.
25Additional rate for providing one disc set, PG clamp etc. complete, on any type of HT pole for making cut point.
26Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete.
27Conveyance of one km 11kV line materials from section store/stacking place to the work site (excluding poles).
28Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing.
29Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole including conveyance of materials.
30Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work.
31Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work.
32Providing Strut using LT PSC pole including digging and back filling pit in ordinary soil.
33Fitting and providing one Strut using HT PSC pole including digging and back filling pit in ordinary soil.
34Providing Fly stay for LT pole using LT PSC pole including digging and back filling pit in ordinary soil.
35Cutting trees having girth beyond 30cm but upto and including 60cm (felling trees including cutting of trunks and branches) and removing the root completely and stacking etc. 1 No.
36Cutting trees having girth beyond 60cm but upto and including 120cm (felling trees including cutting of trunks and branches) and removing the root completely and stacking etc. 1 No.
37Cutting trees having girth beyond 120cm but upto and including 180cm (felling trees including cutting of trunks and branches) and removing the root completely and stacking etc. 1 No.
38Fitting one Additional 2.4/3m Channel cross arm (75x40x6mm), in existing 11kV DP including conveyance of materials.
39Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing).
40Erecting one 100kVA Transformer to existing DP and giving connections, including loading from TMR/SRS/other stacking place & unloading at site but excluding cost for transporting transformer.
41Transporting Transformers by hired vehicle to a distance upto 5km and carrying upto 2 numbers of 63/100/160/250kVA Transformers / Ring Main Units excluding loading& unloading charges.
42Replacing one DTR Meter with box of suitable size in the existing Channel/Angle cross arm on DP structure, including fixing of 3 CTs on bus bar, laying and termination of control cable using proper lugs, fixing of meters, control fuses and giving connections including cost of conveyance of materials
43Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling.
44Fitting and erecting one HT Double Pole Structure using A type pole in position including fitting 2 No. channel cross arm, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing).
45Fitting 5 channel cross arms, AB switch, DO fuse, LA(Ord), HT & LT connections upto OH lines, etc. on existing DP structure, Fixing distribution box/provision for one set (3No.) of LT fuses, , drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing & mounting of Transformer on poles.
46Cleaning and levelling of transformer yard/RMU, spreading 40 mm broken stone in yard for a thickness of 10 cm above bed of 10 cm thick 6 mm broken stone, after constructing a curb wall of height 20cm above ground and 10cm below level including cost of all materials and charges for conveying, spreading, consolidating etc.
47Installing following size of perforated pre-painted M.S. cable trays with perforation not more than 17.5%, in convenient sections, joined with connectors, suspended from the ceiling with M.S. suspenders including bolts & nuts, painting suspenders etc as required.300 mm width X 50 mm depth X 1.6 mm thickness.
48Fitting one additional Fuse unit and giving connection from Transformer to fuse and Distribution box to LT OH line.
49Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56273602
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 10.94 Lakhs
LAST DATE 09-07-2026
Authority
Authority Name Kerala State Electricity Board
Work Description Tender for Constructing 11 Kv Line Using Covered Conductor And Installing Transformer Kallantharamedu Kanhiradu Under Electrical Section Kodenchery
Basic Detail
Tender No E-Tender No. PMU/KKD/e-Tender/17/2026-27 Dtd 02-07-2026
Bidding Type Tender
Location
City Thiruvallur
State Tamil Nadu
Key Dates
Publish Date 02 Jul 2026
Submission Date 09 Jul 2026
Open Date 13 Jul 2026
Finance
Tender Value 10.94 Lakhs
Tender Fee 5900
EMD 27400
Exemption Not Available
Document List
af32ceb3-11aa-4767-8c96-c76e26fec3ce.html
BID.pdf
BOQ_1451524.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 02, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 09, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 2 days
Jul 13, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 6 days

Tender Documents

Download All (ZIP) ↓
html

af32ceb3-11aa-4767-8c96-c76e26fec3ce.html

pdf

BID.pdf

xls

BOQ_1451524.xls

pdf

Tendernotice_1.pdf