Supply Of heavy duty elevator
Tender Overview
Project Description
Supply Of heavy duty elevator , design, manufacture, supply,installation,testing, commissioning and maintenance of heavy dut y elevator, gear type 8 person capacity center opening sliding door, with three stops and three openings wit h two years warranty as per rdso/2013/em/spec/0016 (rev.2)-2025, specification. with latest amendment. the rate for camc for a period of 5 years after the completion of regular warranty period of 2 years to be quo ted separately apart from the rate of elevator to evaluate the offer. supply cost includes warranty period of 24 (twenty-four) months from date of commissioning.the provision of sending an sms message to a minimu m of 10 pre-specified phone numbers to identify unusual occurrences should be available in the controller. a necessary rites/rdso/tpi inspection certificate should be produced before supply, and related charges shou ld be borne by the contractor. location : sbc sickline tool box room building. [ warranty period: 24 months after the date of delivery ] ] , camc of heavy duty elevator. [ warranty period: 2 years, amc period: 10 years, rate of discounting: 10 % ] ]
BOQ
| Sl. No. | Item Description |
|---|---|
| 1 | Design, Manufacture, supply,installation,testing, commissioning and maintenance of heavy dut y elevator, gear type 8 person capacity center opening sliding door, with three stops and three openings wit h two years warranty as per RDSO/2013/EM/SPEC/0016 (Rev.2)-2025, specification. with latest amendment. The rate for CAMC for a period of 5 years after the completion of regular warranty period of 2 years to be quo ted separately apart from the rate of elevator to evaluate the offer. Supply cost includes warranty period of 24 (twenty-four) months from date of commissioning.The provision of sending an SMS message to a minimu m of 10 pre-specified phone numbers to identify unusual occurrences should be available in the controller. A necessary RITES/RDSO/TPI inspection certificate should be produced before supply, and related charges shou ld be borne by the contractor. Location : SBC sickline tool box room building. [ Warranty Period: 24 Months after the date of delivery ] ] |
| 2 | CAMC of heavy duty elevator. [ Warranty Period: 2 years, AMC Period: 10 years, Rate of Discounting: 10 % ] ] |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 17 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender